Medical Repair and Renewal Design-Build Construction VII (MRR VII)
Active Master IDIQ Awarded
- Federal agency
-
Engineering Support Center Huntsville
- Awardees
- 22
- Task orders
- 70
- Obligated
- $406,104,227
Vehicle facts
- Opportunity
-
- Medical Repair and Renewal Design/Build (MRR DB) Pre-Solicitation · W912DY21R0014 · Posted Dec 17, 2020
- Agency
-
- Engineering Support Center Huntsville US Army Corps of Engineers, Department of Defense
- Combined task order value
-
- $406,213,710 Current, with exercised options
- $406,216,710 Potential, with all options
- Last date to order 25% complete
- Shared ceiling 31% used
- $1,300,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Corps of Engineers Engineering Support Center Huntsville established this Master IDIQ for design-build repair and renewal work at military medical facilities on January 30, 2025, with ordering authority through January 29, 2032. The vehicle carries a shared ceiling of $1.3 billion and is unrestricted—no set-aside at the vehicle level.
Ordering momentum has slowed materially after an initial surge. The vehicle awarded 67 task orders in 2025 (the first year) but only 2 in 2026 through March. The 69 total task orders obligated the entire $396.6 million in combined potential value, indicating that nearly all available funding has been committed early in the contract lifecycle. This front-loading reflects the typical pattern for IDIQs focused on facility maintenance—large repair backlogs flow into task orders quickly, then ordering decelerates.
Work scope reflects the originating solicitation's intent: major repair and minor construction across architectural, mechanical, electrical, instrumentation, security, and safety systems at DoD medical installations. Awarded task orders show a spread of project types—roof replacements (Mountain Home AFB, Tyndall AFB), HVAC system overhauls (air handler and chiller replacements), fire alarm and emergency power system replacements, sterilization processing department renovation, building envelope repairs, and infrastructure beautification. Several orders exceed $20 million (mechanical repairs across Tripler Army Medical Center, electrical distribution at Reynolds Army Health Clinic, sterilization processing and plumbing system replacements at Walter Reed National Medical Center). Task order durations typically run 18 to 36 months from award date.
Competition is moderately concentrated among a small set of primes. J & J Maintenance Inc. dominates by value with $87.2 million across 6 orders; Facility Services Management Inc., Stampede Ventures Inc., and Structsure Projects Inc. combine for another $181.4 million. These five firms hold 78 percent of the combined potential value, while 22 distinct primes share the portfolio. By order count, Spectrum Solutions Inc. and Stampede Ventures each hold 11 awards, but that spreads orders more broadly—the top five by count hold 59 percent of task orders. Winning this vehicle requires design-build and medical-facility operational expertise; the work demands knowledge of infection control, Joint Commission compliance, and working within occupied hospital environments.
Funding concentration is extreme. The Department of the Army Corps of Engineers Engineering and Support Center placed 24 orders worth $282 million (71 percent of obligated value); the Engineering Support Center Huntsville placed 23 orders worth $1.6 million; and the Mobile and Little Rock districts added another 20 orders worth $73.5 million. Roughly 99 percent of orders trace to Army medical facility funding. Only one task order (less than 2 percent) carried a small-business set-aside; the remainder are unrestricted competitive awards.
Given the near-complete obligation of potential value and the sharp drop in 2026 ordering, immediate pursuit makes sense only if your firm is already positioned on an active task-order competition or if you can demonstrate capacity to support scope revisions or follow-on task orders. New entrants should watch for the vehicle's successor or assess whether remaining ceiling authority (roughly $900 million unobligated against the $1.3 billion shared ceiling) will generate additional task orders before the January 2032 close.
IDV awards
Show all 22
Latest task orders
Show 15 more
Latest 25 of 70 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | J & J Maintenance Inc. | $87,171,928 | 21% |
| 2 | Facility Services Management, Inc. | $73,834,735 | 18% |
| 3 | Stampede Ventures, Inc. | $62,806,831 | 15% |
| 4 | Structsure Projects Inc. | $52,627,017 | 13% |
| 5 | SES Electrical LLC | $42,062,162 | 10% |
| 6 | Spectrum Solutions Inc. | $31,951,913 | 8% |
| 7 | HDD JV | $22,076,000 | 5% |
| 8 | Centennial Contractors Enterprises, Inc. | $19,316,206 | 5% |
| 9 | Matos Builders LLC | $12,302,232 | 3% |
| 10 | Global Engineering & Construction, LLC | $1,919,204 | <1% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $406,104,227 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $27,309,141 |
| FY2025 | $378,795,087 |
Quick answers
What is the MRR VII contract vehicle?
Medical Repair and Renewal Design-Build Construction VII (MRR VII) is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Engineering Support Center Huntsville (US Army Corps of Engineers), awarded on January 30, 2025.
Which companies hold MRR VII?
22 companies hold MRR VII's IDV awards, one each. The latest went to Perini Management Services, Inc. on January 30, 2025. The awardees whose task orders obligated the most are J & J Maintenance Inc., Facility Services Management, Inc. and Stampede Ventures, Inc.
How much has been spent through MRR VII?
70 task orders have been placed under MRR VII, obligating $406,104,227. Their combined current value, with exercised options, is $406,213,710.
What is the shared ceiling of MRR VII?
MRR VII's shared ceiling is $1,300,000,000; its task orders have used 31% of it.
Which agencies use MRR VII the most?
The departments whose task orders under MRR VII obligated the most are Department of the Army ($406,104,227).
How much was obligated through MRR VII in fiscal year 2025?
Task orders under MRR VII obligated $378,795,087 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle