00007656_RFB.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- S-63500-00007655
- Issued by
- Marion County, Oregon
About this file
This is a Request for Bid (RFB) form issued by the Oregon Department of Transportation (ODOT) for an on-call Region 2 paving work order. The project involves shoulder grading and paving on Interstate 5 southbound between mileposts 234.56 and 234.95 in Linn County. The work requires regrading the shoulder and applying a single 3-inch lift of asphalt concrete pavement to create a 13-foot paved shoulder, expanding from the current 11-foot width. The anticipated work items include mobilization (1 lump sum), temporary work zone traffic control (1 lump sum), Level 3, 1/2-inch dense asphalt concrete pavement mixture (70 tons), and aggregate base (100 tons). The bid is due by August 10, 2023, at 11:00 AM, with a required completion date of September 30, 2023. The project limits are marked with pink paint and extend approximately 1,900 feet between two existing guardrail runs. Traffic lane closures are permitted Sunday through Thursday between 9:00 PM and 5:00 AM, with portable changeable message signs required at least three days in advance. Compaction testing is not required for this project.
Contractors must submit completed bid forms with unit and total prices for applicable items, along with company information and a signature indicating a firm offer to perform the work. Payment will be made based on actual quantities provided and performed. The project is subject to Oregon prevailing wage rates effective July 5, 2023, as published by the Oregon Bureau of Labor and Industries. ODOT Project Manager Mike Metz (503-509-0015, michael.metz@odot.oregon.gov) will oversee the work. Successful contractors must hold a valid CCB number and reference their On-Call Region 2 Paving Price Agreement number. The work order becomes effective only upon ODOT's Procurement Authority signature and issuance of a notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB to sell surplus fall Chinook Coho Salmon 2023~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| REQUEST FOR BID AND RESULTING WORK ORDER |
| On-Call Region 2 Paving |
| INSTRUCTIONS: ODOT will fill in all information below except Contractor information, Work Order Number (to be added upon award of Work Order), and pricing. ODOT will indicate in the Anticipated Work Items section which bid items are requested, and their estimated quantities. Contractor must complete the Contractor information section, including a signature, and insert unit and total prices for the applicable items. Contractor must submit the completed Request for Bid/Work Order form to ODOT by email as instructed in the emailed request. |
Request for Bid Number: S-73000-00007656 Work Order Number:
Issue Date: 7/26/2023 Bid due date and time: 8/10/2023 11:00 am
Project Name: I-5 SB Shoulder Grading and Paving MP234.56-MP234-95
Project description (include milepoint locations): Regrade shoulder and pave a single 3" lift to result in a 13' paved shoulder from fogline to EP. Currently the shoulder from fog to EP is 11'. See comments.
| ODOT Project Manager Name and Phone number: Mike Metz 503-509-0015 |
| ODOT Project Manager Billing Address (may be an email): michael.metz@odot.oregon.gov |
ODOT Site Representative (if different than ODOT Project Manager):
Required Completion Date: 9/30/2023
CONTRACTOR INFORMATION
Contractor (COMPANY) Legal Name:
Address:
Contact Person: Email:
Phone: CCB #:
Contractor's On-Call Region 2 Paving Price Agreement Number: PO-73000-
Contractor’s signature below indicates its firm offer to provide the Services described in this Work Order in accordance with all terms, conditions, and specifications contained in the Price Agreement referenced above, and any additional specifications contained within this Work Order and its attachments. The Work Order is not effective until it is signed by ODOT's Procurement Authority, and ODOT issues a notice to proceed.
Contractor Signature: Date:
| ODOT Signature (Procurement Authority): | Date: |
| ANTICIPATED WORK ITEMS (PAY ITEMS) | |
| This Work Order indicates an estimate of services/quantities required. Payment to Contractor will be made based on actual quantities provided/performed: |
| Item | Description | Est. Qty. | Unit | Unit Price | Total Price |
| x | Mobilization | 1 | LS | $ - 0 | |
| x | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ - 0 | |
| x | Level 3, 1/2" Dense ACP Mixture | 70 | TON | $ - 0 | |
| x | Aggregate Base | 100 | TON | $ - 0 | |
| $ - 0 | |||||
| PROJECT SPECIFIC REQUIREMENTS |
x This project requires payment of the following prevailing wage rates, which are available online at http://www.oregon.gov/boli/WHD/PWR/Pages/pwr_state.aspx:
The “PREVAILING WAGE RATES for Public Works Contracts in Oregon” dated July 5, 2023
| County where the work will be performed: Linn |
| The following attachments are incorporated into this Request for Bid and any resulting Work Order: |
x One or more traffic lanes may be closed when allowed, shown, or directed during the following periods of time: Sunday-Thursday 9pm-5am x Portable Changeable Message Signs (PCMS) shall be placed a minimum of 3 days in advance of any ramp or lane closure to alert the public of the closure. The location of the PCMS and the message on the PCMS shall be submitted to the Project Manager as part of the Contractor’s proposed TCP.
Traffic will be allowed on the cold planed surface up to ____ calendar days after removing the existing surface. Sweep and clean the cold planed surface before opening to traffic.
| COMMENTS & SPECIAL INSTRUCTIONS: | |
| The limits are currently marked with pink paint. The work area extends about 1900' between two existing | |
| runs of guardrail. This shoulder widening is required in order to connect these two runs of guardrail. | |
| Compaction testing will not be required. |