Agency
Combined task order value
  • $204,362,842 Current, with exercised options
  • $204,383,842 Potential, with all options
Last date to order 92% complete
Shared ceiling 46% used
$385,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Air Force Materiel Command Air Force Sustainment Center awarded a Master IDIQ for multiple construction disciplines at Hill Air Force Base and Utah Air National Guard Base on March 24, 2022, with ordering authority through March 23, 2027 — approximately eight months of remaining ordering window. The vehicle is fully set aside for total small business under NAICS 236220 (Commercial and Institutional Building Construction, $36.5 million size standard).

Ordering momentum has declined substantially. The vehicle averaged 15–18 orders annually in its first two years (2022–2023) but dropped to 11–12 orders in 2024–2025 and only 6 orders in the first five months of 2026, suggesting the vehicle is in its closing phase. Of the $192.8 million combined task-order potential value, $166.5 million (86 percent) is already obligated, leaving limited remaining capacity on a vehicle with fewer than nine months of ordering authority.

Scope spans design, demolition, utilities, structures, electrical, mechanical, and general construction for maintenance, repair, alteration, and new construction. Work locations include Hill AFB and Utah Air National Guard Base in Utah, with remote sites at Boulder Seismic Station (Pinedale, Wyoming), Little Mountain (Utah), Utah Test and Training Range, and Carter Creek (Utah). Representative recent task orders address building repairs (roof replacement, HVAC systems, fire suppression), renovations (dorm, office space, industrial bays), demolitions, and major projects such as F-35 depot expansion and software engineering facilities. All awarded task orders use firm-fixed-price pricing.

Competition is concentrated among five firms. Sahara Palms Inc. holds the largest combined potential value at $59.4 million across 15 orders, while Nve-Hhi JV contributes $45 million across 4 orders and RHI LLC brings $44.8 million across 20 orders. West Coast JV, LLC and Doyon Management Services, LLC round out the top five. These five primes capture 96 percent of combined potential value. Customer concentration is also high: the Department of the Air Force Materiel Command Air Force Sustainment Center funds 39 orders valued at $130.8 million, while the broader Department of the Air Force funds 22 orders at $61.1 million; the Air National Guard accounts for only 3 orders at $930 thousand.

Nearly three-quarters of awarded task orders (47 of 64) are small-business set-asides, with the remainder (17 orders) carrying no set-aside designation. Task-order values range widely, from $130,377 to $26.1 million ceiling (F-35 Depot Expansion Phase II), with typical orders in the $1 million to $8 million range.

Description

Multiple disciplines in general construction to be managed by the 75th Civil Engineering Group (CEG) at Hill Air Force Base (HAFB) and Utah Air National Guard Base (UAGB), Utah. Project locations may also include remote sites such as Boulder Seismic Station Pinedale, Wyoming; Little Mountain, Utah; Utah Test and Training Range (UTTR); and Carter Creek, Utah.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Renovation of bldg. 349 dorm at hill AFB. FA820125F0381 RHI LLC AFSC $8,124,657
Repair high pressure fire suppression system B5038 FA820123F0006 West Coast JV, LLC AFSC $18,322,834
Secure software facility #3 FA820125F0371 RHI LLC AFSC $7,540,631
MACC/repair elec distribution, multiple blds FA820125F0075 RHI LLC AFSC $2,371,727
Bldg. 1515 construct two story data center FA820125F0256 Sahara Palms Inc. AFSC $14,058,670
Bldg 1207 renovate for secure workload FA820126F0199 RHI LLC AFSC $4,304,635
Bldg. 2113 renovate computed tomography FA820126F0197 Sahara Palms Inc. AFSC $3,923,320
Contruct material storage annex, B510 FA820125F0193 Sahara Palms Inc. AFSC $1,197,578
Replace fume ventilation system BAY e B100 FA820124F0207 Sahara Palms Inc. AFSC $3,251,281
Bldg 1 repair maintenance depot hangar FA820124F0271 Sahara Palms Inc. AFSC $857,171
Bldg. 220 repair exterior and openings FA820126F0123 RHI LLC AFSC $5,074,862
Renovation of bldg. 470 CDC at hill AFB FA820125F0348 Sahara Palms Inc. AFSC $8,829,107
Bldg. 5009 repair incoming PDM apron FA820126F0065 West Coast JV, LLC AFSC $6,978,986
Bldg 265 replace roof FA820126F0062 Doyon Management Services, LLC AFSC $5,082,173
Demolition of bldgs. 1239 and 1836 at hill AFB FA820126F0040 GE JV LLC AFSC $1,464,546
B1209 and B898 complete demo FA820126F0039 GE JV LLC AFSC $668,746
Bldg 843 repair industrial maintenance bays h, k, and m with sound FA820126F0027 RHI LLC AFSC $1,507,114
Bldg 2005, 2013, 2024 renovation of hydrazine process bldg facilities FA820126F0021 Nve-Hhi JV AFSC $7,338,238
This f-35 depot expansion phase II project will convert two c-130 maintenance… FA820123F0137 Nve-Hhi JV AFSC $47,758
Demo B461 and pool 2 FA820125F0008 West Coast JV, LLC AFSC $425,877
Bldg. 1515 repair fire suppression FA820124F0301 West Coast JV, LLC AFSC $1,378,419
Repair HVAC, B100 BAY d FA820123F0273 Sahara Palms Inc. AFSC $3,369,904
Repair BAY d, expand work area and breakroom, B5 FA820125F0235 Nve-Hhi JV AFSC $11,586,193
Bldg. 238 replace generators FA820125F0311 RHI LLC AFSC $1,467,870
Multiple award construction contract IV for hill AFB. The task orders issued… FA820125F0110 RHI LLC AFSC $1,012,938
Show 15 more

Latest 25 of 66 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Sahara Palms Inc. $64,096,546 36%
2 RHI LLC $49,479,159 28%
3 West Coast JV, LLC $28,289,374 16%
4 Nve-Hhi JV $18,974,689 11%
5 Doyon Management Services, LLC $9,628,829 5%
6 GE JV LLC $4,770,003 3%
7 Dsb-Rlr II Joint Venture LLC $1,870,738 1%
8 RIO Vista Management LLC $249,447 <1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $177,358,785 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $40,679,495
FY2025 $56,484,446
FY2024 $17,489,415
FY2023 $68,809,351
FY2022 $20,054,703

Quick answers

What is the Hill AFB Multiple Award Construction Contract IV contract vehicle?

Hill AFB Multiple Award Construction Contract IV is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Force Sustainment Center (Air Force Materiel Command), awarded on March 24, 2022.

Which companies hold Hill AFB Multiple Award Construction Contract IV?

9 companies hold Hill AFB Multiple Award Construction Contract IV's IDV awards, one each. The latest went to Nve-Hhi JV on March 24, 2022. The awardees whose task orders obligated the most are Sahara Palms Inc., RHI LLC and West Coast JV, LLC.

How much has been spent through Hill AFB Multiple Award Construction Contract IV?

66 task orders have been placed under Hill AFB Multiple Award Construction Contract IV, obligating $177,358,785. Their combined current value, with exercised options, is $204,362,842.

What is the shared ceiling of Hill AFB Multiple Award Construction Contract IV?

Hill AFB Multiple Award Construction Contract IV's shared ceiling is $385,000,000; its task orders have used 46% of it.

Which agencies use Hill AFB Multiple Award Construction Contract IV the most?

The departments whose task orders under Hill AFB Multiple Award Construction Contract IV obligated the most are Air Force ($177,358,785).

How much was obligated through Hill AFB Multiple Award Construction Contract IV in fiscal year 2025?

Task orders under Hill AFB Multiple Award Construction Contract IV obligated $56,484,446 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle