00 70 00 GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.pdf

PDF 72 KB Posted

Attached to
Tinker AFB Mutiple Award Construction Basic Ordering Agreement (MACB) Federal contract opportunity
Solicitation number
FA813722R0057
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Tinker AFB Mutiple Award Construction Basic Ordering Agreement (MACB), newest first.
File Type Posted
00 71 00 GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.pdf PDF
2020 TAFB Mechanical Standard.pdf PDF
2020 TAFB Facility Standard.pdf PDF
Experience Matrix.pdf PDF
Section A_ Executive Summary.pdf PDF
01 45 00.00 10 QUALITY CONTROL.pdf PDF
2020 TAFB Electrical Standards.pdf PDF
MACB (BOA)NOTICE OF INTENT- ANNUAL SYNOPSIS.pdf PDF
00 72 00 GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.pdf PDF
Statement of Work 26 May 2021.pdf PDF
Solicitation - FA813722R0057.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK Ti nker Gener al Speci f i cat i ons 2019

00 70 00

GENERAL REQUI REMENTS FOR CONSTRUCTI ON ON TI NKER AI R FORCE BASE

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y. The most cur r ent edi t i on of t he l i s t ed publ i cat i ons at t he t i me of cont r act / del i ver y or der awar d shal l be used.

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 241 ( 2013; Er r at a 2015) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons

NFPA 51B ( 2014) St andar d f or Fi r e Pr event i on Dur i ng Wel di ng, Cut t i ng, and Ot her Hot Wor k

NFPA 55 ( 2016; TI A 16- 1; TI A 16- 2) Compr essed Gases and Cr yogeni c Fl ui ds Codes

NFPA 70 ( 2017; ERTA 1- 2 2017; TI A 17- 1; TI A 17- 2;

TI A 17- 3; TI A 17- 4; TI A 17- 5; TI A 17- 6;

TI A 17- 7; TI A 17- 8; TI A 17- 9; TI A 17- 10;

TI A 17- 11; TI A 17- 12; TI A 17- 13; TI A

17- 14; TI A 17- 15; TI A 17- 16; TI A 17- 17 )

Nat i onal El ect r i cal Code

NFPA 72 ( 2016; Er r at a 1 2018) Nat i onal Fi r e Al ar m and Si gnal i ng Code

TI NKER AI R FORCE BASE ( TAFB)

TAFBI 13- 201 Fl i ght and Gr ound Oper at i ons

TAFB Pl an 31- 101 I nt egr at ed Def ense Pl an

U. S. AI R FORCE ( USAF)

AFI 10- 245 Ant i t er r or i sm ( AT)

AFI 40- 102 Tobacco Use i n t he Ai r For ce

AFI 91- 203 Ai r For ce Consol i dat ed Occupat i onal Saf et y Instruction

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 3- 260- 01 ( 2019) Ai r f i el d and Hel i por t Pl anni ng and Design

UFC 3- 600- 01 ( 2016; wi t h Change 1) Fi r e Pr ot ect i on Engi neer i ng f or Faci l i t i es

Apr i l 2019 Page 1 Sect i on 00 70 00

UFC 3- 601- 02 ( 2010) Oper at i ons and Mai nt enance:

I nspect i on, Test i ng, and Mai nt enance of Fi r e Pr ot ect i on Syst ems

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

29 CFR 1910- SUBPART Q Wel di ng, Cut t i ng, and Br azi ng

29 CFR 1926 Saf et y and Heal t h Regul at i ons f or Construction

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Ent r y Access Li st ; G

Key I ssue Recei pt

SD- 06 Test Repor t s

Fi r e Al ar m Pr e- Const r uct i on Test i ng Recor d; G

SD- 07 Cer t i f i cat es

Wel di ng, Cut t i ng and Br azi ng Per mi t ; G

Fr amed I nst r uct i ons

SD- 11 Cl oseout Submi t t al s

Key Ret ur n Recei pt

1. 3 WORK REQUI REMENTS

1. 3. 1 Secur i t y/ Cont r act or I dent i f i cat i on Badges

Cont r act or s wor k i ng on Ti nker AFB shal l compl y wi t h al l pr ocedur es out l i ned in AFI 10- 245, TAFB Pl an 31- 101, and TAFBI 13- 201. Ci v i l i an and mi l i t ar y r et i r ees who conduct commer ci al busi ness on base must obt ai n a Cont r act or I dent i f i cat i on Badge t hr ough t hei r pl ace of empl oyment .

Al l cont r act or s/ cont r act or per sonnel shal l be subj ect t o backgr ound checks i n accor dance wi t h TAFB Pl an 31- 101. Cont r act or s shal l be r esponsi bl e t o ver i f y t he r esi dency and/ or c i t i zenshi p st at us of al l empl oyees pr i or t o submi t t i ng r equest s f or Cont r act or I dent i f i cat i on Badges. I dent i f i cat i on wi l l be sur r ender ed t o Secur i t y For ces per sonnel upon demand f or t he pur pose of i dent i f i cat i on, i nvest i gat i on, abuse, mi suse, or f or any ot her r eason necessar y.

Cont r act or s shal l devel op pr ocedur es f or badge cont r ol t hat i ncl ude t he t ur n- i n of i ssued badges by per sonnel who no l onger r equi r e base ent r y. I n accor dance wi t h TAFB Pl an 31- 101, al l cont r act or s/ cont r act or per sonnel wi l l

Apr i l 2019 Page 2 Sect i on 00 70 00 be assessed a char ge of $50. 00 f or each badge l ost , wi l l f ul l y damaged, or not sur r ender ed t o Pass and Regi st r at i on. No char ge wi l l be made on a r epl acement r equi r ed due t o nor mal wear . Per sonnel wi l l r epor t t o Account i ng and Fi nance, Account s Recei vabl e Uni t and a DD For m 1131, Cash Col l ect i on Voucher , wi l l be pr epar ed and pr esent ed t o Pass and Regi st r at i on pr i or t o i ssui ng r epl acement i dent i f i cat i on.

1. 3. 2 Wor k Schedul es

The Cont r act or shal l ar r ange t hei r wor k schedul es t o coi nci de wi t h t he nor mal dut y hour s of t he Ci v i l Engi neer i ng Di r ect or at e, Ti nker Ai r For ce Base ( 0715 - 1600, Monday t hr u Fr i day) . Wor k schedul es ot her t han t he st andar d Ci v i l Engi neer i ng Di r ect or at e ei ght - hour shi f t may onl y be per mi t t ed f or t he most ur gent r easons, or as di r ect ed/ appr oved by t he Cont r act i ng Of f i cer . Shoul d t he Cont r act or desi r e t o wor k ot her t han nor mal dut y hour s ( i ncl udi ng f eder al hol i days, see bel ow) f or hi s own conveni ence, a wr i t t en r equest shal l be submi t t ed f or appr oval by t he Cont r act i ng Of f i cer a mi ni mum 48 hour s i n advance of t he desi r ed per i od.

Changes t o nor mal wor k hour s due t o cont r act r equi r ement s shal l be speci f i ed i n ot her sect i ons of t he cont r act document s.

1. 3. 3 Feder al Hol i days

Feder al hol i days ar e as f ol l ows:

FEDERAL HOLI DAYS

January New Year ' s Day Mar t i n Lut her Ki ng Jr . Day

February Pr esi dent ' s Day

May Memor i al Day

July I ndependance Day

September Labor Day

October Col umbus Day

November Vet er an' s Day Thanksgi vi ng Day

December Chr i st mas Day

Not e: I n addi t i on, f or hol i days t hat f al l on a weekend, gover nment empl oyees wi l l be of f on t he Fr i day bef or e or t he Monday af t er t he hol i day.

1. 3. 4 Commencement of Wor k

The Cont r act or shal l pr ovi de wr i t t en not i ce t o t he Cont r act i ng Of f i cer a mi ni mum of seven ( 7) cal endar days pr i or t o commenci ng wor k on a pr oj ect s i t e, desi gnat i ng t he dat e t he Cont r act or i nt ends t o begi n wor k. The Cont r act or shal l not i f y t he Const r uct i on I nspect or f i ve ( 5) busi ness days pr i or t o commenci ng wor k on a pr oj ect s i t e. Af t er a wor k del ay exceedi ng t went y- f our hour s, t he Const r uct i on I nspect or shal l be not i f i ed one ( 1) busi ness day pr i or t o r esumi ng wor k on a pr oj ect s i t e. Fai l ur e of t he Cont r act or t o compl y wi t h t hese r equi r ement s may r esul t i n r emoval of wor k compl et ed pr i or t o maki ng t he pr oper not i f i cat i ons, i n or der t o per f or m r equi r ed i nspect i ons, at no addi t i onal cost t o t he Gover nment .

Apr i l 2019 Page 3 Sect i on 00 70 00

1. 3. 5 Ti me Ext ensi ons f or Unusual l y Sever e Weat her

Thi s pr ovi s i on speci f i es t he pr ocedur e f or det er mi nat i on of t i me ext ensi ons f or unusual l y sever e weat her . I n or der f or t he Cont r act i ng Of f i cer t o gr ant a t i me ext ensi on under t hi s pr ovi s i on, t he f ol l owi ng condi t i ons must be sat i sf i ed:

The weat her exper i enced at t he pr oj ect s i t e dur i ng t he cont r act per i od must be f ound t o be unusual l y sever e, t hat i s , mor e sever e t han t he adver se weat her ant i c i pat ed f or t he pr oj ect l ocat i on dur i ng t hat mont h.

The unusual l y sever e weat her must act ual l y cause a del ay t o t he compl et i on of t he pr oj ect . The del ay must be beyond t he cont r ol and wi t hout t he f aul t or negl i gence of t he Cont r act or .

The f ol l owi ng schedul e of mont hl y ant i c i pat ed adver se weat her days i s based on Nat i onal Oceani c and At mospher i c Admi ni st r at i on ( NOAA) or s i mi l ar dat a f or t he pr oj ect l ocat i on and wi l l const i t ut e t he base l i ne f or mont hl y weat her t i me eval uat i ons. The Cont r act or ' s pr ogr ess schedul e must r ef l ect t hese ant i c i pat ed adver se weat her del ays i n al l weat her dependent activities.

MONTHLY ANTI CI PATED ADVERSE WEATHER DAYS

( Based on NOAA Summar y Mont hl y Nor mal s f or Okl ahoma Ci t y Wi l l Roger s)

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

3 3 5 5 6 6 4 5 5 5 4 3

Upon acknowl edgement of t he Not i ce t o Pr oceed ( NTP) and cont i nui ng t hr oughout t he cont r act , t he Cont r act or shal l r epor t t he occur r ence of unusual l y adver se weat her and r esul t ant i mpact t o nor mal l y schedul ed wor k.

Act ual adver se weat her del ay days must pr event wor k on cr i t i cal act i v i t i es f or 50 per cent of mor e of t he Cont r act or ' s schedul ed wor k day. The number of act ual adver se weat her del ay days shal l i ncl ude days i mpact ed by act ual adver se weat her ( even i f adver se weat her occur r ed i n pr evi ous mont h) , be cal cul at ed chr onol ogi cal l y f r om t he f i r st t o t he l ast day of each mont h, and be r ecor ded as f ul l days. I f t he number of act ual adver se weat her del ay days exceeds t he number of ant i c i pat ed days i n t he par agr aph above, t he Cont r act i ng Of f i cer may conver t any qual i f y i ng del ays t o cal endar days, gi v i ng f ul l consi der at i on f or equi val ent f ai r weat her days.

For pr oj ect s suscept i bl e t o unusual l y i ncl ement weat her , t he Cont r act or may r equest a " wi nt er r ecess" f r om t he Cont r act i ng Of f i cer . Wi nt er r ecess t i mef r ame exi st s f r om 21 December t hr ough 15 Mar ch. Be advi sed t hat wi nt er r ecess wi l l not be i nt er pr et ed as a Gover nment caused del ay i n whi ch damages may be r equest ed by t he Cont r act or . Once t he wi nt er r ecess has been est abl i shed vi a modi f i cat i on t o t he cont r act , i t wi l l r emai n i n f or ce unt i l l i f t ed by t he Cont r act i ng Of f i cer by t he r equest of t he Cont r act or , or 15 Mar ch. The r emai ni ng per i od of per f or mance wi l l t hen be r eest abl i shed upon t er mi nat i on of t he wi nt er r ecess. Under no condi t i on shal l t he Cont r act or l eave a const r uct i on s i t e f or a wi nt er r ecess unt i l wr i t t en aut hor i zat i on i s r ecei ved f r om t he Cont r act i ng Of f i cer , and t he pr oj ect s i t e has been i nspect ed by t he Const r uct i on I nspect or and det er mi ned t o be suf f i c i ent l y sust ai nabl e t hr ough t he wi nt er r ecess.

Apr i l 2019 Page 4 Sect i on 00 70 00

1. 3. 6 Wor k Si t e Revi ew

Pr i or t o st ar t i ng any wor k, t he Cont r act or shal l i nspect t he wor k ar ea( s) t o det er mi ne t he physi cal condi t i on of t he ar ea. The Cont r act or , as a r esul t of t hi s i nspect i on, shal l pr ompt l y not i f y t he Cont r act i ng Of f i cer , i n wr i t i ng, of any exi st i ng damage( s) or condi t i on( s) t hat coul d i nt er f er e wi t h wor k on t hi s cont r act .

1. 3. 7 Cr ane/ Li f t Usage Rest r i ct i ons

No const r uct i on t hat may af f ect ai r navi gat i on wi l l commence unt i l t he 72nd ABW/ CC has appr oved an Ai r f i el d Const r uct i on Wai ver . Thi s i ncl udes al l pr oposed oper at i ons on Ti nker AFB t hat wi l l i nvol ve equi pment whi ch ext ends above t he r oof l i ne of t he adj acent f aci l i t i es ( e. g. cr anes, t el escopi ng boom f or k l i f t s and manl i f t s , et c. ) .

Ref er ence Sect i on 00 71 00 GENERAL SAFETY REQUI REMENTS FOR CONSTRUCTI ON ON TI NKER AI R FORCE BASE f or addi t i onal i nf or mat i on r egar di ng ai r f i el d const r uct i on wai ver s.

1. 3. 8 Ut i l i t y Out ages

Ut i l i t y out ages f r equent l y af f ect mor e t han one f aci l i t y or or gani zat i on and r equi r e ext ensi ve coor di nat i on. For t hi s r eason, t he Cont r act or shal l submi t al l r equest s f or out ages, i n wr i t i ng, t o t he Cont r act i ng Of f i cer a mi ni mum of 21 days i n advance of t he pr oposed out age. Each out age r equest shal l i ncl ude t he f ol l owi ng as a mi ni mum: Type of out age ( st eam, wat er , el ect r i c , et c. ) , pr oj ect name and number , f aci l i t y / f aci l i t i es af f ect ed ( t o t he best of t he cont r act or s knowl edge) , r equest ed dat e( s) , dur at i on, and a descr i pt i on of t he wor k t o be accompl i shed.

Out ages shal l occur dur i ng non- st andar d hour s ( bet ween 1800 Fr i day and 0600 Monday, and/ or f eder al hol i days) i n or der t o r educe i mpact s t o af f ect ed Gover nment ageni es and t hei r mmi ssi on. Local i zed out ages ( t hose af f ect i ng s i ngl e or gani zat i on and/ or smal l por t i on of a f aci l i t y may be r equest ed t o occur dur i ng nor mal wor ki ng hour s ; t hi s wi l l be coor di nat ed on a case- by- case basi s t hr ough t he Cont r act i ng Of f i cer .

Whi l e ever y at t empt wi l l be made t o meet t he Cont r act or ' s r equest ed dat es and t i mes, act ual ut i l i t y out age dat es and t i mes wi l l be ul t i mat el y be det er mi ned by t he af f ect ed Gover nment agenci es and t hei r r espect i ve mi ssi on r equi r ement s. The Cont r act or shal l not pr oceed wi t h any ut i l i t y out age unt i l not i f i ed by t he Cont r act i ng Of f i cer of t he act ual dat e of t he out age.

When out ages t hat af f ect t he Gover nment ' s abi l i t y t o heat f aci l i t i es ar e schedul ed ( i ncl udi ng nat ur al gas, st eam, and el ect r i c out ages) , t he cont r act or shal l t ake t he necessar y measur es t o pr ot ect t he i nt er i or of t he subj ect f aci l i t y / f aci l i t i es f r om f r eezi ng. I f such measur es ar e i mpr act i cal , t he Gover nment r eser ves t he r i ght t o cancel any out age wher e t emper at ur es ar e expect ed t o r emai n bel ow 40° F f or pr ol onged per i ods.

When out ages t hat may af f ect 72ABW/ SC ( Communi cat i ons Di r ect or at e) f aci l i t i es/ equi pment ar e schedul ed ( i ncl udi ng cool i ng and el ect r i c out ages) , out ages shal l occur dur i ng t he r egul ar l y schedul ed downt i mes, usual l y Sat ur day at 2200 t hr ough Sunday at 0600. I f t hese t i mes ar e i mpr act i cal , al t er nat i ve t i mes may be consi der ed ( t he Communi cat i ons Di r ect or at e wi l l be r esponsi bl e f or ver i f y i ng/ coor di nat i ng al t er nat i ve t i mes) ; however , t he cont r act or shal l be r esponsi bl e t o pr ovi de t he necessar y pr ovi s i ons t o mai nt ai n r el i abl e oper at i on of t he af f ect ed

Apr i l 2019 Page 5 Sect i on 00 70 00 f aci l i t i es/ equi pment dur i ng t hese t i mes.

The Cont r act or shal l consul t wi t h Gover nment shop per sonnel , t hr ough t he Const r uct i on I nspect or , concer ni ng ut i l i t y i sol at i on poi nt s; on a case- by- case basi s, aut hor i t y may be gr ant ed f or t he Cont r act or t o per f or m t he ut i l i t y i sol at i on wi t hout Gover nment shop per sonnel pr esent . I n t hose cases, t he cont r act or shal l be r esponsi bl e f or i sol at i ng and r est or i ng t he ut i l i t y , and r e- set t i ng any equi pment af f ect ed by t he out age, assumi ng t hat t he equi pment i s l ocat ed i n t he ar ea t ur ned over t o hi m/ her as par t of t he const r uct i on cont r act . NOTE: The pr i mar y el ect r i cal ser vi ce, 12. 47kv, i s owned by OG&E. Onl y OG&E wi t h coor di nat i on of t he Gover nment ( Ext er i or El ect r i c) per sonnel can i sol at e any pr i mar y el ect r i c sour ce or r est or e pr i mar y el ect r i c power , unl ess expr ess aut hor i zat i on has been gr ant ed by t he Cont r act i ng Of f i cer .

Pr i or t o commenci ng t he out age, t he Cont r act or shal l per f or m al l t est i ng and i nspect i ons r equi r ed i n t he speci f i cat i ons and/ or on t he pr oj ect dr awi ngs. The Cont r act or shal l coor di nat e bet ween t he Const r uct i on I nspect or and Gover nment shops t o ensur e al l necessar y wor k has been compl et ed sat i sf act or i l y pr i or t o begi nni ng t he out age. The Cont r act or shal l have al l t ool s, equi pment , mat er i al s and per sonnel r equi r ed on s i t e pr i or t o t he st ar t of t he ut i l i t y out age. At t he concl usi on of t he out age, cont r act or per sonnel wi l l be r equi r ed t o r emai n on s i t e unt i l Gover nment shop per sonnel have r est or ed t he ut i l i t y and ensur ed t hat al l af f ect ed equi pment i s oper at i ng pr oper l y.

Fai l ur e of a cont r act or t o be on- si t e f or a coor di nat ed ut i l i t y out age may r esul t i n c l ai ms f or cost s associ at ed wi t h suppor t by Gover nment shop per sonnel . I n addi t i on, because out ages can af f ect t he mi ssi on, and speci f i cal l y pr oduct i on schedul es, f ai l ur e of a cont r act or t o be on- si t e f or a coor di nat ed ut i l i t y out age may r esul t i n c l ai ms f or cost s associ at ed wi t h l ost pr oduct i on t i me.

1. 3. 9 Closures

Cl osur es of paved ar eas ( e. g. r oads, l anes, par ki ng) or f aci l i t i es or por t i ons of f aci l i t i es ( e. g. door ways, ai s l es, r est r ooms) f r equent l y af f ect mor e t han one f aci l i t y or or gani zat i on and r equi r e ext ensi ve coor di nat i on.

For t hi s r eason, t he Cont r act or shal l submi t al l r equest s f or c l osur es, i n wr i t i ng, t o t he Cont r act i ng Of f i cer a mi ni mum of 60 days i n advance of t he pr oposed cl osur e. Cl osur es wi l l be adver t i sed i n t he af f ect ed f aci l i t i es and/ or t he base newspaper f or a mi ni mum of 30 days bef or e const r uct i on starts.

Each cl osur e r equest shal l i ncl ude t he f ol l owi ng as a mi ni mum: Type of c l osur e, pr oj ect name and number , f aci l i t y / f aci l i t i es af f ect ed, r equest ed dat e( s) , dur at i on, and a descr i pt i on of t he wor k t o be accompl i shed. Whi l e ever y at t empt wi l l be made t o meet t he Cont r act or ' s r equest ed dat es, act ual c l osur e st ar t dat es wi l l be ul t i mat el y be det er mi ned by t he af f ect ed Gover nment agenci es and t hei r r espect i ve mi ssi on r equi r ement s. The Cont r act or shal l not pr oceed wi t h any c l osur e unt i l not i f i ed by t he Cont r act i ng Of f i cer of t he appr oved dat e.

1. 3. 10 Tempor ar y Power

The Cont r act or shal l assess power r equi r ement s f or const r uct i on and shal l make a r equest t o t he Cont r act i ng Of f i cer r egar di ng l ocat i on of t r ansf or mer and l ocat i on of t ap i nt o exi st i ng pr i mar y power gr i d. Under no c i r cumst ance shal l t he Cont r act or i nst al l t empor ar y power pr i or t o

Apr i l 2019 Page 6 Sect i on 00 70 00 r ecei v i ng wr i t t en appr oval f r om t he Cont r act i ng Of f i cer . Cont r act or i s sol el y r esponsi bl e at hi s/ her expense f or suppl y i ng and i nst al l i ng r equi r ed t r ansf or mer s and maki ng t he pr i mar y connect i on once hi s/ her el ect r i cal pl an i s appr oved. Onl y OG&E per sonnel can i sol at e any pr i mar y el ect r i c sour ce so t hat t he Cont r act or can make hi s connect i on. The Cont r act or shal l r equest t he el ect r i cal out age as r equi r ed i n par agr aph 1. 3. 7 above. An out age shal l onl y be made i f t he Cont r act or i s r eady t o i nst al l hi s f used cut out s or ot her i sol at i ng/ swi t chi ng medi a and t he dur at i on of t he out age shal l be mi ni mi zed t o t he f ul l est ext ent .

When por t abl e gener at or i s used t o pr ovi de t empor ar y power , t he Gener at or shal l be pl aced a mi ni mum of 150 f t . away f r om any f r esh ai r i nt ake f or f aci l i t y HVAC uni t s.

1. 3. 11 Fi r e Al ar ms

The Cont r act or shal l be r esponsi bl e f or pr e- const r uct i on t est i ng and r e- cer t i f i cat i on of al l Fi r e Al ar m syst ems t hat ar e modi f i ed by addi t i on, del et i on or r el ocat i on of devi ces dur i ng const r uct i on. Al l t est i ng and cer t i f i cat i on shal l be I AW t he r equi r ement s of NFPA 72, NFPA 70, UFC 3- 600- 01, and UFC 3- 601- 02.

Cont r act or s shal l t est al l f i r e al ar m syst ems pr i or t o st ar t i ng const r uct i on. Test i ng shal l be coor di nat ed t hr ough t he Cont r act i ng Of f i cer or t hei r desi gnat ed r epr esent i ve. Al l t est i ng shal l occur dur i ng nor mal wor ki ng hour s, Wednesday t hr ough Fr i day. Dur i ng pr e- const r uct i on t est i ng, cont r act or shoul d not e al l def i c i enci es wi t h t he exi st i ng f i r e al ar m syst em t hat ar e out s i de t he scope of t he cont r act . Pr e- const r uct i on t est i ng wi l l be wi t nessed, as a mi ni mum, by t he Const r uct i on I nspect or . Any def i c i enci es f ound by t he Cont r act or or t he Gover nment af t er const r uct i on has st ar t ed, and wer e not not ed dur i ng t he pr e- const r uct i on t est i ng, wi l l be t he r esponsi bi l i t y of t he cont r act or t o r epai r at no addi t i onal cost t o t he gover nment . A copy of t he pr e- const r uct i on t est i ng r ecor d shal l be f or war ded t o t he Cont r act i ng Of f i cer .

The Cont r act or shal l be r esponsi bl e f or f or war di ng a cer t i f i cat e of compl et i on and t est i ng t o t he Cont r act i ng Of f i cer and CEF upon const r uct i on c l ose- out pr ocedur es.

1. 3. 12 Mechani cal , El ect r i cal , and Comm. Room Cont r ol l ed Access

The Cont r act or shal l be pr ovi ded access t o mechani cal / el ect r i cal r ooms as r equi r ed. I f an i ndi v i dual pr oj ect r equi r es cont i nual access t o mechani cal / el ect r i cal r ooms ( such as r enovat i on of a compl et e f aci l i t y or r epl acement of equi pment i n mechani cal / el ect r i cal r ooms) t he l ocks wi l l be r e- keyed wi t h const r uct i on cor es by t he Gover nment , and t he Cont r act or shal l have excl usi ve cont r ol . The Fi r e Depar t ment and Base Ci v i l Engi neer i ng wi l l mai nt ai n keys t o access const r uct i on cor ed l ocks onl y i n t he case of an emer gency. The Cont r act or shal l accept f ul l l i abi l i t y f or any damages t o f aci l i t y caused by f ai l ur e of equi pment wi t hi n t hei r cont r ol .

Al l comm. r ooms wi l l r emai n keyed wi t h 72 ABW/ SC st andar d key and Communi cat i ons Di r ect or at e wi l l be r esponsi bl e f or escor t i ng cont r act or s i nt o t he r ooms.

1. 3. 12. 1 Const r uct i on Cor e/ Key Pr ocedur es

Const r uct i on cor e/ keys ar e i ssued t hr ough t he Base Ci v i l Engi neer i ng Di r ect or at e ( CE) Key Cont r ol Of f i cer . Cont r act or shal l coor di nat e t he

Apr i l 2019 Page 7 Sect i on 00 70 00 r ecei pt of const r uct i on cor e/ key t hr ough t he CO or t hei r desgi nat ed r epr esent at i ve ( Const r uct i on I nspect or ) .

Upon r ecei pt of t he cor e/ key, Cont r act or wi l l be r equi r ed t o s i gn an AF For m 1297, Tempor ar y I ssue Recei pt . Pr ovi de a copy of t he s i gned key i ssue r ecei pt t o t he CO or t hei r desgi nat ed r epr esent at i ve.

Upon compl et i on of t he wor k, r et ur n t he cor e/ key t o t he CE Key Cont r ol Of f i ce. Pr ovi de a copy of t he s i gned key r et ur n r ecei pt t o t he CO or t hei r desgi nat ed r epr esent i ve.

1. 3. 12. 2 Key Cont r ol

The Cont r act or shal l est abl i sh and i mpl ement pr ocedur es t o ensur e keys i ssued by t he Gover nment ar e not l ost , mi spl aced, or used by unaut hor i zed per sons; pr ocedur es shal l i ncl ude t ur n- i n of keys by per sonnel who no l onger r equi r e access t o l ocked ar eas.

No keys i ssued t o t he Cont r act or by t he Gover nment shal l be dupl i cat ed.

The Cont r act or shal l pr ohi bi t t he use of Gover nment i ssued keys by any per sons ot her t han t he Cont r act or ' s empl oyees. The Cont r act or shal l pr ohi bi t t he openi ng of l ocked ar eas by Cont r act or empl oyees t o per mi t ent r ance of per sons ot her t han Cont r act or empl oyees engaged i n t he per f or mance of assi gned wor k i n t hose ar eas, or per sonnel aut hor i zed ent r ance by t he Cont r act i ng Of f i cer .

1. 3. 12. 3 Lost Keys

The Cont r act or shal l i mmedi at el y r epor t any occur r ences of l ost or dupl i cat e keys/ key car ds t o t he Cont r act i ng Of f i cer .

I n t he event keys, ot her t han mast er keys, ar e l ost or dupl i cat ed, t he Cont r act or shal l , upon di r ect i on of t he Cont r act i ng Of f i cer , r e- key or r epl ace t he af f ect ed l ock or l ocks; however , t he Gover nment , at i t s opt i on, may r epl ace t he af f ect ed l ock or l ocks or per f or m r e- keyi ng. When t he r epl acement of l ocks or r e- keyi ng i s per f or med by t he Gover nment , t he t ot al cost of r e- keyi ng or t he r epl acement of t he l ock or l ocks shal l be deduct ed f r om t he mont hl y payment due t he Cont r act or .

I n t he event a mast er key i s l ost or dupl i cat ed, al l l ocks and keys f or t hat syst em shal l be r epl aced by t he Gover nment and t he t ot al cost deduct ed f r om t he mont hl y payment due t he Cont r act or .

1. 3. 13 Mai nt enance of Wor k Si t e

The wor k ar ea shal l be c l eaned dai l y and kept c l ean and or der l y dur i ng t he per f or mance per i od of t he cont r act . Al l debr i s and scr ap mat er i al , t ool s, and equi pment shal l be c l eaned f r om t he wor k s i t e dai l y as wor k pr ogr esses, and on compl et i on of t he j ob. Haul r out es shal l be kept c l ean of any const r uct i on- r el at ed debr i s. The Cont r act or shal l c l ean of f di r t f r om paved sur f aces, not al l owi ng t he same t o pack on r oads or t o cr eat e a t r af f i c nui sance. The Cont r act or shal l ensur e pr oper l oadi ng of al l vehi c l es used f or t r anspor t of mat er i al s and const r uct i on debr i s; any spi l l age on- r out e on t he base shal l be pr ompt l y r emoved and di sposed of of f base i n accor dance wi t h appl i cabl e St at e and Feder al r egul at i ons. Al l j ob s i t e wast e cont ai ner s used by t he Cont r act or , r egar dl ess of s i ze, shal l be c l ear l y mar ked wi t h appr oved r ef l ect i ve t ape or pai nt . The Cont r act or shal l r et ur n al l movabl e cont ai ner s, as det er mi ned by t he Cont r act i ng

Apr i l 2019 Page 8 Sect i on 00 70 00

Of f i cer , wi t hi n t he j ob s i t e st or age ar ea at t he end of each wor k shi f t .

1. 3. 14 Cont r act or St agi ng Ar eas

Cont r act or st agi ng ar eas shal l be est abl i shed and mai nt ai ned i n accor dance wi t h Sect i on 01 50 00 CONTRACTOR FACI LI TI ES.

1. 3. 15 Shi ppi ng Requi r ement s/ I nst r uct i ons

The Cont r act or shal l f ur ni sh i nf or mat i on t o t he shi ppi ng suppl i er as t o assi gnee, Cont r act Number , Pr oj ect Number , Pr oj ect Ti t l e, and l ocat i on.

The Suppl i er shal l have al l necessar y i nf or mat i on r equi r ed by Base Secur i t y upon ent r y t o Ti nker AFB. Cont r act or shal l ensur e t hat al l del i ver y t r uck t r af f i c di r ect ed t o commer ci al t r uck gat e( s) i s i n accor dance wi t h t he par agr aph TRAFFI C.

Base per sonnel wi l l not accept mat er i al shi pped di r ect l y t o Ti nker AFB. I t i s t he Cont r act or ' s r esponsi bi l i t y t o accept t he shi pped mat er i al , unl oad i t , and st or e i t .

1. 3. 16 Wor ki ng As- Bui l t Dr awi ngs

Cont r act or shal l mai nt ai n wor ki ng as- bui l t dr awi ngs and pr ovi de f or r evi ew by gover nment i n accor dance wi t h Sect i on 01 78 00 CLOSEOUT SUBMI TTALS.

1. 3. 17 Fi nal Recor d Dr awi ngs

Cont r act or shal l pr ovi de f i nal r ecor d dr awi ngs i n accor dance wi t h Sect i on 01 78 00.

1. 3. 18 St andar d Pr oduct s/ Ser vi ce Avai l abi l i t y

Mat er i al s and equi pment shal l be st andar d pr oduct s of a manuf act ur er r egul ar l y engaged i n t he manuf act ur e of such pr oduct s, whi ch ar e of a s i mi l ar mat er i al , desi gn, and wor kmanshi p. The st andar d pr oduct s shal l have been i n sat i sf act or y commer ci al and/ or i ndust r i al use f or t wo year s pr i or t o dat e of sol i c i t at i on and st i l l i s i n pr oduct i on. The t wo- year use shal l i ncl ude appl i cat i ons of equi pment and mat er i al s under s i mi l ar c i r cumst ances and of s i mi l ar s i ze. No obsol et e, or out of pr oduct i on, mat er i al s shal l be i nst al l ed. The t wo year s ' exper i ence shal l be sat i sf act or i l y compl et ed by a pr oduct , whi ch has been sol d or i s of f er ed f or sal e on t he commer ci al mar ket t hr ough adver t i sement s, manuf act ur er s ' cat al ogs, or br ochur es.

1. 4 WELDI NG, CUTTI NG AND BRAZI NG

An AF For m 592, USAF Wel di ng, Cut t i ng and Br azi ng Per mi t ( ' Hot Wor k ' per mi t ) , shal l be obt ai ned f r om t he Base Fi r e Depar t ment 24 hour s pr i or t o any f l ame or spar k pr oduci ng act i v i t i es such as gr i ndi ng, wel di ng, cut t i ng, sol der i ng or br azi ng. The ' Hot Wor k' per mi t shal l be mai nt ai ned on t he j ob s i t e by t he Cont r act or at al l t i mes. Upon r ecei pt , t he Cont r act or shal l submi t a copy of al l per mi t s t o t he Cont r act i ng Of f i cer . Al l hot wor k must be accompl i shed I AW t he r equi r ement s of NFPA 51B, NFPA 241, and AFI 91- 203 par agr aph 27. 2. 4. St or age of al l por t abl e gas cyl i nder s shal l compl y wi t h NFPA 55. I AW 29 CFR 1910- SUBPART Q, adequat e cont r ol s must be used t o ensur e t hat wel di ng oper at i ons do not cr eat e a hazar d f or bui l di ng occupants.

Apr i l 2019 Page 9 Sect i on 00 70 00

1. 5 EXCAVATI ON ON TI NKER AFB

Cont r act or s shal l use ext r eme car e i n al l excavat i ons on Ti nker AFB.

Subsur f ace ut i l i t i es ar e of a congest ed nat ur e. Damagi ng t hese syst ems i n some ar eas coul d r esul t i n t housands of man- hour s of l ost pr oduct i on t i me, whi ch i n- t ur n may r esul t i n c l ai ms agai nst t he Cont r act or f or f ai l ur e t o pr ot ect t hese ut i l i t i es. Ref er t o Sect i on 00 71 00 and UFC 3- 260- 01 f or r equi r ement s r el at ed t o excavat i on adj acent t o r unways, t axi ways, and aprons.

1. 5. 1 Pr ot ect i on of Exi st i ng Ut i l i t i es Dur i ng Excavat i on

1. 5. 1. 1 Gener al Requi r ement s f or Excavat i on

Excavat i on may be accompl i shed by hand or by use of a power equi pment ;

however , t he use of cont i nuous t r encher s or v i br at or y pl ows i s pr ohi bi t ed unl ess per mi ssi on i s obt ai ned, i n wr i t i ng, f r om t he Cont r act i ng Of f i cer pr i or t o br i ngi ng equi pment on base.

Al l pl an i nf or mat i on and l i ne mar ki ngs ar e t o be consi der ed appr oxi mat e. To pr ecl ude acci dent al damge, t he Cont r act or shal l physi cal l y ver i f y under gr ound ut i l i t i es mar ked i n t he f i el d or i dent i f i ed on dr awi ngs, when any adj acent const r uct i on wor k i s expect ed t o come wi t hi n 6 f eet of t he under gr ound syst em. The cont r act or may ut i l i ze met hods such as hand di ggi ng or pot hol i ng by hydr o- excavat i on, and must compl et el y expose t he l i ne t o ensur e pr oper i dent i f i cat i on. Af t er al l l i nes ar e so l ocat ed and compl et el y exposed t o t he sat i sf act i on of t he Cont r act i ng Of f i cer , machi ne excavat i on may begi n. Under no c i r cumst ances shal l machi ne excavat i on be used i mmedi at el y adj acent t o a known unexposed ut i l i t y .

The Cont r act or shal l not e al l ut i l i t i es di scover ed dur i ng excavat i on ( i ncl udi ng t hose t hat ar e mi ssi ng, i ncor r ect , or abandoned) on t he wor ki ng as- bui l t dr awi ngs ( r ef er ence Ti nker Gener al Speci f i cat i on Sect i on 01 78 00 CLOSEOUT SUBMI TTALS f or addi t i on i nf or mat i on r egar di ng wor ki ng as- bui l t dr awi ngs) . I nf or mat i on t o be not ed shal l i ncl ude, but i s not be l i mi t ed to:

- Act ual l ocat i on of al l subsur f ace ut i l i t y l i nes encount er ed ( r ef er enced wi t h of f set di mensi ons f r om f i xed sur f ace f eat ur e)

- Changes i n di r ect i on ( r ef er enced by of f set di mensi ons t o t wo per manent l y f i xed sur f ace f eat ur es)

- Val ves, spl i ce boxes, et c. ( l ocat ed by di mensi oni ng al ong t he ut i l i t y r un f r om a f i xed r ef er ence poi nt

- Ut i l i t y di mensi on ( pi pe s i ze)

- Dept h bel ow t he sur f ace of each l ocat ed ut i l i t y .

I f l i nes i dent i f i ed/ mar ked by t he Gover nment ar e br oken, al l r epai r cost s f or damages shal l be i ncur r ed by t he Cont r act or . I f t he Cont r act or i s deemed r esponsi bl e f or t he damaged l i ne, he shal l i mmedi at el y r epai r t he l i ne t o i t s pr i or condi t i on. I n an emer gency s i t uat i on, or i f t he CO det er mi nes t he Cont r act or i s not r espondi ng wi t hi n a r easonabl e t i me, t he Gover nment r eser ves t he r i ght t o r epai r t he damage and bi l l t he Cont r act or at CE shop r at es.

I f t he br oken l i ne i s not f l agged or i dent i f i ed on t he dr awi ngs, t he r epai r cost wi l l be i ncur r ed by t he Gover nment , unl ess det er mi ned ot her wi se by t he

CO.

Apr i l 2019 Page 10 Sect i on 00 70 00

1. 5. 1. 2 Ext er i or Excavat i on

Bef or e any excavat i on can begi n, t he Cont r act or shal l mar k al l l ocat i ons of pr oposed excavat i on ( t o i ncl ude al l bui l di ng l i nes and pr oposed r out es of ut i l i t i es) . Mar ki ngs shal l be made usi ng mat er i al s t hat ar e r easonabl y per manent / i mmovabl e such as pai nt or dye. The Cont r act or wi l l t hen go t o CE Engi neer i ng Suppor t , Bui l di ng 400, second f l oor ( nor t hwest cor ner ) and r equest a Ti nker Excavat i on Per mi t Request f or m. The Cont r act or i s r esponsi bl e f or t he f ol l owi ng key i t ems:

- Have t he excavat i on s i t e c l ear l y mar ked i n t he f i el d

- Compl et e bl ocks 4- 9 on Ti nker Excavat i on Per mi t Request ( most cur r ent edition)

- At t ach a s i t e l ocat i on map cl ear l y hi ghl i ght ed t o show t he l i mi t s of excavat i on ( maps ar e avai l abl e f r om Engi neer i ng Suppor t ) .

- Obt ai n a cont r ol number f r om CALL- OKI E ( f or al l commer ci al ut i l i t i es l ocat ed on Ti nker )

Excavat i on per mi t pr ocessi ng wi l l not begi n unt i l t he Cont r act or pr ovi des pr oof of an appr oved St or m Wat er Pol l ut i on Pr event i on Pl an ( SWPPP) .

Ref er ence Sect i on 00 72 00 GENERAL ENVI RONMENTAL REQUI REMENTS FOR CONSTRUCTI ON ON TI NKER AI R FORCE BASE f or addi t i onal i nf or mat i on r egar di ng t he SWPPP.

The Cont r act or shal l not begi n excavat i on unt i l r ecei pt of an appr oved Ti nker Excavat i on Per mi t Request i s made. The Ti nker Excavat i on Per mi t Request shal l be mai nt ai ned at t he const r uct i on s i t e and made avai l abl e f or i nspect i on by t he Gover nment . The Cont r act or shal l be r esponsi bl e f or r enewi ng t he Ti nker Excavat i on Per mi t Request ever y 30 days f or as l ong as t her e i s excavat i on i n- pr ogr ess f or a gi ven l ocat i on.

The Gover nment wi l l mar k exi st i ng bur i ed ut i l i t y l i nes as par t of t he Excavat i on Per mi t appr oval pr ocess. I t i s t he Cont r act or ' s r esponsi bi l i t y t o mai nt ai n t he l i ne mar ki ngs once t he Excavat i on Per mi t i s appr oved; i f t he or i gi nal l i ne mar ki ngs ar e no l onger v i s i bl e, t he cont r act or shal l not i f y t he Const r uct i on I nspect or , who i n t ur n wi l l coor di nat e wi t h t he pr oper shop per sonnel t o r e- mar k t he l i nes. Fai l ur e of t he Cont r act or t o mai nt ai n mar ki ngs wi l l be cause f or t he Cont r act i ng Of f i cer t o bi l l t he Cont r act or f or t he Gover nment ' s addi t i onal cost s t o r e- mar k l i nes.

1. 5. 1. 3 I nt er i or Excavat i on

I n gener al , onl y t hose ut i l i t i es whi ch pass t hr ough a f aci l i t y wi l l be mar ked; ut i l i t y l i nes or l at er al s whi ch t er mi nat e wi t hi n t he f aci l i t y wi l l not be mar ked. When cont r act document s r equi r e excavat i on t hr ough a f l oor s l ab, t he cont r act or shal l ut i l i ze desi gn or as- bui l t pl ans t o l ocat e under - f l oor ut i l i t i es; t he CE Engi neer i ng Suppor t of f i ce wi l l pr ovi de r esear ch assi st ance upon r equest .

Al l pl an i nf or mat i on i s t o be consi der ed appr oxi mat e and shal l be f i el d ver i f i ed by t he Cont r act or ( see par agr aph GENERAL REQUI REMENTS FOR EXCAVATI ON f or addi t i onal i nf or mat i on) .

1. 5. 2 Saf et y Dur i ng Excavat i on

The Cont r act or shal l not i f y t he Const r uct i on I nspect or and t he Cont r act i ng Of f i cer pr i or t o commenci ng open t r ench excavat i on wi t h a dept h of f our f eet or mor e. The Const r uct i on I nspect or wi l l i n t ur n not i f y t he Ti nker Gr ound Saf et y Of f i ce. Al l excavat i ons, t r enches, open manhol es, et c. , Apr i l 2019 Page 11 Sect i on 00 70 00 shal l be pr oper l y shor ed, br aced, bar r i caded or guar ded i n accor dance wi t h t he pr ovi s i ons of 29 CFR 1926, Saf et y and Heal t h Regul at i ons f or Const r uct i on. War ni ng l i ght s or ot her i l l umi nat i on mai nt ai ned f r om sunset t o sun up shal l be pl aced at al l excavat i ons whi ch ar e adj acent t o pedest r i an or vehi c l e t hor oughf ar es. Adequat e physi cal pr ot ect i on shal l be pr ovi ded at al l r emot el y l ocat ed excavat i ons.

1. 6 TRAFFIC

Al l Cont r act or per sonnel shal l obser ve base t r af f i c r egul at i ons.

I nf or mat i on r egar di ng such r egul at i ons shal l be obt ai ned f r om t he Cont r act i ng Of f i cer .

OF SPECI AL NOTE, vehi c l e oper at or s on Ti nker Ai r For ce Base shal l not use cel l phones unl ess t he vehi c l e i s saf el y par ked or unl ess t hey ar e usi ng a hands- f r ee devi ce. Usi ng a cel l phone whi l e dr i v i ng wi t hout a hands- f r ee devi ce i s consi der ed a " pr i mar y of f ense, " meani ng t hat v i ol at or s can be st opped sol el y f or t hi s of f ense. The r eper cussi ons i f f ound i n v i ol at i on are:

- Fi r st of f ense: Suspensi on of dr i v i ng pr i v i l eges f or 7 days

- Second of f ense: Revocat i on of dr i v i ng pr i v i l eges f or 30 days

- Thi r d of f ense: Banned f r om dr i v i ng on Base f or 90 days

Al l cont r act or vehi c l es shal l be conspi cuousl y mar ked wi t h t he cont r act or ' s company name by means of per manent mar ki ng, magnet i c s i gn, et c.

Al l t r uck t r af f i c must ent er and exi t Ti nker AFB t hr ough desi gnat ed commer ci al t r uck gat es. The commer ci al t r uck gat es ar e as f ol l ows:

- Tr uck Gat e ( Gat e 33) Locat i on: Sout h Ai r Depot & SE 59t h St r eet Hour s of Oper at i on: 0600- 1600 Monday t hr u Fr i day ( excl udi ng f eder al holidays)

- Pi azza Gat e ( Gat e 31) Locat i on: Sout h Mi dwest Boul evar d & SE 74t h St r eet Hour s Oper at i on: 1600- 0600 Monday t hr u Fr i day; weekends; and f eder al holidays

The t r uck gat e ent r y pr ocedur es ent ai l nor mal ent r y r equi r ement s as wel l as dr i ver I D and ver i f i cat i on of bi l l of l adi ng/ mani f est . Af t er ver i f i cat i on, t r ucks ar e di r ect ed t o t he sear ch ar ea. Once t he t r ucks have been sear ched, t hey wi l l be al l owed t o pr oceed t o t hei r dest i nat i on. Ent r y pr ocedur es wi l l al l ow cer t ai n vehi c l es, cont ai ni ng t i me- sensi t i ve car go ( i . e. , cement t r ucks, bl ood mobi l e, et c) t he abi l i t y t o pr i or i t i ze t hei r pl ace i n queue and f aci l i t at e ent r y ont o t he i nst al l at i on. Pr i or i t i zat i on may be f aci l i t at ed by cal l i ng ahead t o 734- 2008.

Per sonnel assi gned t o Ti nker AFB, t o i ncl ude al l per manent and t empor ar y cont r act or s i n possessi on of a val i d Ti nker AFB i ssued cont r act or ' s badge, may act as a sponsor and pr ovi de escor t t o t r ucks ent er i ng t he i nst al l at i on. When Ent r y Access Li st ( EAL) i s r equi r ed, sponsor s must hand- car r y t he EAL t o t he Secur i t y For ces Oper at i ons Sect i on f or aut hent i cat i on ( f axes, cal l s and emai l s ar e not per mi t t ed) .

The Ai r f i el d Manager wi l l est abl i sh haul r out es on and of f t he ai r f i el d.

Ref er t o Sect i on 00 71 00 f or addi t i onal i nf or mat i on.

Apr i l 2019 Page 12 Sect i on 00 70 00

The Cont r act or shal l mai nt ai n at l east one l ane ( on f our l ane r oads, at l east t wo l anes) of t r af f i c at al l t i mes i n al l s t r eet s, r oads and dr i veways unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer . St r eet c l osur es shal l be l i mi t ed t o seven days maxi mum f or any ut i l i t y cr ossi ng a r oadway ( t hi s t i me i ncl udes t r enchi ng, compact i on, and r epl acement of exi st i ng pavement s) . The Cont r act or shal l pr ovi de st eel mat t i ng equi pment suf f i c i ent t o car r y t r af f i c l oadi ng over excavat ed ar ea.

1. 7 TOBACCO USE ON TI NKER AFB

AFI 40- 102 and i t s suppl ement s pr ohi bi t t he use of smokel ess and smoki ng t obacco i n t he wor k pl ace at Ti nker Ai r For ce Base. Unl ess a " Desi gnat ed Smoki ng Ar ea" s i gn i s post ed, al l ar eas on base ar e consi der ed t o be " no smoki ng" ar eas. AFI 40- 102 f ur t her speci f i es t hat smoki ng i n ar eas such as bat hr ooms, hal l s , of f i ces, pi t ar eas, br eak r ooms, and aboar d Ai r For ce and cont r act ai r cr af t , shal l not be per mi t t ed. The Cont r act or and al l empl oyees, Subcont r act or s and l ower t i er subcont r act or s shal l compl y wi t h t he above AFI r egul at i on. Cont r act or per sonnel shal l not smoke at op bui l di ngs or i n ar eas wher e such act i on i s not aut hor i zed; i n no i nst ance wi t hi n 100 f eet of l i qui d f uel st or age l ocat i ons or par ked ai r cr af t or i n any ot her ar ea t hat woul d const i t ut e a f i r e and/ or expl osi on hazar d. No smoki ng i s al l owed on ai r cr af t par ki ng r amps. Vi ol at i on coul d r esul t i n t he Cont r act or bei ng r emoved f r om Ti nker AFB per manent l y.

1. 8 FRAMED I NSTRUCTI ONS

Fr amed i nst r uct i ons shal l be pr ovi ded as speci f i ed i n ot her sect i ons of t he cont r act speci f i cat i ons or t he cont r act dr awi ngs. The i nst r uct i ons shal l expl ai n equi pment or syst em pr e- st ar t checkout , st ar t - up and shut down pr ocedur es, saf et y pr ecaut i ons, pr event i ve mai nt enance pr ocedur es, and nor mal oper at i onal checks f or sat i sf act or y per f or mance of t he equi pment or syst em. The f r amed dat a pr esent at i on and out l i ne shal l be accept abl e and post ed at l ocat i ons desi gnat ed by t he Cont r act i ng Of f i cer . The dat a shal l be post ed bef or e per sonnel t r ai ni ng or syst em per f or mance t est i ng accept ance f or t he r el at ed i t ems of equi pment or syst em.

1. 9 OPERATI ONS AND MAI NTENANCE DATA

Pr ovi de pr oj ect oper at i on and mai nt enance manual s as speci f i ed i n Sect i on 01 78 00 and Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE MANUALS DATA.

1. 10 TRAINING

Pr ovi de t r ai ni ng f or t he oper at i on of new and modi f i ed syst ems as speci f i ed i n Sect i on 01 78 00 and Sect i on 01 78 23.

1. 11 DD FORM 1354

The cont r act or shal l pr epar e and f ur ni sh a DD For m 1354, Tr ansf er and Accept ance of DoD Real Pr oper t y, and DD For m 1354 Checkl i st as speci f i ed i n Sect i on 01 78 00.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTI ON

Not Used.

Apr i l 2019 Page 13 Sect i on 00 70 00

- - End of Sect i on - -

Apr i l 2019 Page 14 Sect i on 00 70 00

File details come from the government source that posted it. Updated .