Walla Walla Design Build MATOC 2023 - 2028
Active Master IDIQ Awarded
- Federal agency
-
US Army Corps of Engineers
- Awardees
- 6
- Task orders
- 20
- Obligated
- $25,426,534
Vehicle facts
- Opportunity
-
- Design Build MATOC Pre-Solicitation · W912EF22R0005 · Posted Oct 14, 2021
- Agency
-
- US Army Corps of Engineers Department of the Army, Department of Defense
- Combined task order value
- $26,697,294 Current and potential, with all options
- Last date to order 70% complete
- Shared ceiling 25% used
- $99,900,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The U.S. Army Corps of Engineers established a Master IDIQ for design-build repair, maintenance, new construction, and renovation of large civil works projects with an ordering period that closes April 30, 2028, leaving approximately 21 months of remaining authority. The vehicle carries a $99.9 million shared ceiling across up to five prime contractors with no set-aside restriction, though individual task orders may be designated for small business.
The vehicle was awarded May 1, 2023, to five primes. Ordering activity peaked at nine task orders in 2023, declined to seven in 2024, and has slowed to four through September 2025, a trend suggesting either maturing demand or saturation of near-term workload. The combined potential value across 20 awarded task orders stands at $26.6 million, with $25.4 million (95% of potential) obligated, indicating the vehicle is heavily utilized relative to its current award ceiling and likely constrained by committed capacity.
Work spans the Walla Walla, Portland, Seattle, Kansas, and Omaha districts covering hydroelectric dams, flood-control facilities, navigation locks, levees, and ancillary infrastructure. Recent awards include McNary Lock Elevator No. 2 replacement ($4.117 million), DNFH electrical distribution building construction ($5.427 million), and levee and boat-ramp repairs ranging from $1.2 million to $2.2 million per order. Task orders are firm-fixed-price, typically 12 to 24 months in duration.
Northbank Civil And Marine, LLC dominates with seven orders valued at $14.4 million combined potential, representing 54% of vehicle activity. Macnak Construction LLC holds five orders worth $6.6 million (25%). Advanced American Construction, Inc., Central Environmental Inc., and LOS Alamos Technical Associates, Inc. split the remainder. Ordering is highly concentrated within the Army Corps of Engineers itself (17 orders, $21 million), with minimal secondary Army funding (2 orders, $5.3 million).
Seventy-five percent of awarded task orders carry no set-aside designation; 25% are total small business awards. The vehicle's ordering authority remains open but ordering velocity has declined sharply in the past nine months, suggesting either pipeline exhaustion or a shift toward larger, less-frequent orders under the shared ceiling constraint.
Description
This requirement is for repair and maintenance of real property and construction services to included new construction and renovation to large civil works projects including flood control and hydroelectric dams, river navigation facilities, maintenance and office facilities, roadways and recreational facilities, and river levees. Specific work may include a combination of design, construction and/or repair within Walla Walla District (NWW), Portland (NWP) District, Seattle District (NWS), Kansas District (NWK), and Omaha District (NWO) project sites.
IDV awards
Latest task orders
Show all 20
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Northbank Civil And Marine, LLC | $14,412,484 | 57% |
| 2 | Macnak Construction LLC | $6,572,747 | 26% |
| 3 | Central Environmental Inc. | $2,406,564 | 9% |
| 4 | Advanced American Construction, Inc. | $1,233,275 | 5% |
| 5 | LOS Alamos Technical Associates, Inc. | $798,964 | 3% |
| 6 | Advanced Technology Construction Corporation | $2,500 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $25,426,534 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $74,919 |
| FY2025 | $12,857,318 |
| FY2024 | $9,532,328 |
| FY2023 | $4,183,604 |
Quick answers
What is the Walla Walla Design Build MATOC 2023 - 2028 contract vehicle?
Walla Walla Design Build MATOC 2023 - 2028 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by US Army Corps of Engineers (Department of the Army), awarded on May 1, 2023.
Which companies hold Walla Walla Design Build MATOC 2023 - 2028?
6 companies hold Walla Walla Design Build MATOC 2023 - 2028's IDV awards, one each. The latest went to Macnak Construction LLC on May 4, 2023. The awardees whose task orders obligated the most are Northbank Civil And Marine, LLC, Macnak Construction LLC and Central Environmental Inc.
How much has been spent through Walla Walla Design Build MATOC 2023 - 2028?
20 task orders have been placed under Walla Walla Design Build MATOC 2023 - 2028, obligating $25,426,534. Their combined current value, with exercised options, is $26,697,294.
What is the shared ceiling of Walla Walla Design Build MATOC 2023 - 2028?
Walla Walla Design Build MATOC 2023 - 2028's shared ceiling is $99,900,000; its task orders have used 25% of it.
Which agencies use Walla Walla Design Build MATOC 2023 - 2028 the most?
The departments whose task orders under Walla Walla Design Build MATOC 2023 - 2028 obligated the most are Department of the Army ($25,426,534).
How much was obligated through Walla Walla Design Build MATOC 2023 - 2028 in fiscal year 2025?
Task orders under Walla Walla Design Build MATOC 2023 - 2028 obligated $12,857,318 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle