General construction repair and upgrade of USFK facilities

Active Master IDIQ Awarded

Federal agency
Awardees
21
Task orders
58
Obligated
$68,908,134

Vehicle facts

Agency
  • Pacific Region Installation Management Command, Department of Defense
Combined task order value
$68,711,547 Current and potential, with all options
Last date to order 61% complete
Shared ceiling 28% used
$245,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

Department of the Army Installation Management Command Pacific Region established a multiple-award IDIQ for general construction repair and upgrade of U.S. Forces Korea (USFK) facilities on October 5, 2023, with a shared ceiling of $245 million and ordering authority extending through October 4, 2028. The vehicle is unrestricted; all 52 task orders awarded to date carry no set-aside designation.

Ordering activity has peaked and is declining. The vehicle funded 32 task orders in 2024, 15 in 2025, and only 4 in 2026 (through May 29). The most recent award was May 29, 2026. Combined task-order potential value is $57.8 million, fully obligated; this represents 23.6 percent of the $245 million ceiling, suggesting substantial remaining capacity.

Task orders span repair and maintenance across multiple work classes: barracks and building repairs, water distribution system remediation, HVAC and chiller replacement, perimeter fence installation and repair, runway and taxiway pavement marking, gate installation, utility infrastructure (fire hydrants, railroad track repair), and facility-specific work such as generator installation and roofing repair at named camps and bases. Recent awards include cryogenic tank relocation, sewage treatment plant bypass installation, and resilient surface replacement on airfields.

Competition is moderately concentrated. The top three primes by potential value—LK Construction Co., LTD. ($14.2 million across 8 orders), Sori E&C Co., Ltd. ($13.2 million across 9 orders), and Yeajin E&C Co., Ltd. ($9.9 million across 5 orders)—hold 82 percent of combined potential value. Nineteen distinct primes have won awards; the long tail includes Yuil Eng. & Const. Co., Ltd., Taewang E&C Co., LTD., and Yibon Construction Co., LTD., each with smaller task-order bases.

Customer concentration is high. Department of the Army Installation Management Command Korean Region placed 20 orders valued at $37.9 million (66 percent of portfolio value). Marine Corps and other Army customers account for most remaining activity. Order values range from $5,000 minimum guarantees to a single $6.1 million award for chiller and HVAC replacement at Camp Mujuk. All orders are firm fixed price.

Performance is geographically dispersed across Republic of Korea USFK installations: Camp Hovey, Camp Humphreys, Camp Mujuk, Camp Henry, Camp Bonifas, Camp Walker, Osan Air Base, Kunsan Air Base, and additional named facilities.

Description

This IDIQ focues on the repair and upgrade of USFK facilities located in the Republic of Korea

IDV awards

Show all 21

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Maximum contract amount - K work W90VN825F0019 Yeajin E&C Co.,Ltd. RCO Camp Humphreys 411th CSB $2,173,316
MATOC work plan contractors korea-wide general construction for LCS project… W90VN626FA055 Yuil Eng. & Const. Co.,Ltd RCO Osan 411th CSB $2,298,014
CY26 LCS, sockor HQ ACS upgrade priority #67, DOC W91QVN26FA435 Sori E&C Co.,Ltd RCO Yongsan 411th CSB $60,828
CY 26 LCS, repair buildings S-61 and S-62, camp casey W90VN826FA059 Yuil Eng. & Const. Co.,Ltd RCO Camp Humphreys 411th CSB $4,389,336
CY 25 LCS, PAN411-25-P-0000 002178, repair deteriorated barracks camp hovey W90VN825FA045 LK Construction Co., LTD. RCO Camp Humphreys 411th CSB $2,196,284
Repair failed elevators on air control tower and headquarters, B600, 870, and… W90VN626FA050 Yuil Eng. & Const. Co.,Ltd RCO Osan 411th CSB $1,109,386
CY25 LCS, project #1-48, PAN411-25-P-0000 002152, RM W90VN825FA061 LK Construction Co., LTD. RCO Camp Humphreys 411th CSB $3,010,292
Repair south loop taxiway W90VN726FA039 LK Construction Co., LTD. RCO Kunsan 411th CSB $1,360,078
Smyu 25-1070, osan air base parking apron extension W90VN626FA037 Yibon Construction Co., LTD. RCO Osan 411th CSB $1,868,070
CY25 N-list project no.: 01-03, CY25 LCS, sals-K (ARMY) US ARMY ammunition… W91QVN26FA052 Hyundai Livart Furniture Co.,Ltd. RCO Yongsan 411th CSB $125,367
CY26 LCS repair slqs camp hovey W90VN826FA045 LK Construction Co., LTD. RCO Camp Humphreys 411th CSB $2,978,053
Relocate existing liquefied nitrogen (LIN) and liquefied oxygen (LOX) cryogenic… W90VN726FA027 Sori E&C Co.,Ltd RCO Kunsan 411th CSB $356,511
Sewage treatment plant bypass line installation camp mujuk, pohang, korea W90VN926FA084 LK Construction Co., LTD. RCO Daegu 411th CSB $349,889
Replace deteriorated gravel paved barker field with resilient surface and… W91QVN26FA318 Krima Construction Corp. RCO Yongsan 411th CSB $1,855,196
Osan rigging facility renovation, B1391, osan AB W91QVN25FA643 Kumsung Construction Co., LTD. RCO Yongsan 411th CSB $267,081
Repair deteriorated water distribution system, CY25 LCS, project #01-51, pay… W90VN825FA053 Yuil Eng. & Const. Co.,Ltd RCO Camp Humphreys 411th CSB $1,723,471
CY25 LCS, PAN411-25-P-0000 002185, PR amount: 3,046,426.92 W90VN825FA042 Sori E&C Co.,Ltd RCO Camp Humphreys 411th CSB $2,729,579
LCS CY25 MLWR24-1009, repair taxiway and apron pavement marking W90VN725FA017 Yeajin E&C Co.,Ltd. RCO Kunsan 411th CSB $557,930
MLWR25-1012, repair runway pavement markings michael a. Weatherford, 1ST LT… W90VN725FA014 Yeajin E&C Co.,Ltd. RCO Kunsan 411th CSB $562,990
Maximum contract amount - K work W90VN825F0012 Sori E&C Co.,Ltd RCO Camp Humphreys 411th CSB $4,137,663
B7628, camp humphreys install HVAC system W91QVN26FA014 Sori E&C Co.,Ltd RCO Yongsan 411th CSB $165,288
Repair perimeter fence and install fire hydrants for helipads and AHA area… W90VN824F0026 Taewang E&C Co., LTD. RCO Camp Humphreys 411th CSB $1,221,847
Replace existing deteriorated light fixtures at various facilities at CFA… W90VN925F0001 Yeajin E&C Co.,Ltd. RCO Daegu 411th CSB $367,138
Replace fire hydrants at CP tango W90VN824F0031 Seojin Construction Co.,Ltd RCO Camp Humphreys 411th CSB $450,598
LCS repair railroad track, on and off base at osan AB, ROK W90VN625FA081 Janghak E&C RCO Osan 411th CSB $205,476
Show 15 more

Latest 25 of 58 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 LK Construction Co., LTD. $15,636,115 23%
2 Sori E&C Co.,Ltd $13,263,322 19%
3 Yuil Eng. & Const. Co.,Ltd $10,396,243 15%
4 Yeajin E&C Co.,Ltd. $9,808,863 14%
5 Yibon Construction Co., LTD. $6,370,985 9%
6 Taewang E&C Co., LTD. $5,388,231 8%
7 Dongjin Construction Co., LTD. $2,537,729 4%
8 Krima Construction Corp. $1,860,196 3%
9 Seojin Construction Co.,Ltd $1,138,208 2%
10 Daemyung Engineering And Construction Co., LTD. $825,217 1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $49,493,537 72%
2 Department of the Navy $14,079,610 20%
3 Air Force $5,334,986 8%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $16,903,945
FY2025 $21,301,197
FY2024 $30,702,992

Quick answers

What is the General construction repair and upgrade of USFK facilities contract vehicle?

General construction repair and upgrade of USFK facilities is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Pacific Region (Installation Management Command), awarded on October 5, 2023.

Which companies hold General construction repair and upgrade of USFK facilities?

21 companies hold General construction repair and upgrade of USFK facilities's IDV awards, one each. The latest went to Geumjang Construction Co.,Ltd on October 5, 2023. The awardees whose task orders obligated the most are LK Construction Co., LTD., Sori E&C Co.,Ltd and Yuil Eng. & Const. Co.,Ltd.

How much has been spent through General construction repair and upgrade of USFK facilities?

58 task orders have been placed under General construction repair and upgrade of USFK facilities, obligating $68,908,134. Their combined current value, with exercised options, is $68,711,547.

What is the shared ceiling of General construction repair and upgrade of USFK facilities?

General construction repair and upgrade of USFK facilities's shared ceiling is $245,000,000; its task orders have used 28% of it.

Which agencies use General construction repair and upgrade of USFK facilities the most?

The departments whose task orders under General construction repair and upgrade of USFK facilities obligated the most are Department of the Army ($49,493,537), Department of the Navy ($14,079,610) and Air Force ($5,334,986).

How much was obligated through General construction repair and upgrade of USFK facilities in fiscal year 2025?

Task orders under General construction repair and upgrade of USFK facilities obligated $21,301,197 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle