00 10 00 Binding Capped Rates.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- W918F21R0013
About this file
This document contains a binding capped rate schedule and details of a federal contract opportunity for airfield paving construction services. The binding capped rate schedule lists maximum burdened labor rates by labor category that will apply over the potential seven-year period of performance if the contractor is awarded the multiple award task order contract (MATOC). The federal contract opportunity is solicitation number W918F21R0013 issued by the U.S. Army Corps of Engineers Omaha District for a $400 million MATOC to provide design-build-bid airfield paving services under NAICS code 237310 for projects within the Northwestern Division boundaries. Offerors must submit proposals by 4 February 2021 to be considered for award of indefinite delivery indefinite quantity task orders that will be fixed-price and cover requirements arising during the one base and six option year ordering period performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am 0002 - W9128F21R0013.pdf | ||
| Am 0003 - W9128F21R0013 .pdf | ||
| 01 45 00.00 10 - Am 0002.pdf | ||
| 01 30 00.24 - Am 0002.pdf | ||
| Am 0001 - W9128F21R0013.pdf | ||
| Attachment 3 Pricing Schedule.xlsx | XLSX spreadsheet | |
| General Wage Decision Number ND20210054.docx | DOCX document | |
| 21R0013 - Div01 Specs.pdf | ||
| 00 10 00 Binding Capped Rates.pdf | ||
| 21R0013 - Sample Project Technical Specs.pdf | ||
| 21R0013 - DWGS MATOC SAMPLE PROJECT.pdf | ||
| W9128F21R0013 - 400M AFP MATOC Final.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Table 1: BINDING CAPPED LABOR RATE SCHEDULE
Unburdened Labor Rate
(Base Period) Burdened Labor Rate
(Base Period 1) Burdened Labor Rate
(Base Period 2) Burdened Labor Rate
(Base Period 3) Burdened Labor Rate
(Base Period – 4) Burdened Labor Rate
(Option Period – 5) Burdened Labor Rate
(Option Period – 6) Burdened Labor Rate
(Option Period – 7) Burdened Labor Rate
(6 -Month Extension)
| Labor Discipline |
| Program Manager/ Construction Operations Manager (Home Office) |
| Corporate Quality Control Manager (Home Office) |
| Corporate Safety and Health Manager (Home Office) |
| Project Manager (Home Office) |
| Engineer (Home Office) |
| Engineer (Field Office) |
| Site Superintendent (Field Office) |
| Quality Control Specialist/CQC System Manager (Field Office) |
| Site Safety and Health Officer (Field Office) |
File details come from the government source that posted it. Updated .