00013573 Att B Bid Pricing Form.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- US 97: MP 22 - MP 25. 5 Inlay Paving
- Solicitation number
- S-73000-00013573
- Issued by
- Multnomah County, Oregon
About this file
I apologize, but I cannot provide a summary of the file because no actual file content was shared in your message. You referenced a file named "00013573 Att B Bid Pricing Form.xlsx", but no Excel spreadsheet or its contents were included in the communication. Without viewing the actual document, I cannot accurately summarize its details. To provide a comprehensive summary, I would need the specific contents of the Excel file to be shared in the message.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOI Structured Juniper April 2025.pdf | ||
| 00013573 Prelim Bid Results.xlsx | XLSX spreadsheet | |
| 00013573 Invitation to Bid.docx | DOCX document | |
| 00013573 Att A Special Provisions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT B - BID PRICING FORM S-73000-000013573 |
| Bidder name: |
| City, State: |
The Bidder proposes to furnish all material, equipment and labor, and perform all work for ODOT, in strict accordance with the ITB and the Plans, Specifications and other provisions incorporated in the ITB, on the basis of the lump sum or unit prices, or both, as follows:
| Item | Description | Est Qty | Unit | Unit Price | Total |
| 1 | Mobilization | 1 | LS | $0.00 | |
| 2 | Temporary Flexible Pavement Markers | 1 | LS | $0.00 | |
| 3 | Construction Survey Work | 1 | LS | $0.00 | |
| 4 | Cold Plane Pavement Removal, 2.5 inch Deep | 53000 | SQYD | $0.00 | |
| 5 | Cold Plane Pavement Removal, 3 inch Deep | 20000 | SQYD | $0.00 | |
| 6 | 6 Inch Asphalt Concrete Pavement Repair | 180 | SQYD | $0.00 | |
| 7 | Emuslified Asphalt for Tack Coat | 25 | TON | $0.00 | |
| 8 | Level 3, 1/2 Inch Lime Treated ACP | 10800 | TON | $0.00 | |
| 9 | PG 64-28 Asphalt in Level 3, 1/2 Inch Lime Treated ACP | 650 | TON | $0.00 | |
| 10 | Core Correlation of Nuclear Guage Readings | 2 | EACH | $0.00 | |
| TOTAL | $0.00 |
File details come from the government source that posted it. Updated .