This is a set of construction plans prepared by the Oregon Department of Transportation (ODOT) for an inlay paving project on Oregon Highway 22 (North Santiam Highway) in Marion County. The project encompasses a 5.9-mile roadway segment from milepost 19.7 to 25.6, with construction planned to begin at the intersection of OR22 and Stout Lane SE. The proposed work involves 2 inches of cold plane pavement removal followed by 2 inches of Level 3, 12-inch dense asphalt concrete pavement (ACP) placement, with paving width limits extending 2 feet outside fog lines to remove and replace existing rumble strips. The plans indicate construction is scheduled for May 2025 and include multiple sheets detailing proposed improvements, pavement marking plans, and specific details across the project corridor. Additional work includes asphalt concrete pavement repair (ACPR) at various locations identified in the plans, requiring 5 inches of cold plane removal and 5 inches of Level 3, 12-inch dense ACP placed in two lifts (3 inches and 2 inches), with the top lift designated as sacrificial and to be replaced during mainline paving.

Key technical considerations noted in the plans include coordination with existing longitudinal paving joints at road approaches and intersections, expected to be located 6 to 8 feet from OR22's fog line, requiring the contractor to wing out paving as necessary to prevent multiple longitudinal joints. The plans identify a bridge (BR07347) at milepost 23.28 with a 387.50-foot structure length designated as a no-work zone. The contractor must comply with Oregon utility notification requirements under OAR 952-001-0001 through OAR 952-001-0100 and contact the Oregon Utility Notification Center at (503) 232-1987 before beginning work. Field conditions are anticipated to vary from record drawings showing existing shoulder rumble strips, and the Cold Plane Pavement Removal (CPPR) specifications may require field adjustment to ensure complete removal of existing rumble strips. The engineer will field-verify ACPR locations and must coordinate with ODOT Pavement Services for marking out locations prior to construction.

View the file

Other files

File Type Posted
00013940_Att B_Special Provisions..docx DOCX document
00013940_Bid tab.xlsx XLSX spreadsheet
Notice to award~3.pdf PDF
00013940_Att C_Bid Pricing Form.xlsx XLSX spreadsheet
00013940_ITB.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\ONEDRIVE - OREGON DEPARTMENT OF TRANSPORTATION\PROJECT FILES\PAVING\25-27\D3 OR22 MP19.7-25.6 INLAY PAVING (SIMPLE PAVE)\CAD\2_PLANS\OR22 SIMPLE PAVE TITLE.DWG 1-May-2025 11:02 HWYR20G

INDEX OF SHEETS

SHEET NO. DESCRIPTION

Title SheetA01 A02 Proposed ImproYements

STATE OF OREGONDEPARTMENT OF TRANSPORTATION

PLANS FOR PROPOSED PROJECT

INLAY PAVING

OR22 MP19.7-25.6 INLAY PAVING

NORTH SANTIAM HIGHWAY

MARION COUNTY

MAY 2025

FEDERAL HIGHWAY

ADMINISTRATION

OREGON

DIVISION

PROJECT NUMBER SHEET

NO.

A01

OYerall Length Of ProMect - 5.9 Miles

Oregon Law Requires You To Follow Rules Adopted By The Oregon Utility Notification Center.

Those Rules Are Set Forth In OAR 952-001-0001 Through OAR 952-001-0100.

You May Obtain Copies Of The Rules By Calling The Center (Note: The Telephone Number For

The Oregon Utility Notification Center Is

(503) 232-1987).

ATTENTION:

LET'S ALL

WORK TOGETHER

TO MAKE THIS

JOB SAFE

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

SAFETY

FIRST

OREGON TRANSPORTATION COMMISSION

CHAIR

VICE CHAIR

COMMISSIONER

COMMISSIONER

COMMISSIONER

DIRECTOR OF TRANSPORTATION

Robert Van Brocklin Julie Brown Sharon Smith Lee Beyer Vacant Kristopher W. Strickler

OR22 MP19.7-25.6 INLAY PAVING

NORTH SANTIAM HIGHWAY

MARION COUNTY

O R

EG

ON

DE PAR TMEN

T

O F

T RAN S P OR T A T I ON

N/A

A03 A0� 4A01 4B01 4B02 4B03 4B0� 4B0�

Proposed ImproYements Proposed ImproYements PaYement Marking Plan and Details PaYement Marking Plan PaYement Marking Plan PaYement Marking Plan PaYement Marking Plan PaYement Marking Plan

BEGIN PROJECT

MP19.70

END PROJECT

MP25.60

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\ONEDRIVE - OREGON DEPARTMENT OF TRANSPORTATION\PROJECT FILES\PAVING\25-27\D3 OR22 MP19.7-25.6 INLAY PAVING (SIMPLE PAVE)\CAD\2_PLANS\OR22 SIMPLE PAVE PLAN.DWG 8-May-2025 11:41 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

OR22 MP19.7-25.6 INLAY PAVING

NORTH SANTIAM HIGHWAY

MARION COUNTYHWY:

M.P.:

DATE

19.70 - 25.60

MARION

MAY/25 A02

Jeff Shambaugh

Jeff Shambaugh

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T RAN S P OR T AT I ON

OREGON

EXPIRES: 06-30-2026

99533PEREG

ISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

PROPOSED IMPROVEMENTS

RE:

MATCHLINE

BELOW

RE:

MATCHLINE

ABOVE

R E:

M

ATC

H

LIN

E N

EXT

BEGIN PROJECT AT MP19.70 (INTERSECTION OF

OR22 AND STOUT LANE SE) AT THE EXISTING

PAVING JOINT FROM A PREVIOUS PROJECT

MP19.70-25.60

2" COLD PLANE PAVEMENT REMOVAL

2" LEVEL 3, 12" DENSE ACP

WIDTH LIMITS ARE 2' OUTSIDE OF FOG LINES (TO

REMOVE AND REPLACE EXISTING RUMBLE STRIPS)

MP19.70-25.60

2" COLD PLANE PAVEMENT REMOVAL

2" LEVEL 3, 12" DENSE ACP

WIDTH LIMITS ARE 2' OUTSIDE OF FOG LINES (TO

REMOVE AND REPLACE EXISTING RUMBLE STRIPS)

GENERAL NOTES:

RECORD DRAWINGS SHOW EXISTING SHOULDER RUMBLE STRIPS EXTENDING

APPROXIMATELY 14” PAST THE FOG LINE, AND THE PROPOSED PAVING DESCRIBES

EXTENDING THE INLAY 2' OUTSIDE OF FOG LINE. IF FIELD CONDITIONS VARY FROM

THE RECORD DRAWINGS THEN THE CPPR SHOULD BE ADJUSTED TO ENSURE

COMPLETE REMOVAL OF THE EXISTING RUMBLE STRIPS.

IN ORDER TO PREVENT MULTIPLE LONGITUDINAL PAVING JOINTS, THE CPPR SHOULD

BE WIDENED TO MATCH EXISTING LONGITUDINAL PAVING JOINTS AT ALL PAVED

ROAD APPROACHES/INTERSECTIONS. FOR CONTRACTOR AWARENESS, PLANS FROM

PREVIOUS PROJECTS GENERALLY SHOW THAT EXISTING JOINTS ARE 6 – 8’ FROM

OR22'S FOG LINE. IT SHOULD BE ANTICIPATED THAT PAVING AT APPROACHES AND

INTERSECTIONS WOULD WING OUT TO MATCH EXISTING JOINTS.

19.70 - 25.60

MARION

MAY/25 A03

Jeff Shambaugh

Jeff Shambaugh

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T RAN S P OR T AT I ON

OREGON

EXPIRES: 06-30-2026

99533PEREG

ISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\ONEDRIVE - OREGON DEPARTMENT OF TRANSPORTATION\PROJECT FILES\PAVING\25-27\D3 OR22 MP19.7-25.6 INLAY PAVING (SIMPLE PAVE)\CAD\2_PLANS\OR22 SIMPLE PAVE PLAN.DWG 8-May-2025 11:41 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

OR22 MP19.7-25.6 INLAY PAVING

NORTH SANTIAM HIGHWAY

MARION COUNTYHWY:

M.P.:

DATE

PROPOSED IMPROVEMENTS

R E:

M

AT

C H

LI

N

E

BE

LO

W

RE:

M

ATCHLINE

ABO

VE

R E:

M

AT

C H

LI

N

E N

EX

T

R E:

M

ATC

H

LIN

E

PR

EV

MP19.70-25.60

2" COLD PLANE PAVEMENT REMOVAL

2" LEVEL 3, 12" DENSE ACP

WIDTH LIMITS ARE 2' OUTSIDE OF FOG LINES (TO

REMOVE AND REPLACE EXISTING RUMBLE STRIPS)

MP19.70-25.60

2" COLD PLANE PAVEMENT REMOVAL

2" LEVEL 3, 12" DENSE ACP

WIDTH LIMITS ARE 2' OUTSIDE OF FOG LINES (TO

REMOVE AND REPLACE EXISTING RUMBLE STRIPS)

NO WORK ZONE MP23.28

ACROSS BRIDGE BR07347

387.50' STRUCTURE LENGTH

APPROXIMATE EB

ACPR LOCATION, SEE

TABLE SHEET A04

APPROXIMATE EB

ACPR LOCATION, SEE

TABLE SHEET A04

APPROXIMATE EB

ACPR LOCATION, SEE

TABLE SHEET A04

APPROXIMATE WB

ACPR LOCATION, SEE

TABLE SHEET A04

APPROXIMATE WB

ACPR LOCATION, SEE

TABLE SHEET A04

19.70 - 25.60

MARION

MAY/25 A04

Jeff Shambaugh

Jeff Shambaugh

Cody Stone

Cody Stone

O R

EG

ON

DE PAR TMEN

T

O F

T RAN S P OR T AT I ON

OREGON

EXPIRES: 06-30-2026

99533PEREG

ISTERED PROFESSIONALENGINEER

MARCH 08, 2022CODY G. STONE

THIS IS THE FILENAME LOCATION: C:\USERS\HWYR20G\ONEDRIVE - OREGON DEPARTMENT OF TRANSPORTATION\PROJECT FILES\PAVING\25-27\D3 OR22 MP19.7-25.6 INLAY PAVING (SIMPLE PAVE)\CAD\2_PLANS\OR22 SIMPLE PAVE PLAN.DWG 8-May-2025 11:41 HWYR20G

OREGON DEPARTMENT

OF TRANSPORTATION

Checker:Drafter:

Designer:

SHEET NO.

COUNTY Reviewer:

FINAL ELECTRONIC DOCUMENT

AVAILABLE UPON REQUEST

OR22 MP19.7-25.6 INLAY PAVING

NORTH SANTIAM HIGHWAY

MARION COUNTYHWY:

M.P.:

DATE

PROPOSED IMPROVEMENTS

RE

M

AT

CH

LI

NE

PR

EV

MP19.70-25.60

2" COLD PLANE PAVEMENT REMOVAL

2" LEVEL 3, 12" DENSE ACP

WIDTH LIMITS ARE 2' OUTSIDE OF FOG LINES (TO

REMOVE AND REPLACE EXISTING RUMBLE STRIPS)

END PROJECT AT MP25.60

LIMITS TO BE PAINTED BY AGENCY

ASPHALT CONCRETE PAVEMENT REPAIR LOCATIONS

5" COLD PLANE PAVEMENT REMOVAL

5" LEVEL 3, 12" DENSE ACP (1ST LIFT 3", SECOND LIFT 2")

NOTE: ACPR SHOULD BE PERFORMED PRIOR TO MAINLINE PAVING

WITH THE TOP LIFT CONSIDERED SACRIFICIAL (TO BE REPLACED WITH

MAINLINE PAVING). LOCATIONS TO BE FIELD VERIFIED BY THE

ENGINEER. CONTACT PAVEMENT SERVICES FOR ASSISTANCE IN

MARKING OUT LOCATIONS PRIOR TO CONSTRUCTION.

Date: 2025.05.08

11:45:24-07'00'

11:46:09-07'00'

11:46:47-07'00'

11:47:43-07'00'

11:48:34-07'00'

11:49:07-07'00'

Sheets and Views
1 VIEW (22x34)

File details come from the government source that posted it. Updated .