Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025
Ended Master IDIQ Awarded
- Federal agency
-
Air Education and Training Command
+ 1 more agency
- Awardees
- 6
- Task orders
- 122
- Obligated
- $60,106,657
Vehicle facts
- Opportunity
-
- FA301619RA005 Solicitation number
- Agencies
-
- Air Education and Training Command Air Force, Department of Defense
- USAF DFAS Air Force, Department of Defense
- Combined task order value
- $61,916,947 Current and potential, with all options
- Last date to order 100% complete
- Shared ceiling 90% used
- $67,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Air Force Air Education and Training Command awarded this Master IDIQ for Title I and II architect-engineer services supporting Joint Base San Antonio on May 1, 2020, with a shared ceiling of $67 million and an ordering deadline of April 30, 2025 that has now passed.
The vehicle is closed to new ordering. Its lifecycle ran roughly five years, with the bulk of activity concentrated in 2021–2022 (31 and 30 orders respectively) and a marked slowdown through 2024–2025 (17 and 14 orders). The portfolio has executed 122 task orders with combined potential value of $60.1 million, of which $58.3 million (97 percent) is obligated, indicating near-complete drawdown of available funds.
Task orders span planning charrette reports, Title I concept and design studies, and Title II construction administration—typical architect-engineer scope across JBSA facilities. Recent awards address dormitory renovations, military working dog facility redesigns, HVAC system replacements, utilities upgrades, and airfield markings, with orders typically ranging from roughly $100,000 to $2 million in ceiling value.
Five primes dominate the award portfolio: Raymond Pond Solutions 8A II JV LLC holds 32 orders worth $17.2 million in combined potential value; Premier Stanley JV LLC holds 27 orders for $15.6 million; Liberty JV holds 21 orders for $9.6 million; Westeast Design Group LLC holds 19 orders for $8.4 million; and STS Solutions And Training LLC holds 12 orders for $4.9 million. These five firms capture 91 percent of task orders and 93 percent of combined potential value. A long tail of two additional primes rounds out the seven-firm base.
The customer base is heavily concentrated: the Air Force Air Education and Training Command placed 106 of 122 orders valued at $56.3 million (93 percent of portfolio potential value). Secondary customers include the Defense Finance and Accounting Service, the broader Department of the Air Force, Army, and Air Force Materiel Command, collectively accounting for the remaining 16 orders.
Set-aside designations show 101 orders (83 percent) issued without set-aside and 21 orders (17 percent) as Total Small Business, indicating a predominantly open competitive pool with selective small-business reservations. All task orders use firm fixed-price contracts. Work is performed at Joint Base San Antonio locations—Randolph Air Force Base, Lackland Air Force Base, Fort Sam Houston, and Chapman Training Annex—with administrative oversight at the JBSA complex in Texas.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 122 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Raymond Pond Solutions 8A II JV LLC | $17,025,012 | 28% |
| 2 | Premier Stanley JV LLC | $15,642,575 | 26% |
| 3 | Westeast Design Group, LLC | $10,244,288 | 17% |
| 4 | Liberty JV | $7,965,616 | 13% |
| 5 | STS Solutions And Training, LLC | $4,932,790 | 8% |
| 6 | Obrien Engineering Inc. | $4,294,378 | 7% |
| 7 | Raymond Pond Sdvosb JV, LLC | $2,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Air Force | $58,793,090 | 98% |
| 2 | Department of the Army | $814,408 | 1% |
| 3 | Defense Information Systems Agency | $383,066 | 1% |
| 4 | Office of the Secretary of Defense | $116,093 | <1% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $1,853,986 |
| FY2025 | $7,814,326 |
| FY2024 | $11,815,158 |
| FY2023 | $7,757,229 |
| FY2022 | $15,673,313 |
| FY2021 | $14,546,432 |
| FY2020 | $2,230,683 |
Quick answers
What is the Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025 contract vehicle?
Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Education and Training Command (Air Force) and USAF DFAS (Air Force), awarded on May 1, 2020.
Which companies hold Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025?
6 companies hold Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025's IDV awards, one each. The latest went to Liberty JV on May 1, 2020. The awardees whose task orders obligated the most are Raymond Pond Solutions 8A II JV LLC, Premier Stanley JV LLC and Westeast Design Group, LLC.
How much has been spent through Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025?
122 task orders have been placed under Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025, obligating $60,106,657. Their combined current value, with exercised options, is $61,916,947.
What is the shared ceiling of Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025?
Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025's shared ceiling is $67,000,000; its task orders have used 90% of it.
Which agencies use Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025 the most?
The departments whose task orders under Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025 obligated the most are Air Force ($58,793,090), Department of the Army ($814,408) and Defense Information Systems Agency ($383,066).
How much was obligated through Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025 in fiscal year 2025?
Task orders under Title I and II Architect-Engineer Services For Joint Base San Antonio 2020-2025 obligated $7,814,326 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle