This is a preliminary bid results document for the Oregon Department of Transportation's (ODOT) Alkali Lake Maintenance Yard Paving Project, which closed on February 13, 2025, at 2:00 PM. The project involves reconditioning an existing roadway and installing commercial asphalt concrete pavement, with an estimated quantity of 277 tons of asphalt. Three contractors submitted bids: Hybrid Construction, LLC (Springfield, OR), Strong Contracting (John Day, OR), and JR Carlon Corp (Albany, OR).
The bid results show Hybrid Construction, LLC as the lowest bidder at $67,429.00, followed by Strong Contracting at $88,000.00, and JR Carlon Corp at $124,200.73. The project is designated as an Emerging Small Business (ESB) opportunity, requiring bidders to be ESB-certified contractors. The bid breakdown includes three line items: mobilization, reconditioning of existing roadway, and commercial asphalt concrete pavement, with each contractor providing varying unit prices for these components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00012676 Exhibit 2 Plans.pdf | ||
| 00012676 RFCQ_Attach. Alkali Yard Paving.pdf | ||
| Notice of Award RFGP 6079.pdf | ||
| 00012676 RFCQ_Alkali Yard Paving.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 2/13/25 | ||||||
| ITB No. | S-73000-00012676 | BIDDER | |||||
| NAME: | Hybrid Construction, LLC | Strong Contracting | JR Carlon Corp | ||||
| Bid Closing: | 02/13/2025 @ 2:00PM | CITY/STATE: | Springfield, OR | John Day, OR | Albany, OR | ||
| Description: | ESB Alkali Lake Maintenance Yard Paving | CCB#: | 186103 | 232032 | 218246 | ||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 8,300.00 | $ 8,300.00 | $ 28,000.00 | $ 28,000.00 | $ 20,000.00 | $ 20,000.00 |
| 2 | Recondition Existing Roadway | 1 | LS | $ 10,100.00 | $ 10,100.00 | $ 15,680.00 | $ 15,680.00 | $ 14,040.00 | $ 14,040.00 |
| 3 | Commercial Asphalt Concrete Pavement | 277 | TON | $ 177.00 | $ 49,029.00 | $ 160.00 | $ 44,320.00 | $ 325.49 | $ 90,160.73 |
| TOTAL | $ 67,429.00 | $ 88,000.00 | $ 124,200.73 |