Request for Lease Proposals NO. 36C24526R0005
This is a Request for Lease Proposals (RLP) issued by the Department of Veterans Affairs for office space in Hagerstown, Maryland. The Government seeks to lease approximately 11,987 Net Usable Square Feet (NUSF), yielding up to 13,785 ANSI/BOMA Square Feet and up to 18,610 Rentable Square Feet of contiguous space to house a VA Community-Based Outpatient Clinic (CBOC). The lease term is 15 years (10 years firm, 5 years soft) with termination for convenience rights after the firm term with 90 days' notice. The lease term commencement date is on or about November 1, 2027, contingent on receipt of occupancy permits and Government acceptance. Offers are due by April 21, 2026, at 10:00 AM EST and must be submitted electronically to Rachael.Hallock@VA.GOV.
The space must accommodate Patient Aligned Care Team (PACT) design standards and be located in a modern, quality building with professional surroundings within the specified area of consideration bounded by the Maryland/Pennsylvania state line, Interstate 70, Route 40/64/Railroad Track, and Route 63. The Government requires 130 surface/outside parking spaces and access to public transit (two or more bus/streetcar lines within 1,320 feet). The lease is fully serviced and turnkey, with rent covering all lessor costs including shell upgrades, tenant improvements, operating costs, real estate taxes, and security upgrades. Offerors must submit proposals in four volumes addressing location and building design, technical capability and qualifications, past performance, and pricing. Award criteria emphasize location and building (most important), technical capability, past performance, and price equally. The Government will evaluate proposals using best value tradeoff methodology and may conduct negotiations with offerors in the competitive range.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24526R0005 0004.pdf | ||
| Exhibit K. Tenant Improvements Cost Summary_TICS Table.xlsx | XLSX spreadsheet | |
| 36C24526R0005 0003.pdf | ||
| Exhibits.zip | ZIP file | |
| 36C24526R0005 002.pdf | ||
| 36C24526R0005 0001.pdf | ||
| Exhibits.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RLP NO. 36C24526R0005, Page 1 GSA R100 (2/26, V2)
HAGERSTOWN, MD CBOC
VA REQUEST FOR
LEASE PROPOSALS
NO. 36C24526R0005
Hagerstown, MD
Offers due by 04/21/2026
In order to be considered for award, offers conforming to the requirements of the RLP must be received no later than 10:00 AM EST on on the date above. See “Receipt Of Lease Proposals” herein for additional information.
This Request for Lease Proposals ("RLP") sets forth instructions and requirements for proposals for a Lease described in the RLP documents.
Proposals conforming to the RLP requirements will be evaluated in accordance with the Method of Award set forth herein to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions herein.
The information collection requirements contained in this Solicitation/Contract, that are not required by regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No. 3090-0086.
GLOBAL RLP
GSA R100 (2/26, V2)
RLP NO. 36C24526R0005, Page 2 GSA R100 (2/26, V2)
TABLE OF CONTENTS
GLOBAL RLP
SECTION 1 STATEMENT OF REQUIREMENTS
1.01 GENERAL INFORMATION (FEB 2026)
1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE (FEB 2026)
1.03 AREA OF CONSIDERATION (OCT 2021)
1.04 UNIQUE REQUIREMENTS (OCT 2021)
1.05 NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (FEB 2026)
1.06 LIST OF RLP DOCUMENTS (FEB 2026)
1.07 AMENDMENTS TO THE RLP (JUN 2012)
1.08 LEASE DESCRIPTION (FEB 2026)
1.09 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)
1.10 PRICING OF SECURITY REQUIREMENTS (FEB 2026)
1.11 SECURITY LEVEL DETERMINATION FOR FACILITY HOUSING OTHER FEDERAL TENANTS (APR 2011)
1.12 AUTHORIZED REPRESENTATIVES (FEB 2026)
1.13 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)
SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD
2.01 EFFICIENCY OF LAYOUT (AUG 2011)
2.02 FLOODPLAINS (OCT 2022)
2.03 SEISMIC SAFETY – MODERATE SEISMICITY (MAY 2025) INTENTIONALLY DELETED
2.04 SEISMIC SAFETY – HIGH SEISMICITY (MAY 2025) INTENTIONALLY DELETED
2.05 ASBESTOS (MAY 2025)
2.06 ACCESSIBILITY (SEP 2013)
2.07 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)
2.08 ENERGY INDEPENDENCE AND SECURITY ACT (MAY 2025)
2.09 ENVIRONMENTAL CONSIDERATIONS (SEP 2013)
2.10 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)
2.11 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (OCT 2023)
SECTION 3 HOW TO OFFER
3.01 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS (FEB 2026)
3.02 RECEIPT OF LEASE PROPOSALS (FEB 2026)
3.03 PRICING TERMS (FEB 2026)
3.04 BUDGET SCOREKEEPING; OPERATING LEASE TREATMENT (APR 2011)
3.05 TENANT IMPROVEMENTS INCLUDED IN OFFER (FEB 2026)
3.06 TURNKEY PRICING WITH DESIGN INTENT DRAWINGS PRIOR TO AWARD (FEB 2026) INTENTIONALLY DELETED
3.07 SECURITY IMPROVEMENTS INCLUDED IN OFFER (FEB 2026) INTENTIONALLY DELETED
3.08 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (FEB 2026)
SECTION 4 METHOD OF AWARD
4.01 NEGOTIATIONS (FEB 2026)
4.02 HUBZONE SMALL BUSINESS CONCERN PRICE PREFERENCE WAIVER (FEB 2026)
4.03 AWARD BASIS (FEB 2026)
4.04 PRESENT VALUE PRICE EVALUATION (FEB 2026) INTENTIONALLY DELETED
4.05 AWARD (OCT 2024)
RLP NO. 36C24526R0005, Page 3 GSA R100 (2/26, V2)
SECTION 5 ADDITIONAL TERMS AND CONDITIONS
5.01 MODIFIED RLP PARAGRAPHS (FEB 2026) INTENTIONALLY DELETED
RLP NO. 36C24526R0005, Page 4 GSA R100 (2/26, V2)
REQUEST FOR LEASE
PROPOSALS NO. 36C24526R0005
3/17/2026
GLOBAL RLP GSA R100 (FEB 2026, V2)
SECTION 1 STATEMENT OF REQUIREMENTS
1.01 GENERAL INFORMATION (FEB 2026)
A. This Request for Lease Proposals (RLP) sets forth instructions and requirements for proposals for a Lease described in the RLP documents.
The Government will evaluate proposals conforming to the RLP requirements in accordance with the Method of Award set forth below to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions below.
B. Included in the RLP documents is a lease template setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP and a GSA Proposal to Lease Space (GSA Form 1364) on which Offeror must submit its offered rent and other price data, together with required information and submissions. The Lease paragraph titled “Definitions and General Terms” must apply to the terms of this RLP.
C. Do not attempt to complete the lease template. Upon selection for award, the VA will transcribe the successful Offeror’s final offered rent and other price data included on the GSA Form 1364 into the lease and transmit the completed Lease, including any appropriate attachments, to the successful Offeror for execution. Neither the RLP nor any other part of an Offeror’s proposal must be part of the Lease except to the extent expressly incorporated therein. The Offeror should review the completed Lease for accuracy and consistency with his or her proposal, sign and date the first page, initial each subsequent page of the Lease, and return it to the Lease Contracting Officer (LCO).
D. The Offeror's executed Lease must constitute a firm offer. No Lease must be formed until the LCO executes the Lease and delivers a signed copy to the Offeror.
E. Offeror may not use Federal agency name(s) and/or acronym(s), e.g., General Services Administration (GSA), Department of Veterans Affairs
(VA), in the entity name that owns and/or leases the Space to VA.
1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE (FEB 2026)
A. The Government is seeking up to 11,987 Net Usable Square Feet (NUSF), yielding up to 13,785 ANSI/BOMA Square Feet (ABOA) and up to
18,610 Rentable Square Feet (RSF) of contiguous space within the Area of Consideration set forth below. The lease must not exceed 18,610 RSF. See Section 2 of the Lease for applicable NUSF definitions. The space must fulfill the requirement for Patient Aligned Care Team (PACT) design and VA design guide standards. PACT design guide is found at: http:/www.cfm.va.gov/til/dGuide/dgPACT.pdf. and the VA Construction and Facilities Management standards are found at: HTTP://WWW.CFM.VA.GOV/TIU.
B. The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered must be in a Building that has undergone, or will complete by occupancy, modernization or adaptive reuse for the Space with modern conveniences.
C. The Government requires 0 structured/inside parking spaces and 130 surface/outside parking spaces, reserved for the exclusive use of the
Government. These spaces must be secured and lit in accordance with the Security Requirements set forth in the Lease. Offeror must include the cost of this parking as part of the rental consideration.
D. As part of the rental consideration, the Government may require use of part of the Building roof for the installation of antenna(s). If antenna space is required, specifications regarding the type of antenna(s) and mounting requirements are included in the agency requirements information provided with this RLP.
E. The Government may provide vending machines within the Government's leased area under the provisions of the Randolph-Sheppard Act
(20 USC 107 et. seq.). If the Government chooses to provide vending facilities, the Government will control the number, kind, and locations of vending facilities and will control and receive income from all automatic vending machines. Offeror must provide necessary utilities and make related alterations. The cost of the improvements is part of Tenant Improvement (TI) costs. The Government will not compete with other facilities having exclusive rights in the Building. The Offeror must advise the Government if such rights exist.
F. The lease term must be 15 Years (10 Years Firm, 5 Years Soft) with termination for the convenience of the Government rights, in whole or in parts, effective at any time after the Firm Term of the Lease by providing not less than 90 days’ prior written notice. Should the Government make the determination to modify the term an amendment to the RLP will be issued.
G. The Lease Term Commencement Date will be on or about November 1, 2027, or upon receipt of a current occupancy permit from local permitting agency and acceptance of the space by the Government, whichever is later. Beneficial occupancy is required in accordance with the schedule for completion of space paragraph within the terms and conditions of the lease.
http://www.cfm.va.gov/TIU
RLP NO. 36C24526R0005, Page 5 GSA R100 (2/26, V2)
1.03 AREA OF CONSIDERATION (OCT 2021)
The Government requests Space in an area bounded as follows:
North: Maryland/Pennsylvania State Line South: Interstate 70 East: Route 40, Route 64, Railroad Track West: Route 63
Buildings with Property boundary(ies) on the boundary streets are deemed to be within the delineated Area of Consideration.
1.04 UNIQUE REQUIREMENTS (OCT 2021)
The offered Building and/or Property must have the following features as a minimum requirement:
A. All requirements are stated in the RLP, Lease, and Exhibits added hereto and become part of this RLP.
1.05 NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (FEB 2026)
A. Neighborhood and Parking. Space must be located in a prime commercial office district with attractive, prestigious, and professional surroundings with a prevalence of modern design and/or tasteful rehabilitation in modern use. Streets and public sidewalks must be well maintained. Parking facilities with an adequate availability of parking spaces open to the general public to accommodate employees and visitors must be located within the immediate vicinity of the Building. These parking facilities do not substitute for the required parking under Paragraph 1.02(C). Lessor is responsible for meeting parking code.
B. Neighborhood and Parking. Space must be located 1) in an office, research, technology, or business park that is modern in design with a campus-like atmosphere; or, 2) on an attractively landscaped site containing one or more modern office Buildings that are professional and prestigious in appearance with the surrounding development well maintained and in consonance with a professional image. The VA-dedicated on-site parking will be no less than 130 surface/outside parking spaces and must be increased to meet current local code requirements if necessary. Lessor is responsible for meeting parking code.
C. Walkability and Amenities.
1. Employee and visitor entrances of the Building must be connected to public sidewalks by continuous, accessible sidewalks.
2. A variety of employee services, such as restaurants, retail shops, cleaners, and banks, must be located within the immediate vicinity of the Building. To be considered, amenities must be accessible from the Building by continuous sidewalks, walkways, or pedestrian crosswalks. Amenities must be existing or the Offeror must demonstrate to the Government’s reasonable satisfaction that such amenities will exist by the Government’s required occupancy date. Amenities that are rated as unfavorable include: proximity to gun stores or shooting ranges, pawn shops, adult entertainment venues, liquor stores, medical or recreational marijuana dispensaries, methadone clinics, childcare facilities, community or recreation centers for children, K–12 schools, bars or other establishments that
RLP NO. 36C24526R0005, Page 6 GSA R100 (2/26, V2) serve alcohol, correctional facilities such as prisons or jails, establishments involved in pornography distribution, dog kennels, and adjacency to single‑family housing.
D. Transit Accessibility. Stops for two or more public bus or streetcar lines usable by tenant occupants and their customers must be located within the immediate vicinity of the Building, but generally not exceeding a safely accessible, walkable 1,320 feet from the principal functional entrance of the Building, as determined by the LCO. Stops for commuter bus service do not meet this requirement. Combined, the bus or streetcar stops must provide transit service that is subject to the local bus schedule upon site determination. Qualifying transit routes must have paired route service (service in opposite directions during all posted service times) during business hours. Only trips in one direction are counted towards the threshold. If a qualifying transit route has multiple stops within the required walking distance, only trips from one stop are counted towards the threshold. Transit service must be existing or the Offeror must demonstrate to the Government’s reasonable satisfaction that such transit service will exist by the Government’s required occupancy date.
1.06 LIST OF RLP DOCUMENTS (FEB 2026)
A. The following documents are attached to and included as part of this RLP package:
DOCUMENT NAME
NO. OF
PAGES
EXHIBIT
Lease No. 36C24526L0004 (GSA Form L100) 43 A
Agency Specific Requirements 16 B
Security Requirements for Level I 5 C
GSA 3516, Solicitation Provisions 23 D
GSA 3517B, General Clauses 32 E
GSA Form 1364, Proposal to Lease Space 4 F
GSA Form 1217, Lessor's Annual Cost Statement 3 G
Security Unit Price List N/A (Excel Spreadsheet)
H
RESERVED I
GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B) (See Section 3 for applicable requirements)
6 J
Tenant Improvement Cost Summary (TIC’s Table) Excel K
U.S Department of Labor Wage Determination MD20260126 01.02.2026 5 L
Space Plan Requirement 3 M
CBOC Concept Plan 1 N
3D Conceptual Architectural Renderings 3 N-1
Room Data Sheets 80 O
VA Medical Center Interior Signage Standards August 2024 26 P
VA Medical Center Exterior Signage Standards August 2024 9 Q
Past Performance Questionnaire 5 R
Flag Display- Basis of Design 1 S
Eye Clinic- Basis of Design 6 T
Audiology Booth- Basis of Design 4 U
DIRTT Millwork- Basis of Design 4 V
1.07 AMENDMENTS TO THE RLP (JUN 2012)
This RLP may be amended by notice from the LCO. Amendments may modify the terms of this RLP, or the terms, conditions, and requirements of the Lease contemplated by the RLP.
1.08 LEASE DESCRIPTION (FEB 2026)
A. Offeror must examine the Lease template included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.
B. The Lease contemplated by this RLP includes:
1. The term of the Lease.
2. Terms and Conditions of the Lease, including Definitions, Standards, and Formulas applicable to the Lease and this RLP.
3. Building Shell standards and requirements.
4. Information concerning the tenant agency's buildout requirements, to be supplemented after award.
5. Security Requirements.
6. A description of all services to be provided by the Lessor.
C. Should the Offeror be awarded the Lease, the terms of the Lease must be binding upon the Lessor without regard to any statements contained in this RLP.
RLP NO. 36C24526R0005, Page 7 GSA R100 (2/26, V2)
D. The Lease contemplated by this RLP is a fully serviced, turnkey Lease with rent that covers all Lessor costs, including all shell upgrades, TIs, operating costs, real estate taxes, and security upgrades.. Rent must be based upon a proposed rental rate per Net Useable Square Foot (NUSF), limited by the offered rate and the maximum NUSF solicited under this RLP. The Tenant Improvements to be delivered by the Lessor must be based upon information provided with this RLP, Lease, and Exhibits. The Lessor must design and build the TIs after award of the lease;
design reflects the VA’s full requirements. The Lessor must provide a not-to-exceed cost for design, project management, and buildout of TIs and will be compensated up to the not-to-exceed costs. Although the TI requirements will not be fully developed until after award, offerors must provide the not-to-exceed costs as part of the lease proposal and the not-to-exceed price will be in the lease in the Tenant Improvement Rental Adjustment paragraph. Offerors are encouraged to consider the use of existing fit-out and other improvements to minimize waste. However, any existing improvements must be deemed equivalent to Lease requirements for new installation, and Offerors are cautioned to consider those requirements before assuming efficiencies in its TI costs resulting from use of existing improvements.
After award, the Lessor must prepare Design Intent Drawings (DIDs) for the leased Space conforming to the Lease and Exhibits. The Government will have the opportunity to review the Lessor's DIDs to determine that the Lessor's design meets the requirements of the Lease.
Only after the Government approves the DIDs will the Lessor be released to proceed with buildout. VA review and approval does not release the Lessor from the obligation to meet the requirement as stated in the lease. The Lease also provides that the Government may modify the TI requirements, subject to the Lessor's right to receive compensation for such changes.
E. The security pricing process is described in a separate paragraph.
F. Upon completion and acceptance of the leased Space, the Space will be measured for establishing the actual annual rent, and the lease term must commence. However, the Government will not pay for additional NUSF above the solicitation requirements of 11,987 NUSF. In instances involving an incumbent Lessor where the Government commences the lease term pending completion of TI alterations, the Government must withhold TI pursuant to Section 1 of the Lease until such time as the TI is completed and accepted by the Government.
G. Offerors are advised that doing business with the Government carries special responsibilities with respect to sustainability, fire protection and life safety, and security, as well as other requirements not typically found in private commercial leases. These are set forth both in the lease template, all exhibits, and in the GSA 3517B, General Clauses, and will be made part of the Lease.
1.09 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)
The Lease establishes various requirements relating to the Building shell. Such requirements are not deemed TIs. There are certain Building requirements that are established as minimum requirements in this RLP. If the Lessor's Building does not meet the requirements at the time of award, the Lessor may still be awarded the Lease. However, as a condition of award, the Government will require Lessor to identify those Building improvements that will bring the Building into compliance with RLP requirements. Upon award of the Lease, completion of those Building improvements will become Lease obligations.
1.10 PRICING OF SECURITY REQUIREMENTS (FEB 2026)
A. The proposed Lease contains an attachment with the security requirements and obligations for the Building, which are based on the facility security level (FSL). The Federal Government determines the facility’s FSL rating, which ranges from FSL I to FSL IV. The FSL is based on client agency mix, required size of space, number of employees, use of the space, location, configuration of the site and lot, and public access into and around the facility.
B. The security requirements attached to this Lease includes a general list of countermeasures that may be installed in the leased Space. Offeror must use the Security Unit Price List to provide the Government with itemized costs of these security countermeasures. Security upgrades will be paid in lump sum as part of Tenant Improvements.
C. There must be no charge to the Government for any items that already exist in the offered Building or facility.
1.11 SECURITY LEVEL DETERMINATION FOR FACILITY HOUSING OTHER FEDERAL TENANTS (APR 2011)
If an Offeror is offering Space in a facility currently housing a Federal agency, the security requirements of the facility may be increased and the Offeror may be required to adhere to a higher security standard than other Offerors competing for the same space requirement. If two or more Federal space requirements are being competed at the same time, an Offeror submitting on both or more space requirements may be subject to a higher security standard if the Offeror is determined to be the successful Offeror on more than one space requirement. It is incumbent upon the Offeror to prepare the Offeror’s proposal accordingly.
1.12 AUTHORIZED REPRESENTATIVES (FEB 2026)
With respect to all matters relating to this RLP, only the Government's LCO designated below must have the authority to amend the RLP and award a Lease. The Government must have the right to substitute its LCO by notice, without an express delegation by the prior LCO.
Offerors may contact the Primary Government Contact designated below:
Rachael Hallock, Lease Contract Specialist, NCO5
RACHAEL.HALLOCK@VA.GOV
As to all other matters, Offerors may contact the Alternate Government Contact designated below.
mailto:Rachael.Hallock@va.gov
RLP NO. 36C24526R0005, Page 8 GSA R100 (2/26, V2)
Alternate Government Contact:
Roberta Smiley, Lease Contracting Officer, NCO5
ROBERTA.SMILEY@VA.GOV
1.13 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)
A. The North American Industry Classification System (NAICS) code for this acquisition is 531120 (Exception).
B. The small business size standard for the applicable NAICS code is found HTTPS://WWW.SBA.GOV/SIZE-STANDARDS/.
mailto:Roberta.Smiley@VA.Gov https://www.sba.gov/size-standards/
RLP NO. 36C24526R0005, Page 9 GSA R100 (2/26, V2)
SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD
2.01 EFFICIENCY OF LAYOUT (AUG 2011)
A. In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO.
B. To demonstrate potential for efficient layout, the Offeror will provide a conceptual layout to demonstrate that the offered space has capability to fulfill the VA requirements to include floor layout for Patient Aligned Care Team (PACT) design. Provide conveyance of full understanding of PACT design requirements. PACT design standards are found at https://www.cfm.va.gov/til/dGuide/dgPACT.pdf. Proposals are at the Offeror’s expense. The Government will advise the Offeror if the conceptual design layout demonstrates that the Government's requirement cannot be accommodated within the Space offered. The Offeror will not exceed the maximum square footage in this RLP offer package to include any adjustments that may take place during design after award. If the Offeror is already providing the maximum NUSF and cannot meet the Government's space requirements efficiently, then the Government will advise the Offeror that the offer is unacceptable. Government requires offered space to provide for easy circulation for Veterans in the offered space.
2.02 FLOODPLAINS (OCT 2022)
A Lease will not be awarded for any offered Property located within a 1-percent-annual-chance floodplain (formerly referred to as 100-year floodplain) unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises. If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror must clearly demarcate the offered Property on its site plan/map submissions and must propose an adjustment to property taxes on an appropriate pro rata basis. For such an offer, the Government may determine that the offered Property does not adequately avoid development in a 1-percent-annual-chance floodplain.
In addition, a Lease will not be awarded for any offered Property adjacent to a 1-percent-annual-chance floodplain, where such an adjacency would, as determined by the Government, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.
2.03 SEISMIC SAFETY – MODERATE SEISMICITY (MAY 2025) INTENTIONALLY DELETED
2.04 SEISMIC SAFETY – HIGH SEISMICITY (MAY 2025) INTENTIONALLY DELETED
2.05 ASBESTOS (MAY 2025)
A. The Government requires space with no asbestos-containing materials (ACM), or with undamaged, nonfriable ACM. For purposes of this paragraph, “space” includes the 1) space offered for lease; 2) common building area; 3) ventilation systems and zones serving the space offered;
and 4) the area above suspended ceilings and engineering space in the same ventilation zone as the space offered. Notwithstanding the preceding, if no offers are received for such space, the Government may consider space with thermal system insulation ACM (e.g., wrapped pipe or boiler lagging), which is not damaged or subject to damage by routine operations.
B. ACM is defined as any material with a trace or more of asbestos quantity present.
C. Space with ACM of any type or condition may be upgraded by the Offeror to meet conditions described in sub-paragraph A by abatement
(removal, enclosure, encapsulation, or repair) of ACM not meeting those conditions. If any offer involving abatement of ACM is accepted by the Government, the successful Offeror will be required to successfully complete the abatement in accordance with OSHA, EPA, Department of Transportation (DOT), state, and local regulations and guidance prior to occupancy.
D. Management Plan and Reinspection Report Submittals. If space is offered which contains ACM, the Offeror must submit a current asbestos-related management plan or operations and maintenance plan, along with a current asbestos re-inspection report (performed within the past 5 years) that includes a list of all ACM and their condition for acceptance by the Government prior to lease award. The management plan or operations and maintenance plan, and re-inspection report must conform to generally accepted industry practice in accordance with OSHA (29 CFR § 1910.1001, 29 CFR § 1926.1101), EPA (40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants and Part 763).
E. The Government reserves the right to review Offeror’s existing records for compliance.
2.06 ACCESSIBILITY (SEP 2013)
The Lease contemplated by this RLP contains requirements for Accessibility. In order to be eligible for award, Offeror must either:
A. Verify in the Lease proposal that the Building, offered Space, and areas serving the offered Space meet the Lease accessibility requirements, or
B. Include as a specific obligation in its Lease proposal that improvements to bring the Building, offered Space, and areas serving the offered
Space into compliance with Lease accessibility requirements will be completed prior to acceptance of the Space.
RLP NO. 36C24526R0005, Page 10 GSA R100 (2/26, V2)
2.07 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)
The Lease contemplated by this RLP contains Building requirements for Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System. In order to be eligible for award, Offeror must either:
A. Verify in the Lease proposal that the Building in which Space is offered meets the Means of Egress, Automatic Fire Sprinkler System, and Fire
Alarm System requirements of the Lease; or
B. Include as a specific obligation in its Lease proposal that improvements to bring the Building into compliance with Lease requirements will be completed prior to acceptance of the Space.
2.08 ENERGY INDEPENDENCE AND SECURITY ACT (MAY 2025)
A. The Energy Independence and Security Act (EISA) establishes requirements for Government leases relating to energy efficiency standards and potential cost-effective energy efficiency and conservation improvements.
B. Subject to the exceptions below, unless one of the statutory exceptions listed in sub-paragraph C below applies, the Government may award a lease for a Building only if the Building has earned the ENERGY STAR® label conferred by the U.S. Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions. The term “most recent year” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions. For example, an ENERGY STAR® label awarded by EPA on October 1, 2023, is valid for all lease procurements where final proposal revisions are due on or before September 30, 2024. Notwithstanding the above, buildings that meet any of the following are considered as equivalent to having an Energy Star label in the most recent year, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government:
1. All new Buildings being specifically constructed for the Government, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government, and received the “Designed to Earn the Energy Star®” certification prior to construction;
2. All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy;
3. Newly built Buildings that have used Energy® Star’s Target Finder tool and either achieved a “Designed to Earn the Energy Star®” certification or received an unofficial score (in strict adherence to Target Finder’s usage instructions, including the use of required energy modeling) of 75 or higher prior to the due date for final proposal revisions and who are unable to obtain a label in the most recent year because of insufficient occupancy; or
4. An existing Building that is unable to obtain a label because of insufficient occupancy but that can produce an indication, through the use of energy modeling or past utility and occupancy data input into Energy Star’s® Portfolio Manager tool or Target Finder, that it can receive an unofficial score of 75 or higher using all other requirements of Target Finder or Portfolio Manager, except for actual data from the most recent year.
C. Subject to subparagraph D below, EISA allows a Federal agency to lease Space in a Building that does not have an ENERGY STAR® Label if:
1. No Space is offered in a Building with an ENERGY STAR® Label that meets RLP requirements, including locational needs;
2. The agency will remain in a Building it currently occupies;
3. The Lease will be in a Building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of
Historic Places; or
4. The Lease is for 10,000 RSF or less.
D. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, Offerors are required to include in their lease proposal an agreement to renovate the Building for all energy efficiency and conservation improvements that it has determined would be cost effective over the Firm Term of the Lease, if any, prior to acceptance of the Space (or not later than one year after the Lease Award Date of a succeeding or superseding lease). Such improvements may consist of, but are not limited to, the following:
1. Heating, Ventilating, and Air Conditioning (HVAC) upgrades, including boilers, chillers, and Building Automation System (BAS)
/Monitoring/Control System (EMCS).
2. Lighting Improvements.
3. Building Envelope Modifications.
RLP NO. 36C24526R0005, Page 11 GSA R100 (2/26, V2)
E. The term "cost effective" means an improvement that will result in substantial operational cost savings to the landlord by reducing electricity or fossil fuel consumption, water, or other utility costs. The term "operational cost savings" means a reduction in operational costs to the landlord through the application of Building improvements that achieve cost savings over the Firm Term of the Lease sufficient to pay the incremental additional costs of making the Building improvements.
F. Instructions for obtaining an ENERGY STAR® Label are provided at HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-OWNERS-
AND-MANAGERS/EXISTING-BUILDINGS/EARN-RECOGNITION/ (use “Portfolio Manager” to apply). The ENERGY STAR® Building Upgrade Manual (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-OWNERS-AND-MANAGERS/EXISTING-BUILDINGS/SAVE-ENERGY/) and Building Upgrade Value Calculator (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES/BUILDING-UPGRADE- VALUE-CALCULATOR) are tools which can be useful in considering energy efficiency and conservation improvements to Buildings.
G. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, the successful Offeror will be excused from performing any agreed-to energy efficiency and conservation renovations, and benchmarking with public disclosure (as provided in (I) below, if it obtains the ENERGY STAR® Label prior to the Government’s acceptance of the Space (or not later than one year after the Lease Award Date for succeeding and superseding leases).
H. If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.
I. As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. See the Lease for additional details.
J. All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.
2.09 ENVIRONMENTAL CONSIDERATIONS (SEP 2013)
A. The Government requests space with no known hazardous conditions or recognized environmental conditions that would pose a health and safety risk or environmental liability to the Government.
B. Upon request by the Government, Offeror must provide all known previous use of the Building.
C. Offeror must indicate in its written offer any known hazardous conditions or environmental releases with/from the offered Space, Building or
Property.
2.10 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)
A. Environmental Due Diligence.
1. At the direction of the LCO, the Offeror must provide, at the Offeror’s sole cost and expense, a current Phase I Environmental Site Assessment (ESA), using the American Society for Testing and Materials (ASTM) Standard E1527-21 and timeline, as such standard may be revised from time to time. In accordance with ASTM standards, the study must be performed by an environmental professional with qualifications that meet ASTM standards. This Phase I ESA must be prepared with a focus on the Government being the “user” of the Phase I, as the term “user” is defined in E1527-21. Failure to submit the required study may result in dismissal from consideration.
2. If the Phase I ESA identifies any recognized environmental conditions (RECs), the Offeror will be responsible for addressing such RECs, at its sole cost and expense, including performing any necessary Phase II ESA (using ASTM Standard E1903-11), performing any necessary cleanup actions in accordance with federal and state standards and requirements and submitting a proposed schedule for complying with these obligations. The Government will evaluate whether the nature of any of the RECs, the results of the Phase II, any completed cleanup, and the proposed schedule meet the Government’s needs.
B. National Environmental Policy Act.
1. While the Offeror is responsible for performing all environmental due diligence studies of the offered Property, the Government is responsible for compliance with NEPA, whether in whole or in part, on its own or with the assistance of the Offerors. NEPA requires federal agencies to consider the effects of their actions on the quality of the human environment as part of the federal decision-making process and, to that end, the Government’s obligations may, and in some cases will, be augmented by the Offerors as described in greater detail in the RLP.
2. The Government may either request information from the Offerors to help it meet its obligations under NEPA or share information provided in response to this provision with federal, state and local regulatory agencies as part of its compliance responsibilities under NEPA and other applicable federal, state and local environmental laws and regulations. Further consultation with these regulatory agencies may be necessary as part of the NEPA process.
3. The Offerors are advised that the Government may be required to release the location of each offered site and other building specific information in public hearings or in public NEPA documents. By submitting an offer in response to this RLP and without the need for any further documentation, the Offeror acknowledges and consents to such release.
http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/save-energy/comprehensive-approach/energy-star http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator
RLP NO. 36C24526R0005, Page 12 GSA R100 (2/26, V2)
4. The Government reserves the right to reject any offer where (i) the NEPA-related documentation provided by the Offeror for the offered Property is inadequate, (ii) the offer entails unacceptably adverse impacts on the human environment, (iii) the identified adverse impacts cannot be readily mitigated, or (iv) the level of NEPA analysis is more extensive than is acceptable to the Government.
5. An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of NEPA compliance. This requires research and field surveys to assess the potential impacts to the natural, social and cultural environments. Any recent studies previously conducted by the Offeror may be submitted to be included in the NEPA process.
6. The Government will not proceed with Lease award until the NEPA process is complete as evidenced by the Government’s issuance of a completed CATEX, EA or Environmental Impact Statement (EIS). Upon Lease award, any mitigation measures, whether optional or mandatory, identified and adopted by the Government will become Lease obligations. All costs and expenses for development of design alternatives, mitigation measures and review submittals for work to be performed under the Lease will be the sole responsibility of Lessor.
2.11 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (OCT 2023)
A. The Government is responsible for complying with section 106 of the National Historic Preservation Act of 1966, as amended, 54 U.S.C. §
306108 (Section 106). Section 106 requires federal agencies to consider the effects of their actions on historic properties prior to expending any federal funds on the undertaking. The Government is responsible for identifying whether any historic properties exist in, on, under, or near the offered Property that could be affected by the leasing action. Historic properties include both above-grade (i.e., buildings and historic districts) and below-grade (i.e., archeological sites) resources. The Government is responsible for assessing effects to identified historic properties and for consulting with the State Historic Preservation Officer (SHPO), the Tribal Historic Preservation Officer (THPO), if applicable, any local Historic Preservation or Landmarks Commission, and other interested parties, if applicable, in accordance with the implementing regulations set forth at 36 C.F.R. part 800 (Protection of Historic Properties).
B. An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of the Section 106 compliance. This requires research and field surveys to assess the potential presence of historic properties that may be affected by construction activity, both above- and below-grade. Compliance also may require below-grade testing to determine the presence of archeological resources and possible artifact recovery, recordation and interpretation mitigation measures.
C. Demolition or destruction of a historic property by an Offeror in anticipation of an award of a Government lease may disqualify the Offeror from further consideration.
D. The Government reserves the right to reject any offer where documentation for the offered Property is inadequate or otherwise indicates preservation concerns or adverse effects to historic properties that cannot be minimized or reasonably mitigated, or where the level of NHPA analysis is more extensive than is acceptable to the Government.
E. If the Government determines that the leasing action could affect historic property, the Offeror of any Property that the Government determines could affect historic property will be required to retain, at its sole cost and expense, the services of a preservation architect who meets or exceeds the Secretary of the Interior’s Professional Qualifications Standards for Historic Architecture, as amended and annotated and previously published in the Code of Federal Regulations, 36 C.F.R. part 61, and the GSA’s Qualification Requirements for Preservation Architects and Other Specialists. These standards are available at: HTTPS://WWW.GSA.GOV/REAL-ESTATE/HISTORIC-PRESERVATION/HISTORIC- PRESERVATION-POLICY-TOOLS/. The preservation architect will be responsible for developing preservation design solutions and project documentation required for review by the Government, the SHPO, the THPO, if applicable, and other consulting parties in accordance with Section 106. For Tenant Improvements and other tenant-driven alterations within an existing historic building, the preservation architect must develop context-sensitive design options consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties. Where new construction or exterior alterations, or both, are located within a historic district, may be visible from historic properties or may affect archeological resources, compliance may require tailoring the design of the improvements to be compatible with the surrounding area. Design review may require multiple revised submissions, depending on the complexity of the project and potential for adverse effects to historic properties, to respond to comments from the Government and the other consulting parties. Within GSA, the Regional Historic Preservation Officer is solely responsible for corresponding with the SHPO, the THPO, if applicable, and any other consulting party. All design costs and expenses relating to satisfying the requirements of this paragraph will be borne solely by the Offeror.
https://www.gsa.gov/real-estate/historic-preservation/historic-preservation-policy-tools/preservation-tools-resources/proof-of-competency-other-documentation https://www.gsa.gov/real-estate/historic-preservation/historic-preservation-policy-tools/preservation-tools-resources/proof-of-competency-other-documentation
RLP NO. 36C24526R0005, Page 13 GSA R100 (2/26, V2)
SECTION 3 HOW TO OFFER
3.01 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS (FEB 2026)
A. Offeror must prepare a complete offer, using the forms provided with this RLP, and submit the completed lease proposal package to the
Government as indicated below. The Government will evaluate the offers received as outlined below and further described in this section.
B. Offer will be submitted in four (4) Volumes. Offeror must label each submitted document within each volume using the required naming convention shown in Column 1 of the corresponding volume. All documents must be submitted as individual attachments and not combined into a single file, such as a PowerPoint presentation, PDF, or Word document. Offers submitted in other formats may be considered unresponsive at the discretion of the LCO.
VOLUME 1: LOCATION AND BUILDING
(consists of two (2) Subfactors)
Volume 1: Subfactor 1- Location & Site Plan
Volume 1- Subfactor 1
Naming Convention
Document Description VA Document Specifications
(See RLP Reference for Full Requirements) RLP Reference
V1-S1.A FEMA Flood Plains Map FEMA Maps 2.02
V1-S1.B Local Zoning Compliance Evidence 3.01 E
V1-S1.C Legal Description of Property & Property Tax ID Number
3.01 L
V1-S1.D Parking Plan & Narrative 3.01 M
V1-S1.E Vending Facilities Statement 3.01 P
V1-S1.F Amenities Evidence Map of surrounding amenities. May use Google Maps or other similar tool or combination of tools
3.01 Q
V1-S1.G Hydrology Statement Narrative statement. If >5,000 SF land disturbance compliance, certify compliance,. If not applicable, explain why in your narrative.
3.01 S
V1-S1.H Site Plan (building footprint space footprint) 4.05
V1-S1.I List of Other Tenants (if multitenant) If not multitenant, please provide statement indicating this.
4.05
V1-S1.G Site Physical Security & Threat Mitigation Plan Provide detailed narratives and clear, detailed drawings/renderings illustrating the proposed site physical security considerations and threat mitigation plan.
4.05
Volume 1: Subfactor 2- Building Design Concept
Volume 1- Subfactor 2
Naming Convention
Document Description VA Document Specifications
(See RLP Reference for Full Requirements) RLP Reference
V1-S2.A Asbestos Certification or Management Plan 2.05
V1-S2.B Environmental Due Diligence/NEPA Please provide a narrative statement. If not applicable, explain why in your narrative.
2.10
V1-S2.C Natural Historic Preservation Act Narrative statement and existing documentation.
If not applicable, explain why in your narrative.
2.11
V1-S2.D Prior Use of Building/Land 3.01 F, 2.11
V1-S2.E GSA Form 12000, Fire Protection and Life Safety Use form provided in RLP 3.01 K
V1-S2.F Footprint of offered space within the building 3.01 O
V1-S2.G Conceptual Test Fit Layout Must show columns and other aspects of building impacting design.
3.01 O
V1-S2.H Energy Star/ Efficiency Documentation 3.01 R
V1-S2.I Representation Regarding Certain Telecommunications and Related Services or Equipment
Information should be completed in SAM registration and provided as print-out from SAM
3.01 T
V1-S2.J Socio Economic Status Narrative disclosure of socio-economic status (i.e.
Hub-zone, SDVOSB, VOSB, SB, or other socio-
4.02
RLP NO. 36C24526R0005, Page 14 GSA R100 (2/26, V2) economic status). If not applicable, explain why in your narrative.
V1-S2.K FPLS Submittal for New Construction 3.01 V
V1-S2.L LEED -NC Silver or Green Globes for New Construction (GG -NC) Certification Documentation
3.01 W
V1-S2.M Construction Schedule for New Construction 3.01 X
VOLUME 2- TECHNICAL CAPABILITY AND QUALIFICATIONS
(consists of three (3) Subfactors)
Volume 2: Subfactor 1- Lessor and Lessor’s Subcontractors
Volume 2- Subfactor 1
Naming Convention
Document Description VA Document Specifications
(See RLP Reference for Full Requirements) RLP Reference
V2-S1.A Authorization to Represent Ownership Narrative disclosure. If not applicable, explain why in your narrative.
3.01 C
V2-S1.B Conditional Commitment of Funds 3.01 D
V2-S1.C Ownership Evidence 3.01 F
V2-S1.D Agreement to Acquire Interest Submit agreement. If not applicable, explain why in a narrative statement.
3.01 G
V2-S1.E Signing Authority Proof 3.01 H
V2-S1.F Conflict of Interest Disclosure Narrative disclosure. If not applicable, explain why in your narrative.
3.01 I
V2-S1.G System for Award Management (SAM) – active registration
3.01 J
V2-S1.H Vitae of Offeror’s Team: include up to 12 of Offeror’s key team members for Lease project and include at a minimum: Offeror; Offeror’s general contractor;
architect; project manager during build-out phase;
building manager during administrative phase; other significant members of the Offeror’s team..
NTE 3 pages, (single sided; >8pt font) per individual; NTE 12 key individuals.
4.05
V2-S1.I Small Business Subcontracting Plan Submit plan. If not applicable, explain why in a narrative.
4.05
Volume 2: Subfactor 2- Project Management for Design & Build-Out Phase
Volume 2- Subfactor 2
Naming Convention
Document Description VA Document Specifications
(See RLP Reference for Full Requirements) RLP Reference
V2-S2.A Narrative/documentation – understanding and maintaining schedule; plan to coordinate with VA for activation
NTE 3 pages, (single sided; >8pt font) 3.01 U
V2-S2.B Critical Path of Build Out Phase 4.05
V2-S2.C Pre-lease building security plan Lease Section 3.5
V2-S2.D Project Management & Response Plan for Build Out Phase
Must include (not limited to) contact information, response times, physical location of respondent.
4.05
Volume 2: Subfactor 3- Project Management for Lease Administration and Operational Phase
Volume 2- Subfactor 3
Naming Convention
Document Description VA Document Specifications
(See RLP Reference for Full Requirements) RLP Reference
V2-S3.A Program Management & Response Plan NTE 70 pages, (single sided; >8pt font); Must include (not limited to) contact information, response times, physical location of respondent.
4.05
V2-S3.B Contract Submittal Schedule 3.01 U
RLP NO. 36C24526R0005, Page 15 GSA R100 (2/26, V2)
Volume 3- Past Performance
Volume 3 Naming
Convention Document Description
VA Document Specifications (See RLP Reference for Full Requirements)
RLP Reference
V3.A Submit up to 3 past performance references (FAR 15.305(2)) (RLP Attachment 1)
Must be completed by reference; use RLP attachment.
1.06
V3.B Submit a list of all VA lease projects completed in the past 5 years
May use table or paragraphs; table columns or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .