SOURCE SELECTION PLAN AND EVALUATION FORM

FOR TECHNICALLY ACCEPTABLE LOW PRICE PROCUREMENT

Requisition #: 327571

Short Description: Park NX20 Complete AFM System

Estimated Value: $234,575.00 Source Selection Plan Type: Lowest Price Technically Acceptable

SOURCE SELECTION TEAM:

Source Selection Authority: Katherine Coh Nano-X Small Equipment Chair: Anne E. Sakdinawat Technical Team Evaluator: Anne E. Sakdinawat Business Team Evaluator: Angela M. Garcia

TECHNICAL EVALUATION:

Technical Factors

Evaluation Criteria Vendor A Acceptable / Unacceptable Vendor B Acceptable / Unacceptable Vendor C Acceptable / Unacceptable Vendor D Acceptable / Unacceptable

1. Provide technical description of the process, qualifications and materials used
Acceptable: Conforms with specs provided by Park Systems

Not Acceptable: Does not conform with specs provided by Park Systems

2.

Allows for SLAC visit to conduct special program review

Acceptable: Conforms with visit request Not Acceptable: Does not allow visit request

3. Provide a short description of quality control plan/procedure
Acceptable: Provide a quality control plan (visual inspection is acceptable)

Non Acceptable: Did not meet SLAC requirements above

4. Provide schedule or duration of the project that includes delivery. Indicate period of performance for 14 months
Acceptable: Schedule shows an overview at least project duration

Non Acceptable: No schedule or duration stated in offer

5. Provide a list of past performance on similar projects within the last 5years
Acceptable: At least one project of similar scope

Not Acceptable: Does not conform specs and drawings

BUSINESS EVALUATION:

Business Factors
Evaluation Criteria
Vendor A

Acceptable / Unacceptable Vendor B Acceptable / Unacceptable Vendor C Acceptable / Unacceptable Vendor D Acceptable / Unacceptable

1. Price

SIGNATURES:

(TECHNICAL) SSEB CHAIR:

BUSINESS EVALUATOR:

SOURCE SELECTION AUTHORITY: