10155 Potable Water Hauling and related Delivery Services to Prineville Reservoir State Park
Solicitation number
S-63400-00007659
Issued by
Crook County, Oregon

About this file

This Request for Bid (RFB) document is issued by the Oregon Department of Transportation (ODOT) for on-call Region 2 paving services. The project, designated as OR18B MP2.25 Willamina RR Xing Paving Project (RFB Number S-73000-00007660), involves a 6-inch grind and pave operation at the Willamina railroad crossing located at the junction of OR18B and Main Street in Yamhill County. The work encompasses an area measuring 20 feet wide by 100 feet long around and between Hampton railroad tracks. The anticipated work items include mobilization, temporary work zone traffic control, pollution control planning, cold plane pavement removal of 6 inches deep (225 square yards), and Level 3, 1/2-inch dense asphalt concrete pavement mixture (80 tons). The bid was issued on July 27, 2023, with a due date of August 10, 2023, at 2:00 p.m. The required completion date is September 29, 2023. ODOT Project Manager Mike Metz (503-509-0015) and Site Representative Ryan Fox (503-551-0779) are the primary contacts. Night work is permitted between 7:00 p.m. and 5:00 a.m., and traffic may be allowed on the cold-planed surface up to three calendar days after removal.

The RFB requires contractors to submit completed pricing for all applicable pay items, with payment based on actual quantities performed. Prevailing wage rates applicable to Yamhill County, as published by the Oregon Bureau of Labor and Industries dated July 5, 2023, must be observed. Contractors must possess a current CCB (Contractors Board) license and reference their On-Call Region 2 Paving Price Agreement Number. Portable Changeable Message Signs must be placed a minimum of seven days before any lane closures, and the cold-planed surface must be swept and cleaned prior to traffic reopening. No compaction testing is required for this project. Railroad coordination will be handled by ODOT. The work order will not be effective until signed by ODOT's Procurement Authority and a notice to proceed is issued.

View the file

Other files

File Type Posted
S-63400-00007659 BID TABULATION.docx DOCX document
ITB Attachment 3 Sample Contract~1.pdf PDF
ITB Attachment 2 Pricing Proposal Form~2.doc DOC document
ITB S-63400-00007659.pdf PDF
ITB Attachment 1 Contractual Acceptance Form~2.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

REQUEST FOR BID AND RESULTING WORK ORDER
On-Call Region 2 Paving
INSTRUCTIONS: ODOT will fill in all information below except Contractor information, Work Order Number (to be added upon award of Work Order), and pricing. ODOT will indicate in the Anticipated Work Items section which bid items are requested, and their estimated quantities. Contractor must complete the Contractor information section, including a signature, and insert unit and total prices for the applicable items. Contractor must submit the completed Request for Bid/Work Order form to ODOT by email as instructed in the emailed request.

Request for Bid Number: S-73000-00007660 Work Order Number:

Issue Date: 7/27/2023 Bid due date and time: 8/10/2023 2:00 pm

Project Name: OR18B MP2.25 Willamina RR Xing Paving

Project description (include milepoint locations): 6" grind and pave at OR18B Willamina RR Xing. See comments for details.

ODOT Project Manager Name and Phone number: Mike Metz 503-509-0015
ODOT Project Manager Billing Address (may be an email): Michael.Metz@odot.oregon.gov

ODOT Site Representative (if different than ODOT Project Manager): Ryan Fox 503-551-0779

Required Completion Date: Sep. 29, 2023

CONTRACTOR INFORMATION

Contractor (COMPANY) Legal Name:

Address:

Contact Person: Email:

Phone: CCB #:

Contractor's On-Call Region 2 Paving Price Agreement Number: PO-73000-

Contractor’s signature below indicates its firm offer to provide the Services described in this Work Order in accordance with all terms, conditions, and specifications contained in the Price Agreement referenced above, and any additional specifications contained within this Work Order and its attachments. The Work Order is not effective until it is signed by ODOT's Procurement Authority, and ODOT issues a notice to proceed.

Contractor Signature: Date:

ODOT Signature (Procurement Authority):Date:
ANTICIPATED WORK ITEMS (PAY ITEMS)
This Work Order indicates an estimate of services/quantities required. Payment to Contractor will be made based on actual quantities provided/performed:
ItemDescriptionEst. Qty.UnitUnit PriceTotal Price
1Mobilization1LS$ - 0
2Temporary Work Zone Traffic Control, Complete1LS$ - 0
3Pollution Control Plan1LS$ - 0
4Cold Plane Pavement Removal, 6" Deep225SQ YD$ - 0
5Level 3, 1/2" Dense ACP Mixture80TON$ - 0
$ - 0
PROJECT SPECIFIC REQUIREMENTS

x This project requires payment of the following prevailing wage rates, which are available online at http://www.oregon.gov/boli/WHD/PWR/Pages/pwr_state.aspx:

The “PREVAILING WAGE RATES for Public Works Contracts in Oregon” dated July 5, 2023

County where the work will be performed: Yamhill
The following attachments are incorporated into this Request for Bid and any resulting Work Order:

x One or more traffic lanes may be closed when allowed, shown, or directed during the following periods of time:

Night work hours: 7PM to 5AM

Portable Changeable Message Signs (PCMS) shall be placed a minimum of 7 days in advance of any ramp or lane closure to alert the public of the closure. The location of the PCMS and the message on the PCMS shall be submitted to the Project Manager as part of the Contractor’s proposed TCP.

Traffic will be allowed on the cold planed surface up to 3 calendar days after removing the existing surface. Sweep and clean the cold planed surface before opening to traffic.

COMMENTS & SPECIAL INSTRUCTIONS:
6" grind and pave back around and in-between Hampton railroad tracks at junction of OR18B and Main St.
(Willamina) RR coordination by ODOT. This is an area of 20' wide by 100' long. No compaction testing required.