JPALS ATC Shipboard Integration 2019
Ended Master IDIQ Awarded
- Federal agency
-
Naval Air Warfare Center
- Awardees
- 7
- Task orders
- 9
- Obligated
- $55,825,004
Vehicle facts
- Opportunity
-
- Air-4-11 ATC jpals shipboard integration MAC Pre-Solicitation · N0042118R0022 · Posted Oct 30, 2018
- Agency
-
- Naval Air Warfare Center Naval Air Systems Command, Department of Defense
- Combined task order value
-
- $71,660,488 Current, with exercised options
- $73,622,980 Potential, with all options
- Last date to order 100% complete
- Shared ceiling 57% used
- $98,625,565.00
- Predecessor
- JPALS NUCAS WFN AAR
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Navy Naval Air Warfare Center awarded this Master IDIQ on April 25, 2019, to provide systems engineering support for the Joint Precision Approach and Landing System (JPALS) and related air traffic control and landing systems. Ordering closed on April 24, 2024; this vehicle is no longer active.
The vehicle established a $98.6 million ceiling over a five-year ordering period. Task orders awarded under it carry a combined potential value of $73.6 million, of which $56 million (76 percent) has been obligated. Activity concentrated front-loaded: seven orders issued in 2019, one in 2020, and one in 2021. The most recent task order award occurred on February 1, 2021. The vehicle succeeded a predecessor IDIQ, JPALS NUCAS WFN AAR, awarded in 2013.
Work comprises systems engineering, testing, logistical support, and program integration for aircraft and shipboard algorithms that integrate Global Positioning System and inertial sensor outputs through robust data links. Place of performance is St. Inigoes, Maryland (Naval Air Warfare Center Aircraft Division, Patuxent River Code 4.11.7). All funding flows from the Department of the Navy Naval Air Systems Command Naval Air Warfare Center; no cross-agency customer base exists.
Two firms dominate the prime contractor base. J.f. Taylor, Inc. holds 2 task orders worth $37.1 million combined potential value; Coherent Technical Services, Inc. holds 2 orders worth $36.5 million combined potential value. These two primes account for roughly 99 percent of the vehicle's combined potential value. Booz Allen Hamilton Inc., Engility Services, LLC, and BAE Systems Technology Solutions & Services Inc. each hold 1 order with $10 thousand potential value; a wider field of small business contractors completes the roster.
The vehicle was unrestricted at award. Task-order set-aside mix reflects this: eight orders (89 percent) carry no set-aside; one order (11 percent) is designated Total Small Business. Two major cost-plus-fixed-fee task orders dominate the portfolio—one to Coherent Technical Services, Inc. (ceiling $36.5 million, obligated $24.98 million, completion April 22, 2026) and one to J.f. Taylor, Inc. (ceiling $37.1 million, obligated $31 million, completion April 14, 2026). Multiple orders carried minimum-guarantee ceilings of $10 thousand.
Description
The Air Traffic Control (ATC) Systems Division, Naval Air Warfare Center, Aircraft Division (NAWCAD) is the In-Service Engineering Agent (ISEA) and Software Support Activity (SSA) for Air Traffic Control and Landing Systems (ATC & LS). The ATC Division provides systems engineering support to developmental programs such as the Joint Precision Approach and Landing System (JPALS), Navy Unmanned Combat Air System (N-UCAS) and various unmanned programs. The JPALS program is developing the next generation air traffic control and landing system. Satisfactory performance of the system will depend on both aircraft and shipboard algorithms that can adequately integrate Global Positioning System (GPS) and inertial sensor outputs through a robust data link.
IDV awards
Latest task orders
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | J.f. Taylor, Inc. | $30,802,378 | 55% |
| 2 | Coherent Technical Services, Inc. | $24,982,626 | 45% |
| 3 | Booz Allen Hamilton Inc. | $10,000 | <1% |
| 4 | Engility Services, LLC | $10,000 | <1% |
| 5 | Valkyrie Enterprises, LLC | $10,000 | <1% |
| 6 | Gryphon Technologies, L.C. | $10,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $55,825,004 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $2,381,513 |
| FY2025 | $8,954,957 |
| FY2024 | $10,273,677 |
| FY2023 | $13,000,499 |
| FY2022 | $10,473,840 |
| FY2021 | $9,292,288 |
| FY2020 | $1,215,220 |
| FY2019 | $70,000 |
Quick answers
What is the JPALS ATC Shipboard Integration 2019 contract vehicle?
JPALS ATC Shipboard Integration 2019 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Naval Air Warfare Center (Naval Air Systems Command), awarded on April 25, 2019.
Which companies hold JPALS ATC Shipboard Integration 2019?
7 companies hold JPALS ATC Shipboard Integration 2019's IDV awards, one each. The latest went to Valkyrie Enterprises, LLC on April 25, 2019. The awardees whose task orders obligated the most are J.f. Taylor, Inc., Coherent Technical Services, Inc. and Booz Allen Hamilton Inc.
How much has been spent through JPALS ATC Shipboard Integration 2019?
9 task orders have been placed under JPALS ATC Shipboard Integration 2019, obligating $55,825,004. Their combined current value, with exercised options, is $71,660,488.
What is the shared ceiling of JPALS ATC Shipboard Integration 2019?
JPALS ATC Shipboard Integration 2019's shared ceiling is $98,625,565; its task orders have used 57% of it.
Which agencies use JPALS ATC Shipboard Integration 2019 the most?
The departments whose task orders under JPALS ATC Shipboard Integration 2019 obligated the most are Department of the Navy ($55,825,004).
How much was obligated through JPALS ATC Shipboard Integration 2019 in fiscal year 2025?
Task orders under JPALS ATC Shipboard Integration 2019 obligated $8,954,957 in fiscal year 2025.
What came before and after JPALS ATC Shipboard Integration 2019?
JPALS ATC Shipboard Integration 2019 succeeded JPALS NUCAS WFN AAR.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle