Energy Savings Performance Contract II (ESPC II)
Ended Master IDIQ Awarded
- Federal agency
-
Engineering Support Center Huntsville
- Awardees
- 15 across 16 IDV awards
- Task orders
- 45
- Obligated
- $955,511,360
Vehicle facts
- Opportunity
-
- W912DY08R0019 Solicitation number
- Agency
-
- Engineering Support Center Huntsville US Army Corps of Engineers, Department of Defense
- Combined task order value
-
- $1,347,797,590 Current, with exercised options
- $1,347,827,950 Potential, with all options
- Last date to order 100% complete
- Shared ceiling
- $50,000,000.00 Less than its task orders have obligated
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Corps of Engineers Engineering Support Center Huntsville established this Master IDIQ for Energy Savings Performance Contracts (ESPC) on December 18, 2008, with a last date to order of December 21, 2018—the vehicle is closed to new orders as of 7 years 6 months ago. A successor vehicle, Energy Savings Performance Contract II, was awarded on May 8, 2015, and is the active procurement path for new ESPC work going forward.
Under this vehicle, ESCOs conduct comprehensive energy audits, design energy savings projects, guarantee achievement of energy savings sufficient to cover project costs, arrange third-party financing, and develop Measurement and Verification plans to monitor actual savings. Work spans lighting improvements, HVAC and chiller system upgrades, renewable energy systems, steam and boiler plant decentralization, water and sewer conservation, electrical load shifting, and utility monitoring control systems.
The vehicle awarded 45 task orders between January 2011 and September 2017, with activity concentrated in 2013 and 2014 (11 and 9 orders respectively) and declining thereafter (2 orders in 2017). Combined potential value reached $1.32 billion, with $928.8 million obligated to date (70% of potential). Johnson Controls Government Systems, LLC dominates with 16 orders totaling $415.9 million in combined potential value, followed by Honeywell International, Inc. (8 orders, $337.2 million) and Siemens Government Technologies Inc. (9 orders, $283.2 million). These three firms represent the overwhelming majority of activity; the remaining two named primes (AECOM Usa, Inc. and Noresco, LLC) hold smaller positions. All 45 task orders carried no set-aside designation.
The Department of the Army Corps of Engineers Engineering Support Center Huntsville itself placed 38 of the 45 orders ($1.21 billion combined potential value). The remaining 7 orders funded Navy and Army customer agencies at substantially smaller scales. Task order durations typically extend 10 to 20+ years to align with debt service and performance periods; representative mega-orders include a $121.7 million ceiling order for energy savings improvements (with $86.1 million obligated), an $85.6 million ceiling order for ESPC project work (with $52.9 million obligated), and an $87.3 million ceiling order for APG facility improvements (with $50.1 million obligated). Performance locations concentrate at Army installations across CONUS and overseas territories, including Fort Bliss, Fort Carson, Fort Lee, Fort McCoy, Schofield Barracks, Aberdeen Proving Ground, and Puerto Rico National Guard facilities.
Description
In an ESPC project, the Energy Services Contractor (ESCO) conducts a comprehensive energy audit and identifies improvements that will reduce energy consumption and costs at a U.S. Government installation. The ESCO designs an energy savings project and guarantees that the improvements made will generate savings sufficient to pay for the project over the term of the task order. Additionally, the ESCO develops a Measurement and Verification (M & V) plan that is utilized to monitor the savings resulting from the energy savings project, and arranges 3rd party financing to pay for the project.
IDV awards
Show all 16
Latest task orders
Show 15 more
Latest 25 of 45 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Johnson Controls Government Systems, LLC | $351,393,435 | 37% |
| 2 | Honeywell International, Inc. | $223,544,455 | 23% |
| 3 | Siemens Government Technologies Inc. | $185,841,977 | 19% |
| 4 | AECOM Usa, Inc. | $97,713,211 | 10% |
| 5 | Noresco, LLC | $77,032,288 | 8% |
| 6 | Constellation Newenergy Inc. | $19,163,996 | 2% |
| 7 | Pepco Energy Services, Inc. | $822,000 | <1% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $939,864,538 | 98% |
| 2 | Department of the Navy | $15,646,823 | 2% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $57,289,056 |
| FY2025 | $76,738,284 |
| FY2024 | $68,457,677 |
| FY2023 | $72,326,483 |
| FY2022 | $77,722,421 |
| FY2021 | $69,778,410 |
| FY2020 | $63,783,148 |
| FY2019 | $67,461,743 |
| FY2018 | $111,086,554 |
| FY2017 | $103,201,119 |
| FY2016 | $94,445,199 |
| FY2015 | $24,100,368 |
| FY2014 | $18,989,437 |
| FY2013 | $22,940,391 |
| FY2012 | $21,344,663 |
| FY2011 | $5,846,406 |
Show all 16
Quick answers
What is the ESPC II contract vehicle?
Energy Savings Performance Contract II (ESPC II) is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Engineering Support Center Huntsville (US Army Corps of Engineers), awarded on December 18, 2008.
Which companies hold ESPC II?
15 companies hold ESPC II's 16 IDV awards. The latest went to Leidos Engineering LLC on December 18, 2008. The awardees whose task orders obligated the most are Johnson Controls Government Systems, LLC, Honeywell International, Inc. and Siemens Government Technologies Inc.
How much has been spent through ESPC II?
45 task orders have been placed under ESPC II, obligating $955,511,360. Their combined current value, with exercised options, is $1,347,797,590.
What is the shared ceiling of ESPC II?
The shared ceiling listed for ESPC II, $50,000,000, is less than its task orders have obligated.
Which agencies use ESPC II the most?
The departments whose task orders under ESPC II obligated the most are Department of the Army ($939,864,538) and Department of the Navy ($15,646,823).
How much was obligated through ESPC II in fiscal year 2025?
Task orders under ESPC II obligated $76,738,284 in fiscal year 2025.
What came before and after ESPC II?
It was followed by Energy Savings Performance Contract II (ESPC III).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle