Attachment B - Special Provisions Summary
This document is a Special Provisions attachment to an Invitation to Bid (ITB) issued by the Oregon Department of Transportation (ODOT) for an inlay paving project on Oregon Highway 22, mileposts 19.7 to 25.6 near Lyons in Lake County. The special provisions modify specific sections of ODOT's 2024 Standard Specifications and establish detailed requirements for traffic control, pavement work, and marking installation. Key work areas addressed include mobilization, public traffic accommodations, work zone traffic control, temporary signage, environmental protection, cold plane pavement removal, asphalt tack coat application, and asphalt concrete pavement installation with statistical acceptance criteria. Notable specifications include restrictions on lane closures with no weekend or holiday closures permitted, no closures during commute times (6 AM-9 AM and 4 PM-6 PM Monday-Thursday), and requirement that all highway work be completed by noon on Fridays. The contractor must submit either an Agency-provided Traffic Control Plan or a contractor-modified plan for approval at least five calendar days before the preconstruction conference. Approximately 150 tons of emulsified asphalt tack coat will be required, with no separate payment for this material.
The special provisions establish extensive asphalt concrete pavement acceptance criteria based on statistical sampling with sublot sizes of 1,000 tons (200 tons for compaction testing) and lot sizes up to 10,000 tons. Pavement smoothness requirements are stringent, with International Roughness Index (IRI) testing required on all traffic lanes within 14 calendar days of completion, using profiling equipment certified per ODOT standards. Price adjustments for smoothness range from $500 bonus for IRI values below 35.0 inches per mile to penalties calculated at $20 per IRI point above certain thresholds, with segments exceeding 95.0 inches per mile requiring corrective action at contractor expense. Core correlation of nuclear gauge readings is required for lifts containing more than 2,500 tons of asphalt concrete pavement, with no additional cost to the Agency for correlations requested by the contractor or required due to material source changes. High-performance pavement markings are required with payment limited to 75 percent until warranty documentation is received. The contract includes detailed quality control requirements for cracking index testing, mix design verification, and longitudinal joint construction specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00013940_Bid tab.xlsx | XLSX spreadsheet | |
| Notice to award~3.pdf | ||
| 00013940_Att C_Bid Pricing Form.xlsx | XLSX spreadsheet | |
| 00013940_ITB.docx | DOCX document | |
| 00013940_Att A_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B – Special Provisions
These Special Provisions identify and modify certain sections of the Standard Specifications which are incorporated into this ITB and resulting Contract in ITB section C.2.6. The Standard Specifications are available online at:
https://www.oregon.gov/odot/Business/Specs/2024_STANDARD_SPECIFICATIONS.pdf
Number references in the special provisions shall be understood to refer to the sections and subsections of the Standard Specifications bearing like numbers.
TABLE OF CONTENTS FOR SPECIAL PROVISIONS
| SECTION 00210 - MOBILIZATION | 2 |
| SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC | 2 |
| SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL | 2 |
| SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS | 4 |
| SECTION 00290 - ENVIRONMENTAL PROTECTION | 4 |
| SECTION 00620 - COLD PLANE PAVEMENT REMOVAL | 4 |
| SECTION 00730 - EMULSIFIED ASPHALT TACK COAT | 4 |
| SECTION 00745 - ASPHALT CONCRETE PAVEMENT - STATISTICAL ACCEPTANCE | 5 |
| SECTION 00748 - ASPHALT CONCRETE PAVEMENT REPAIR | 13 |
| SECTION 00855 - PAVEMENT MARKERS | 13 |
| SECTION 00857 - RUMBLE STRIPS | 13 |
| SECTION 00866 - LONGITUDINAL PAVEMENT MARKINGS - HIGH PERFORMANCE | 14 |
| SECTION 00867 - TRANSVERSE PAVEMENT MARKINGS - LEGENDS AND BARS | 14 |
PROFESSIONAL OF RECORD CERTIFICATION:
| Seal w/signature |
| I certify the Special Provision Sections listed in this section are applicable to the design for the subject project and modified Special Provisions were prepared by me or under my supervision. |
Sections: All listed in table of contents 06/30/2026
FINAL ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
SPECIAL PROVISIONS
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
Traffic Lanes may be closed on the North Santiam Highway (162) when allowed, shown, or directed during the following periods of time:
Single Lane Closures – Work shall not occur on the North Santiam Highway (162) during the following times:
No Holiday or weekend closures No lane closures during commute times (6AM-9AM and 4PM-6PM Monday-Thursday).
Off highway by noon on Friday. (9:00am-12:00pm)
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.06 Traffic Control Plan ‑ Replace this subsection with the following subsection:
00221.06 Traffic Control Plan and Tourist-Oriented Directional and Business Logo Signs –
(a) Traffic Control Plan - Submit one of the following, 5 Calendar Days before the preconstruction conference:
(1) Agency Traffic Control Plan ‑ If the Contractor intends to use the Agency TCP without modification, a written notification indicating that the Agency TCP will be used without modification.
(2) Contractor-Modified Traffic Control Plan ‑ The Contractor may request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor. Do not use a modified TCP, or a TCP developed by the Contractor, unless approved by the Engineer. Use the Agency TCP unless a modified TCP, or a TCP developed by the Contractor is accepted.
The Engineer is not obligated to consider any modified Agency TCP or a TCP developed by the Contractor. The Agency will not be liable to the Contractor for failure to accept or act upon any request for a modified Agency TCP or a TCP developed by the Contractor.
To conserve time and funds, the Contractor may first submit a written request for a preliminary review by the Engineer. The request should contain a description of the proposal together with a rough estimate of anticipated dollar and time impacts. The Engineer will, within a reasonable time, respond to the Contractor in writing whether or not the request would be considered by the Agency.
If requesting a Contractor-modified Agency TCP, or a TCP developed by the Contractor, at a minimum the request shall meet all requirements of the Contract documents and comply with the Project transportation management plan (TMP). Provide the following information:
Stamped Working Drawings according to 00150.35 that include the proposed TCP showing all TCM and quantities of TCD.
A TPAR plan that includes:
Details and features used to provide pedestrian accessibility.
Pedestrian staging Plans at a scale no smaller than 1 inch = 50 feet.
Temporary alternate facilities or detour routes for pedestrian traffic.
Staging sequences and details for Work affecting vehicular, pedestrian, and bicycle traffic.
Proposed order and duration of the TCM.
A detailed temporary striping plan.
If the Contractor’s request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor is approved in whole or in part, acceptance will be made by a Change Order.
The Engineer will establish prices that represent a fair measure of the value of Work to be added, changed, or deleted as a result of any accepted modifications to the Agency TCP or an accepted TCP developed by the Contractor.
Once a TCP has been accepted by the Engineer, any additional modifications must be submitted by the Contractor for Agency review following the procedure described above. The Engineer is not obligated to consider additional modifications to a previously approved TCP.
(b) Tourist-Oriented Directional and Business Logo Signs ‑ Submit one of the following for approval, at least 5 Calendar Days before the preconstruction conference:
(1) No Signs ‑ If there are no tourist-oriented directional (TOD) or business logo signs on the Project, a written notification that no TOD or business logo signs exist within the Project limits or
(2) Signs ‑ Submit one copy of a sketch map of the Project showing all existing TOD and business logo signs and a written narrative describing how these signs will be kept in service and protected throughout all the construction stages. If modifications are necessary, submit updated information to the Engineer for approval at least 21 Calendar Days before the change is needed.
00221.90(b) Temporary Protection and Direction of Traffic – Replace the bullet that begins “Providing, Surfacing, maintain…” with the following bullet:
Providing, surfacing, maintaining, removing, and restoring the TPAR.
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
Comply with Section 00222 of the Standard Specifications modified as follows:
00222.45(b) Portable Changeable Message Signs - Add the following bullet to the end of this subsection:
At least seven Calendar Days before the work begins, place one PCMS in both the WB and EB directions of OR22, displaying the following message or as directed during the preconstruction conference:
| Panel 1 |
| Panel 2 |
| ROAD |
| MON THRU |
| WORK |
| THURS |
| MP19-26 |
| DAILY |
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications.
SECTION 00620 - COLD PLANE PAVEMENT REMOVAL
Comply with Section 00620 of the Standard Specifications.
SECTION 00730 - EMULSIFIED ASPHALT TACK COAT
Comply with Section 00730 of the Standard Specifications modified as follows:
00730.11 Emulsified Asphalt – Replace the sentence that begins “Furnish CSS-1, CSS-1h…” with the following sentence:
Furnish CSS-1, CSS-1h, CMS-2, CMS-2S, CMS-2h, CRS-1, CRS-2, HFRS-2, HFMS-2 or HPTC as selected by the Contractor.
00730.80 Measurement - Replace this subsection, except for the subsection number and title, with the following:
The quantities of Emulsified Asphalt used as tack will be measured on the weight basis.
00730.90 Payment - Replace this subsection, except for the subsection number and title, with the following:
No separate or additional payment will be made for Emulsified Asphalt tack coat. Approximately 150 Tons of Emulsified Asphalt in tack coat will be required on this Project.
SECTION 00745 - ASPHALT CONCRETE PAVEMENT - STATISTICAL ACCEPTANCE
Comply with Section 00745 of the Standard Specifications modified as follows:
00745.02 Definitions -
Replace the sentence that begins “Sublot Size - A sublot is…” with the following paragraphs:
Sublot Size ‑ Except for compaction, a sublot is 1000 Tons. The final sublot for a JMF may be increased up to a maximum of 1,500 Tons, if the production total does not reach the random number for the sublot.
A compaction sublot is 200 Tons. The final compaction sublot for a JMF may be increased up to a maximum of 400 Tons, if the production total does not reach the random number for the sublot.
Add the following definition:
Localized Roughness - An area that exceeds 160.0 inches per mile in a continuous International Roughness Index (IRI) evaluation over a 25.0-foot base length.
Replace the definition “Lot Size” with the following definition:
Lot Size ‑ A lot consists of up to 10,000 Tons of ACP, with a maximum of 20,000 Tons for the final lot per JMF. The following circumstances will require a different lot:
A new JMF is used. A JMF adjusted according to 00745.16 is not considered a new JMF The method for measuring compaction is changed A new compaction specification limit is required according to 00745.49(b)(3) A change from one test procedure for measuring asphalt content to another test procedure for measuring asphalt content occurs.
The Engineer may allow Material for irregular areas not completed during the main paving operations, such as driveways or guardrail flares, to be evaluated as a separate lot.
00745.11(b) Asphalt Cement Additives – Delete the bullet that begins “Anti-stripping asphalt cement…”
00745.13(b) Performance Test – Add the following paragraphs to the end of this subsection:
Perform cracking index (IDEAL-CT) testing according to ASTM D8225 on three laboratory-prepared asphalt mixture samples. Prior to test specimen fabrication, perform long-term aging on the loose ACP mixture for 24 hours at 95° C.
Alternatively, prepared and aged specimens can be sent into the Central Materials Laboratory for IDEAL-CT testing. Test results will be for informational purposes only.
00745.14 Tolerances and Limits ‑ Replace the line “Asphalt Cement - AASHTO… with the following line:
Asphalt Cement - AASHTO T 308 (Ignition) and ODOT TM 323 JMF ± 0.35%
00745.16(a)(1) Personnel Requirements - Add the following bullet after the first bulleted item:
Performing ACP grade sampling with personnel approved by the Engineer.
00745.16(a)(3) Production Sampling and Testing - Replace this subsection, except for the subsection number and title, with the following:
Perform ACP sampling according to AASHTO R97. Allowable sampling methods are as follows:
• Paver auger
• Windrow
• Roadway before compaction (Method 1)
The sampling personnel shall be available for sampling within 15 minutes of notification from the Engineer. A change in the sampling method or personnel must be approved by the Engineer.
00745.16(a)(4) Testing Frequency - Add the following paragraphs after the first paragraph:
The Engineer will use random numbers to identify the ACP sampling locations according to ODOT TM 400. Notify the Engineer when a sublot requires accelerated testing to achieve the required QC tests.
00745.16(b)(1)(c) Mix Design Verification Requirements at Start-Up - Add the following paragraph to the end of this subsection:
For the MDV start-up process only, sampling may be performed at the plant or in the field.
Add the following subsection:
00745.16(b)(1)(g) Crack Index Testing - Perform cracking index (IDEAL-CT) testing according to ASTM D8225 on randomly selected samples. Conduct the testing at a frequency of once per lot or a minimum of three tests, whichever is greater. Prior to fabrication of the test specimen, perform long-term aging on the loose ACP mixture for 24 hours at 95° C.
Alternatively, prepared and aged specimens can be sent into the ODOT Materials Laboratory for IDEAL-CT testing. Test results will be for informational purposes only.
00745.46(b) Depositing - Replace the paragraph that begins "Deposit ACP from..." with the following paragraph:
Deposit ACP from the hauling vehicles so segregation is prevented. Do not deliver the ACP directly into the paving machine for wearing Courses where the continuous length of the Panel is greater than 500 feet. Deliver the ACP to the paving machine by either a windrow pick-up machine or an end-dump transfer machine.
00745.47(a)(2) Wearing Course ‑ Replace this subsection, except for the subsection number and title, with the following:
Construct longitudinal joints six inches from permanent lane markings, or as shown or directed.
00745.48(c) Bridge Deck Overlays ‑ Replace the paragraph that begins "Sawcut the wearing Course of Pavement …" with the following paragraph:
Sawcut the wearing or base Course of Pavement directly over the joints in bridge decks, bridge end joints and end Panel end joints as soon as practical but within 48 hours of paving each stage of the wearing or base Course, unless otherwise directed. Saw the cut 3/8 inch wide, ± 1/8 inch, by 1/2 inch less than the thickness of the Panel of Pavement depth or 1 1/2 inches deep, whichever is less.
00745.49(b)(1) General ‑ Replace the paragraph that begins “Have the CDT notify the Engineer…” with the following paragraph:
Have the CDT notify the Engineer and CAT-II when a density test is less than 90.0 percent or exceeds 95.9 percent of MAMD. Initiate an investigation to determine if the results indicate that a problem with the mix is developing. Electronically submit the results and recommendations of the CAT-II’s investigation to the Engineer within two shifts of the density test. An adjustment to the JMF will not be allowed unless MDV testing supports a required change.
00745.49(b)(2) Random Testing ‑ Replace the paragraph that begins “Determine the density of each sublot by averaging…” with the following paragraphs:
Correspond lots and compaction sublots with those defined in 00745.02. Provide one density test location for each compaction sublot. Notify the Engineer when rolling operations are completed in a compaction sublot and it is ready for test location identification. The Engineer will use stratified random numbers to locate the QC tests according to ODOT TM 400 Annex. ODOT TM 400 Annex is available from the Engineer. The Engineer will mark where the QC tests are to be performed.
Allow 30 minutes for the Engineer to locate the final test locations after completion of finish rolling and any additional time required for testing, prior to opening the travel lane to traffic. Have the CDT locate and document the test locations not identified within this time frame.
00745.49(b)(2)(b) Core Correlation of Nuclear Gauge Readings - Replace this subsection, except for the subsection number and title, with the following:
For each Lift on the Project that contains more than 2,500 Tons of ACP, correlate each nuclear gauge that will be used on that Lift. Perform core correlations and determine core correlation factors according to AASHTO T 355 and ODOT TM 327. Provide bulk specific gravity values to the Engineer within 24 hours of coring. If an Aggregate source or the asphalt cement source changes, new core correlations are required.
Apply correlation factors to all nuclear gauge readings for the Lift on which the core correlation was performed.
Both the Engineer and the Contractor may request additional core correlation of nuclear gauge readings. Core correlations requested by the Contractor or that are required due to a change in Aggregate or asphalt cement source will be at no additional cost to the Agency.
00745.49(b)(4) Test Results ‑ In the paragraph that begins “Provide density results…” replace the word “sublots” with the words “compaction sublots”.
Add the following subsection:
00745.51 Opening Sections to Traffic - Schedule Work so that, during the same shift, the surfaces being paved are paved full width and length through the wearing Course before opening to traffic.
00745.70 Pavement Smoothness - Replace this subsection, except for the subsection number and title, with the following:
Construct the Pavement wearing surface of Traffic Lanes to a profile that does not deviate from longitudinal and transverse smoothness more than the specified limits of 00745.73.
Perform profiling and straightedge testing under the supervision of the Engineer with Equipment furnished and operated by the Contractor at no additional cost to the Agency, according to ODOT TM 772. Complete all required smoothness testing no later than 14 Calendar Days following final completion of all Traffic Lane paving on the Project, or by October 15 of each calendar year for multiple year projects, whichever is earlier. The Contractor accepts the risk that the smoothness may be affected by exposure to traffic between the date the Traffic Lanes are paved and the date the smoothness testing is completed. If the Contractor elects to perform smoothness measurements on a Day other than the Day the Pavement is placed, additional traffic control required for smoothness measurement, and not required for other Work, will be at no additional cost to the Agency.
Add the following subsection:
00745.72 Smoothness Testing Equipment - Furnish all Equipment and supplies for determining smoothness.
(a) Straightedge - Provide one 12 foot straightedge.
(b) Profiler - Provide a profiling device meeting the requirements of ODOT TM 772 and certified according to ODOT TM 769.
Provide competent and experienced operator(s) for the Equipment, certified with the profiler according to ODOT TM 769. The profiler operator shall meet with the Engineer at a mutually agreed upon time prior to beginning smoothness measurements to discuss all aspects of smoothness measurement on the Project.
Add the following subsection:
00745.73 Smoothness Testing and Surface Tolerances - Test according to the following:
(a) General - Test the Base Course with a 12 foot straightedge as directed. Test the wearing Course with the profiler meeting the requirements of 00745.72(b). Compute the IRI from the profile data according to the procedures described in ODOT TM 772. Price adjustment for smoothness will be made according to 00745.96.
Before performing any smoothness measurements on the Project, verify calibration of the profiler according to the manufacturer’s recommendations and ODOT TM 772.
(b) Surface Test:
(1) Transverse - Test the Base Course with the 12-foot straightedge perpendicular to the centerline, as directed. The Pavement surface shall not vary by more than 1/4 inch.
(2) Longitudinal - Test all Base or wearing Course sections of Pavement that are not required to be profiled according to 00745.73(c) with the 12-foot straightedge parallel to the centerline and lane dividers, as directed. The Pavement surface shall not vary by more than 1/4 inch.
(c) Wearing Course Surface Test:
(1) Transverse - Test with the 12-foot straightedge perpendicular to the centerline, as directed. The Pavement surface shall not vary by more than 1/4 inch.
(2) Longitudinal - Perform testing as follows:
a. Quality Control - Run the profiling device over each Traffic Lane for the full length of the Project.
In the presence of the Engineer and according to ODOT TM 772, obtain profiles on the Pavement surface in the right and left wheel path of the Traffic Lane along a line parallel to permanent longitudinal Pavement markings, at 3-foot and 9-foot offsets from the left edge of the Traffic Lane. Take the profile on transition areas of entrance and exit ramps, as close to the right and left wheel path of the through Traffic Lane as practical. Submit data files to the Engineer at the completion of each shift in which profiling has taken place. For the Pavement sections tested, provide the raw data files and provide electronic copies of the profile data in PPF and manufacturer proprietary formats, as required by the Engineer.
Analyze profiles according to 00745.73(d), and give the results to the Engineer no later than 24 hours following completion of required smoothness. The results shall consist of a table showing areas of Localized Roughness in each wheel path, and the left wheel path IRI, right wheel path IRI, and mean IRI (average of left and right wheel path IRI) at 0.10 mile intervals.
b. Quality Assurance - At the discretion of the Engineer, the Agency may perform Quality Assurance of Profiles on projects according to ODOT TM 772.
(3) Transverse Joints - Test with the 12-foot straightedge parallel to the centerline, as directed. The Pavement surface shall not vary by more than 1/4 inch.
(d) Determination of the International Roughness Index:
(1) General - Determine the IRI in 0.10 mile segments and partial segments of the wearing Course. Begin segments 50 feet into the Project and run consecutively in the direction of travel. A segment ends as a partial segment and a new segment begins when the segment sequence is interrupted by stage construction or by profiled areas excluded from the smoothness requirements. Minimize the number of partial segments.
The following areas of Pavement are excluded from IRI smoothness requirements and are not profiled:
Profiles extending beyond the Project ends.
Bridge decks, Bridge end panels, and Pavement within 50 feet of Bridge end panels.
First and last 50 feet of the ACP paving limits of the Project.
The 50 feet before and after No Work Areas within the Project limits.
Ramps and auxiliary lanes that are less than 2500 feet in length.
First 800 feet of entry ramps and the last 800 feet of exit ramps.
The 25 feet before and after Utility appurtenances in the Traffic Lane.
Continuous portions of Traffic Lanes with less than 0.05 mile between excluded areas.
Portions of the Project with posted speed limits less than 45 mph.
Locate ACP IRI profiling excluded areas prior to smoothness measurement. Areas excluded from longitudinal profile measurement shall meet the straightedge requirements of 00745.73(b)(2).
(2) Method of Analysis - Determine the IRI for each wheel path and areas of Localized Roughness for each wheel path according to ODOT TM 772. Submit the results to the Engineer for review.
(e) Shoulders and Paved Medians - Test the Base and wearing Course with the 12‑foot straightedge parallel to and perpendicular to the centerline for Shoulders and paved Medians, as directed by the Engineer. The Pavement surface shall not vary by more than 1/4 inch.
00745.75 Correction of Pavement Roughness - Replace this subsection, except for the subsection number and title, with the following:
If testing described in 00745.73 shows that the Pavement does not conform to the prescribed limits, the following applies:
(a) General - The Contractor is responsible for locating areas that require corrective work.
(b) Base Course - If the requirements of 00745.73(b) are not met, correct according to one of the following and retest:
(1) Cold Plane Removal - Profile grind with Equipment meeting the requirements of 00620.20 to a maximum depth of 0.4 inch.
(2) Grinder - Profile grind with abrasive grinder(s), equipped with a cutting head comprised of multiple diamond blades to a maximum depth of 0.4 inch.
(c) Wearing Course - After locating each area of Localized Roughness and the 0.10 mile segments that have an average IRI value greater than 95.0 inches per mile, meet with the Engineer at a mutually agreed upon time and drive the Project together. During the drive-through, evaluate each area of Localized Roughness between 160.0 and 189.9 inches per mile and partial segments with an average IRI value greater than 95.0 inches per mile to determine if corrective Work is required. All 0.10 mile segments with an IRI value more than 95.0 inches per mile and all areas of Localized Roughness equal to or greater than 190.0 inches per mile require corrective action. Disagreements will be resolved by the Engineer.
Correct all areas of Localized Roughness, segments and partial segments identified for corrective work, and any transverse joint and excluded areas that exceed the requirements of 00745.73, by one of the methods listed below and to the specified limits:
(1) Remove and Replace - Remove and replace the wearing surface lift.
(2) Grind - Profile grind with abrasive grinder(s) equipped with a cutting head comprised of multiple diamond blades to a maximum depth of 0.3 inch and apply an emulsion fog seal according to Section 00705, or as directed. Half or full lane width corrective grinding is required for areas requiring correction in one or both wheel paths as shown by the Localized Roughness, respectively. Perform corrective grinding in such a manner that the shedding of water is not interrupted across the travel lanes due to the grinding.
Following corrective work, the Engineer will re-evaluate all corrected areas for acceptance. The Engineer may require retesting per ODOT TM 772 and 00745.73. Further corrective Work may be required. Perform all corrective Work and retesting, including traffic control, at no additional cost to the Agency.
(d) Time Limit - Complete correction of all surface roughness prior to application of permanent Pavement markings within 14 Calendar Days following notification, unless otherwise directed.
00745.80 Measurement - Add the following paragraph to the beginning of this subsection:
The quantities of ACP shown in the Contract Schedule of Items were computed on the basis of Aggregates having a specific gravity of 2.60.
Add the following paragraph to the end of this subsection:
The quantities of core correlation of nuclear gauge readings will be measured on the unit basis for each core correlation test that is completed and accepted according to ODOT TM 327. Core correlations that are requested by the Contractor or that are required due to a change in Aggregate or asphalt cement source will not be measured.
00745.90 Payment -
Add the following Pay Item to the Pay Item list:
(c) Core Correlation of Nuclear Gauge Readings……………..Each
Add the following paragraph after the paragraph that begins "In item (b)…":
Item (c) includes developing core correlation factors for all gauges to be correlated for the lift on which the core correlation was performed, according to the procedure in ODOT TM 327.
00745.95 Price Adjustments - Add the following two paragraphs after the bullet that begins “The adjusted target…”
If the Pay Factor (PF) for compaction is 1.00 or greater as calculated in 00165.40, use that compaction PF for the lot. If the PF for compaction is below 1.00, re-calculate the PF for compaction using a lower specification limit (LSL) of 91.5. The compaction PF re-calculated using a LSL of 91.5 will not exceed 1.00. The minimum PF of 1.00 described in 00165.40(d)(8) does not apply when re-calculating the compaction PF.
A completed lot with a CPF of between 0.95 and 1.00 will be accepted, subject to a price adjustment according to 00150.25. The basis of adjustment will be the CPF as calculated in 00165.40.
Add the following subsection:
00745.96 Smoothness Price Adjustment - No separate or additional payment will be made for smoothness testing.
(a) General - A price adjustment based on the results of the IRI will be made for each 0.10 mile segment or partial segment of Traffic Lane ACP requiring IRI measurement according to 00745.73. The price adjustment will be based on the IRI values determined according to ODOT TM 772 for each 0.10 mile segment and partial segment. Partial segments less than 0.10 mile in length shall be evaluated with the IRI price adjustment value multiplied by the ratio of the partial segment length to 0.10 mile.
A smoothness price adjustment will be made for all segments, or partial segments based on the average IRI value and the following equations:
Schedule 1
Averaged IRI (inches/mile) Equation
| ≤ 35.00 |
| Y = $500.00 |
| 35.01 ‑ 60.00 |
| Y = ( $20.00 × X) + $1,200.00 |
| 60.01 ‑ 65.00 |
| Y = $0.00 |
| 65.01 ‑ 95.00 |
| Y = ( $20.00 × X) + $1,300.00 |
| > 95.00 |
| Corrective Action |
Y = The price adjustment for the segment or partial segment X = The averaged IRI value for the segment or partial segment
Any positive smoothness price adjustment due to the Contractor will be made on the next monthly progress estimate following the satisfactory completion of all corrective Work and the submission of all test data for all Traffic Lane paving on the Project.
00745.96(b) applies when corrective action is taken by the Contractor, or the Engineer elects to not correct identified Areas of Localized Roughness according to 00745.75(c).
(b) Adjustments for Sections Requiring Corrective Work or with Areas of Localized Roughness - Segments or partial segments in which corrective Work is performed according to 00745.75(c) are subject to the price adjustments described in 00745.96(a) except that no positive price adjustment (bonus) will be due to the Contractor If a segment or partial segment containing corrective Work is retested according to ODOT TM 772 and 00745.73, the retested average IRI value will be used for payment, except that no positive price adjustment will be made for a segment or partial segment containing corrective work.
No segment or partial segment containing an area of Localized Roughness with a value of 160.0 inches per mile or greater will be eligible for positive price adjustment, even if corrective action is not required by the Engineer.
Segments or partial segments containing corrective Work with an IRI value of more than 95.0 inches per mile are subject to additional corrective action and retesting according to 00745.75(c). The Engineer may waive corrective action in partial segments with the application of a smoothness price adjustment based on an IRI value of 95.0 inches per mile.
SECTION 00748 - ASPHALT CONCRETE PAVEMENT REPAIR
Comply with Section 00748 of the Standard Specifications.
SECTION 00855 - PAVEMENT MARKERS
Comply with Section 00855 of the Standard Specifications.
SECTION 00857 - RUMBLE STRIPS
Comply with Section 00857 of the Standard Specifications.
SECTION 00866 - LONGITUDINAL PAVEMENT MARKINGS - HIGH PERFORMANCE
Comply with Section 00866 of the Standard Specifications modified as follows:
00866.90 Payment ‑ Replace this subsection, except for the subsection number and title, with the following:
The accepted quantities of Work performed under this Section will be paid for at the Contract unit price, per unit of measurement, for the following items:
Pay Item Unit of Measurement
Method 1 (Extruded)
| (a) | Hi-Build Paint, Extruded, ____ | Foot |
| (b) | Hi-Build Paint, Extruded, Wet Weather, ____ | Foot |
Method 2 (Sprayed)
| (c) | Plural Component, Sprayed, ____ | Foot |
| (d) | Plural Component, Sprayed, Wet Weather, ____ | Foot |
| (e) | Hi-Build Paint, Sprayed, ____ | Foot |
| (f) | Hi-Build Paint, Sprayed, Wet Weather, ____ | Foot |
Method 1-2 (Extruded or Sprayed)
| (g) | Hi-Build Paint, Extruded or Sprayed, ____ | Foot |
| (h) | Hi-Build Paint, Extruded or Sprayed, Wet Weather, ____ | Foot |
The word “Surface” or “Grooved” will be inserted in the blank.
Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified.
Payment for Work under this Section will be limited to 75 percent of the amount due until the Agency has received the signed Warranty.
SECTION 00867 - TRANSVERSE PAVEMENT MARKINGS - LEGENDS AND BARS
Comply with Section 00867 of the Standard Specifications.