USACE KC Missouri River Bank Stabilization Navigation Protection 2012-2017 (BSNP)

Ended Master IDIQ Awarded

Federal agency
Awardees
4
Task orders
17
Obligated
$38,514,077

Vehicle facts

Opportunity
  • W912DQ12R1029 Solicitation number
Agency
Combined task order value
  • $38,514,077 Current, with exercised options
  • $40,254,078 Potential, with all options
Last date to order 100% complete
Shared ceiling 86% used
$45,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers, Kansas City District, established a Master IDIQ on August 13, 2012, for construction and repair of bank stabilization and navigation protection structures (dikes and revetments) on the Missouri River between river mile 0 near St. Louis, Missouri, and river mile 500 near Rulo, Nebraska. The ordering period closed August 12, 2017, making this vehicle inactive for approximately nine years.

The vehicle is closed to new orders. Seventeen task orders were awarded between August 2012 and September 2016, with combined potential value of $40.3 million against a shared ceiling of $45 million. Obligated dollars totaled $38.5 million, representing 96 percent of combined potential value. Ordering activity peaked in 2012 (six orders), declined through 2014 (one order), then rose modestly in 2015 and 2016 (three and four orders respectively).

W A Ellis Construction CO. captured 11 of 17 orders, with combined potential value of $33.4 million—approximately 83 percent of total vehicle awards. Dubuque Barge And Fleeting Service Co. received four orders valued at $6.9 million. Two additional primes, ESI Contracting Corp. and Commercial Contractors Equipment Inc., each received one order with nominal value. All task orders funded the Army Corps of Engineers, Kansas City District. All 17 awards carried no set-aside designation.

Actual work involved placement of quarry-run stone onto dike and revetment structures, notching, and selective rock salvage. Execution relied on floating plant capability (rock barges, towboats, loading barges, and work equipment) with draft requirements of up to six feet. Task orders ranged in individual value from $10 thousand (minimum guarantees) to approximately $3.1 million, with typical orders in the $1.2 million to $2.6 million range and completion timeframes of one to three years. Performance occurred across the full 500-mile stretch of river, with individual orders addressing specific geographic segments and repair objectives including dike extension, flow control structure rehabilitation, and habitat enhancement for pallid sturgeon.

Description

The US Army Corps of Engineers, Kansas City District, has a requirement for Construction and or repair of bank stabilization and navigation protection structures (dikes and revetments) on the Missouri River between river mile 0 (near St. Louis, MO) and river mile 500 (near Rulo, NE). Repair work involves placing new quarry run stone onto the structures as well as excavating notches, and potentially salvaging rock from specified dikes and revetments. Rock placement and notching will be completed primarily through use of floating plant (rock barges, towboats, loading barges and work barges with a track hoe and or drag line) with the capability to draft 6 feet of water in certain areas.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Rock placement 0005 Dubuque Barge And Fleeting Service Co ENDIST Kansas City (USACE) $2,172,109
Construction mrrp bsnp tadpole adaptive management 0004 Dubuque Barge And Fleeting Service Co ENDIST Kansas City (USACE) $1,633,041
Dike extension 0011 W A Ellis Construction CO. ENDIST Kansas City (USACE) $827,666
Missouri river bank stabilization river mile 290 to river mile 0. 0003 W A Ellis Construction CO. ENDIST Kansas City (USACE) $7,196,848
2016 repair and extend river dikes and sills 0009 W A Ellis Construction CO. ENDIST Kansas City (USACE) $1,056,375
Repair river dikes and revetments along the MO river at RM 50-125.2. 0007 W A Ellis Construction CO. ENDIST Kansas City (USACE) $1,989,000
To construct a series of rock dikes, sills and notches in the missouri river to… 0010 W A Ellis Construction CO. ENDIST Kansas City (USACE) $1,228,600
Repair dikes and revetmentson the missouri river from RM 178-460. 0008 W A Ellis Construction CO. ENDIST Kansas City (USACE) $2,624,306
Missouri river bsnp 0006 W A Ellis Construction CO. ENDIST Kansas City (USACE) $1,226,250
Missouri river bsnp repair dikes and revetments river mile 430 to river mile… 0002 W A Ellis Construction CO. ENDIST Kansas City (USACE) $7,312,500
Repair jameson island flow control structure on missouri river at RM 214.3. 0005 W A Ellis Construction CO. ENDIST Kansas City (USACE) $725,000
Bsnp repair dikes and revetments on the missouri river from river mile 226… 0003 Dubuque Barge And Fleeting Service Co ENDIST Kansas City (USACE) $3,054,575
Bsnp repair dikes and revetments on the missouri river from river mile 0… 0004 W A Ellis Construction CO. ENDIST Kansas City (USACE) $787,500
Missouri river bsnp dike and revetment repairs rulo, NE to atchison, KS. 0001 W A Ellis Construction CO. ENDIST Kansas City (USACE) $6,660,308
Minimum guarantee task order award for MATOC for missouri river bank… 0001 Dubuque Barge And Fleeting Service Co ENDIST Kansas City (USACE) $0
Minimum guarantee task order award for MATOC for missouri river bank… 0001 ESI Contracting, Corp. ENDIST Kansas City (USACE) $10,000
Minimum guarantee task order award for MATOC for missouri river bank… 0001 Commercial Contractors Equipment, Inc. ENDIST Kansas City (USACE) $10,000
Show all 17

Top awardees by obligations

Rank Awardee Obligated Share
1 W A Ellis Construction CO. $31,634,352 82%
2 Dubuque Barge And Fleeting Service Co $6,859,725 18%
3 ESI Contracting, Corp. Minimum guarantee only $10,000 <1%
4 Commercial Contractors Equipment, Inc. Minimum guarantee only $10,000 <1%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $38,514,077 100%

Obligations by fiscal year

Fiscal year Obligated
FY2018 -$360,685
FY2017 $1,278,815
FY2016 $5,574,491
FY2015 $5,656,998
FY2014 $1,778,368
FY2013 $4,999,091
FY2012 $19,587,000

Quick answers

What is the BSNP contract vehicle?

USACE KC Missouri River Bank Stabilization Navigation Protection 2012-2017 (BSNP) is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Kansas City (US Army Corps of Engineers), awarded on August 13, 2012.

Which companies hold BSNP?

4 companies hold BSNP's IDV awards, one each. The latest went to ESI Contracting, Corp. on August 13, 2012. The awardees whose task orders obligated the most are W A Ellis Construction CO., Dubuque Barge And Fleeting Service Co and ESI Contracting, Corp.

How much has been spent through BSNP?

17 task orders have been placed under BSNP, obligating $38,514,077.

What is the shared ceiling of BSNP?

BSNP's shared ceiling is $45,000,000; its task orders have used 86% of it.

Which agencies use BSNP the most?

The departments whose task orders under BSNP obligated the most are Department of the Army ($38,514,077).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle