SOURCE SELECTION PLAN AND EVALUATION FORM
FOR TECHNICALLY ACCEPTABLE LOW PRICE PROCUREMENT
Requisition #: 327571
Short Description: Park NX20 Complete AFM System
Estimated Value: $234,575.00 Source Selection Plan Type: Lowest Price Technically Acceptable
SOURCE SELECTION TEAM:
Source Selection Authority: Katherine Coh Nano-X Small Equipment Chair: Anne E. Sakdinawat Technical Team Evaluator: Anne E. Sakdinawat Business Team Evaluator: Angela M. Garcia
TECHNICAL EVALUATION:
Technical Factors
Evaluation Criteria Vendor A Acceptable / Unacceptable Vendor B Acceptable / Unacceptable Vendor C Acceptable / Unacceptable Vendor D Acceptable / Unacceptable
| 1. Provide technical description of the process, qualifications and materials used |
| Acceptable: Conforms with specs provided by Park Systems |
Not Acceptable: Does not conform with specs provided by Park Systems
2.
Allows for SLAC visit to conduct special program review
Acceptable: Conforms with visit request Not Acceptable: Does not allow visit request
| 3. Provide a short description of quality control plan/procedure |
| Acceptable: Provide a quality control plan (visual inspection is acceptable) |
Non Acceptable: Did not meet SLAC requirements above
| 4. Provide schedule or duration of the project that includes delivery. Indicate period of performance for 14 months |
| Acceptable: Schedule shows an overview at least project duration |
Non Acceptable: No schedule or duration stated in offer
| 5. Provide a list of past performance on similar projects within the last 5years |
| Acceptable: At least one project of similar scope |
Not Acceptable: Does not conform specs and drawings
BUSINESS EVALUATION:
| Business Factors |
| Evaluation Criteria |
| Vendor A |
Acceptable / Unacceptable Vendor B Acceptable / Unacceptable Vendor C Acceptable / Unacceptable Vendor D Acceptable / Unacceptable
1. Price
SIGNATURES:
(TECHNICAL) SSEB CHAIR:
BUSINESS EVALUATOR:
SOURCE SELECTION AUTHORITY: