PEACH COUNTY WATER INFRASTRUCTURE IMPROVEMENTS
Solicitation number
PE-33552-NONST-2025-000000010
Issued by
Paulding County, Georgia

About this file

The document is an Advertisement for Bids issued by the Fort Valley Utility Commission (FVUC) for the Peach County Water Infrastructure Improvements, Contract B project located in Peach County, Georgia. The Request for Proposal (RFP #32172.0001) seeks sealed proposals for constructing new water supply wells, an elevated water storage tank, water treatment plants, and water mains along Fulwood Road and River Road. The project is divided into three divisions: Division I involves constructing a water treatment plant and interconnection along River Road, Division II includes a new water treatment plant and a 1,500 GPM potable water supply well near GA Hwy 49/Peach Parkway, and Division III involves constructing a 1,500 GPM non-potable water supply well and raw water main. Sealed proposals will be accepted until 10:00 AM on July 30, 2025, with a pre-bid meeting scheduled for July 16, 2025, at the Fort Valley Utility Commission.

The project is federally and state funded through the Water and Sewer Infrastructure, State Fiscal Recovery Funds (SFRF) program under the American Rescue Plan Act of 2021 and is eligible through the Drinking Water State Revolving Fund (DWSRF). Bidders must submit a bid bond or certified cashier's check for 5% of the base bid, and performance and payment bonds will be required at 100% of the contract price. The successful bidder must comply with various federal and state requirements, including the President's Executive Orders prohibiting discrimination, the Civil Rights Act, the Davis-Bacon Act, and procurement of recovered materials. Additionally, a Utility Contractor (UC) License will be required, and bidders are encouraged to purchase American-made equipment and products. Plans and specifications can be obtained from Thomas & Hutton Engineering Co. for a non-refundable fee of $200.00.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 21 00–1

Z:\32172\32172.0001\Documents\Construction\Specifications\Contract -B - Wells and Treatment\1 - Contract\00 21 00- Advertisement for Bids -

Contract B - Wells and Treatment.doc

DOCUMENT 00 21 00

ADVERTISEMENT FOR BIDS

LEGAL NOTICE

PART I – GENERAL

FORT VALLEY UTILITY COMMISSION

500 ANTHOINE STREET

FORT VALLEY, GA 31030

Request for Proposal (RFP)

RFP #32172.0001- Contract B

Peach County Water Infrastructure Improvements

Issue Date: June 27, 2025

1. The Fort Valley Utility Commission (FVUC) is seeking Sealed proposals for the construction of new water supply wells, elevated water storage tank, water treatment plants, and water mains located along Fulwood Road and River Road in Peach County, GA.

2. Sealed Proposals will be accepted at the Fort Valley Utility Commission, in the Meeting

Room, 500 Anthoine Street, Fort Valley, Georgia 31030 until 10:00 AM, July 30, 2025, at which time they will be opened publicly.

For the Bid Submittal Instructions see RFP documents and Contract Documents Section 00

21 13 “Instruction for Bidders”.

3. The scope of the project shall consist of the following generally described work:

Peach County Water Infrastructure Improvements:

Contract B - Complete

Division I: River Road Water Treatment Plant and Interconnection

The scope of work in Division I includes construction of a new water treatment plant along River Road in Peach County, GA. Work shall consist of permitting, clearing, grassing, earthwork, grading, erosion control, gravel access road, landscaping, fencing, painting, chemical treatment equipment, equipment building, electrical components, SCADA, piping, fittings, valves, and all necessary material, labor, and appurtenances associated with a new water treatment plant as shown on the plans and in the specifications. This work also includes the interconnection between the existing 18” raw water main and the existing 8” water main, including all necessary material, labor, and appurtenances.

Division II: Peach Parkway Water Treatment Plant and Well

The scope of work in Division II includes construction of a new water treatment plant, one

(1) new 1,500 gallon per minute (GPM) potable water supply well adjacent to GA Hwy

49/Peach Parkway in Peach County, GA.

00 21 00–2

Z:\32172\32172.0001\Documents\Construction\Specifications\Contract -B - Wells and Treatment\1 - Contract\00 21 00- Advertisement for Bids -

The work in Division II includes permitting, clearing, grassing, earthwork, grading, erosion control, gravel access road, landscaping, fencing, pumps, chemical treatment equipment, one (1) new 1,500 GPM gravel-packed well, wellhead piping, well building, connection to elevated storage tank, painting, piping, fittings, valves, electrical components, SCADA, and all necessary material, labor, and appurtenances associated with a new water treatment plant and water supply well, as shown on the plans and in the specifications.

Division III: Well and Raw Water Main

The scope of work in Division III includes construction of one (1) new 1,500 gallon per minute (GPM) non-potable water supply well and raw water main adjacent to GA Hwy

49/Peach Parkway in Peach County, GA.

The work in Division III includes permitting, clearing, grassing, earthwork, grading, erosion control, gravel access road, landscaping, fencing, pumps, one (1) new 1,500 GPM gravel-packed well, wellhead piping, well building, painting, piping, fittings, valves, electrical components, SCADA, and all necessary material, labor, and appurtenances associated with a water supply well and raw water main, as shown on the plans and in the specifications.

4. Plans and Specifications are to be obtained from Thomas & Hutton Engineering Co., 5553

Peachtree Road, Suite 175, Atlanta, GA 30341, (Issuing Office) upon payment of $200.00

(plus shipping charges as applicable). The payment is non-refundable. Contact Karen

Smulski via phone (912) 721-4051, or email: smulski.k@tandh.com to request plans and specifications. Only Bidders who obtain documents from Thomas & Hutton (the Issuing

Office) shall be placed on the plan holder list and allowed to submit bids.

5. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 5% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating

Guide Property Liability.” Performance and Payment Bonds, each in an amount equal to

100% of the contract price, shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney–in–fact to bind the surety and certified to include the date of the bond.

6. Evaluation of Bids:

The Fort Valley Utility Commission (FVUC) reserves the right to cancel this solicitation and/or reject any and all proposals in whole or in part if FVUC determines that cancellation and/or rejections are advantageous to the Commission. Proposals are legal and binding upon the Respondent when submitted. It will also be the responsibility of each Bidder to obtain any addenda issued for the project. The written documents supersede any verbal or written prior communications between the parties.

The Contract Documents may be examined at the following locations:

Fort Valley Utility Commission

500 Anthoine Street

Fort Valley, GA 31030

Dodge Plan Room / Clayton Digital Reprographics

1000 Eisenhower Drive, Suite 1 mailto:smulski.k@tandh.com

00 21 00–3

Z:\32172\32172.0001\Documents\Construction\Specifications\Contract -B - Wells and Treatment\1 - Contract\00 21 00- Advertisement for Bids -

Savannah, GA 31406 www.construction.com/projectcenter

Reed Construction Data

30 Technology Parkway S., Suite 100

Norcross, GA 30092

7. A Pre–Bid Meeting will be held on Wednesday, July 16, 2025, at 10:00 A.M. at the Fort

Valley Utility Commission, in the Meeting Room, 500 Anthoine Street, Fort Valley, Georgia

31030. Following the Pre–Bid Conference will be a visit to the Project site. The Pre–Bid

Conference is not mandatory for the potential Bidders. All prospective bidders are encouraged to attend. Last day for Questions to submit in writing shall be Thursday, July

23, 2025, at 5:00 P.M.

8. This project is federally and state funded through the Water and Sewer Infrastructure, State Fiscal Recovery Funds (SFRF) program under the American Rescue Plan Act of 2021

(ARPA). The Project is eligible through the Drinking Water State Revolving Fund (DWSRF) and will be required to comply with the Clean Water Act and applicable state and local laws.

9. Procedures for the selection of the Bidder will be in accordance with the RFP package and local procurement requirements as well as the requirements of the Procurement

Standards in the Title 2 C.F.R 200.317 through 200.327, Uniform Administrative

Requirements, Cost Principles, and Audit Requirements for Federal Awards, and applicable subparts and within the grant managements system administered by the

Governor’s Office of Planning and Budget (OPB), Georgia Grants.

10. The Project is eligible through the Drinking Water State Revolving Fund (DWSRF) and will be required to comply with the Clean Water Act and applicable state and local laws.

11. Bidder must comply with the President’s Executive Order Nos. 11246 and 11375, which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. Bidder must also comply with Executive Order No. 13988 that states all person should receive equal treatment under the law regardless of their gender identity or sexual orientation.

12. Bidder must comply with Title VI of the Civil Rights Act of 1964, the Davis–Bacon Act, the

Anti–Kickback Act, and the Contract Work Hours Standard Act.

13. Bidder must comply with procurement of recovered materials pursuant to 2 C.F.R.

§200.323, which requires contractors to comply with section 6002 of the Solid Waste

Disposal Act, as amended by the Resource Conservation and Recovery Act

14. The successful low, responsive, responsible bidder must provide to the Owner written oath in accordance with O.C.G.A §36–91–21(e), certifying that the Contractor has not acted alone or otherwise to prevent or attempt to prevent competition in bidding or proposal for said project by any means whatsoever. Furthermore, the oath shall certify that the

Contractor during this process of procuring said work has not prevented or endeavored to prevent anyone from making a bid or proposal by any means whatsoever, nor caused or induced another to withdraw a bid or proposal for the work.

15. Buy America Clause: Bidders hereby notified that they are encouraged, to the greatest extent practicable, to purchase American made equipment and products with funding provided under this contract.

http://www.construction.com/projectcenter

00 21 00–4

Z:\32172\32172.0001\Documents\Construction\Specifications\Contract -B - Wells and Treatment\1 - Contract\00 21 00- Advertisement for Bids -

16. The American Iron and Steel (AIS) provision apply to the proposed Project. The successful

Bidder shall use iron and steel products that are produced in the United States.

17. The Contractor, or any subcontractor, submitting a bid for utility contracting, as defined in O.C.G.A. Section 43–14–2 to a utility system as defined in said section, shall conform to

O.C.G.A. Section 43–14–8.2 et seq. with reference to Utility Contractor’s Licenses and shall submit the bid with the license numbers, as issued by the Division of Utility

Contractors, affixed on the outside of the bid envelope as provided by O.C.G.A. Section

43–14–8.2(h). Utility contracting means a proposal to perform utility work, the depth which exceeds five (5) feet, to a utility system as defined in O.C.G.A. Section 43–14–

2(17).

A Utility Contractor (UC) License will be required for this project.

FORT VALLEY UTILITY COMMISSION, GEORGIA