$73,285,830

Vehicle facts

Opportunity
Agency
Combined task order value
$79,839,710 Current and potential, with all options
Last date to order 68% complete
Shared ceiling 49% used
$150,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

Department of the Army Installation Management Command Northeast Region established the Fort Drum MATOC, a Master IDIQ for construction and repair services at Fort Drum, New York, on June 7, 2023, with ordering authority extending through June 6, 2028 (approximately 1 year 10 months of ordering time remaining). The vehicle carries a shared ceiling of $150 million across a combined potential value of $79.2 million in 39 awarded task orders, of which $73.2 million (92 percent) has been obligated.

The vehicle funds a broad suite of facility maintenance and repair disciplines including carpentry, HVAC, plumbing, electrical, roofing, excavation, concrete masonry, welding, and emergency repairs. Task orders awarded to date span barracks renovations ($13.3 million), fire system replacements, hangar repairs, water distribution system repairs, road rehabilitation, and miscellaneous facility improvements, with individual order values typically ranging from roughly $100,000 to $13.4 million and performance durations of four to eighteen months.

Competition is heavily concentrated. Armitage SAI JV holds 12 of 39 orders and $60 million in combined potential value—roughly 76 percent of all obligated funds. The next three primes (Black Horse Group LLC, Sgtr RJO JV LLC, and MNS KJE JV Inc.) collectively hold 17 orders and $17.6 million. Nine distinct primes are on the vehicle overall. Ordering activity peaked in 2024 with 20 orders and has slowed markedly: only 5 orders were placed in 2025 through September.

Nearly all demand originates from the Army Installation Management Command Northeast Region, which funded 38 of 39 orders. The originating solicitation was structured as a competitive 8(a) set-aside; however, execution has shifted dramatically away from reserved categories. Eighty-two percent of awarded orders carry no set-aside, 10 percent are HUBZone, and 8 percent are competitive 8(a). No task orders have been awarded on a sole-source basis to any contractor category.

All work is performed at or in support of Fort Drum, New York.

Description

This contract shall be an indefinite delivery, indefinite quantity (ID/IQ) contract encompassing a wide variety of individual construction and repair task and trades. Such work is to include but not limited to carpentry, road repair, roofing, excavation, interior and exterior electrical, heating, ventilating and air conditioning (HVAC), plumbing, sheet metal work, painting, demolition, concrete masonry, welding, emergency repairs, water lines and gas line construction and repair. The Contractor's work and responsibility shall include all Contractor planning, programming, administration, and management necessary to provide all repair or construction and related services as specified.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Repair and renovate facility, P2060 (hangar) W911S225FA103 Armitage SAI JV MICC Fort Drum $14,048,722
Replace fire system 2792 and 2793 W911S225FA113 Armitage SAI JV MICC Fort Drum $567,443
Repair HVAC, 10745 EK-22115-2J W911S225FA002 Black Horse Group LLC MICC Fort Drum $253,519
Repair barracks building 10122 W911S224F8500 Armitage SAI JV MICC Fort Drum $13,355,637
Repair and restore loading dock, building 2745. W911S225FA032 Black Horse Group LLC MICC Fort Drum $1,094,774
EZC-23015-3J fire training area improvements W911S225FA159 Black Horse Group LLC MICC Fort Drum $1,833,595
Replace usts and piping at 4230 W911S224F8521 Armitage SAI JV MICC Fort Drum $225,873
Repair CMU block building 22628 W911S224F8519 MNS KJE JV Inc. MICC Fort Drum $117,944
Repair water vault valves area phase 3 W911S224F8515 Sgtr RJO JV, LLC MICC Fort Drum $167,947
Repair water vault valves phase 4 W911S224F8516 MNS KJE JV Inc. MICC Fort Drum $679,932
Repair water distibution system area 6 W911S224F8513 Armitage SAI JV MICC Fort Drum $542,732
RPR water distro system area 5 W911S224F8523 MNS KJE JV Inc. MICC Fort Drum $1,564,057
Repair valves and piping 2082 W911S224F8517 Sgtr RJO JV, LLC MICC Fort Drum $198,934
Repair wash rack, P21510 W911S224F8514 Armitage SAI JV MICC Fort Drum $100,719
Repair HVAC at 10502 W911S224F8509 Sgtr RJO JV, LLC MICC Fort Drum $1,088,849
Repair PO valley road W911S224F8511 Armitage SAI JV MICC Fort Drum $1,687,838
Replace FPS, ceiling, and lights P2650 W911S224F8510 Clean Water Mechanical & Construction - Call Associates JV, LLC MICC Fort Drum $1,170,641
Minimum guarantee W911S223F8516 Kunj Construction Corporation MICC Fort Drum $0
Minimum guarantee. W911S223F8510 Armitage SAI JV MICC Fort Drum $13,256,534
Repair roof membrane, P2070 W911S224F8518 Black Horse Group LLC MICC Fort Drum $406,228
Repair barracks p-10114 W911S223F8517 Armitage SAI JV MICC Fort Drum $13,130,463
Install second grinder, 11000 W911S223F8527 Sgtr RJO JV, LLC MICC Fort Drum $812,192
PX-PW101-0J, repair PX parking lot W911S224F8507 Armitage SAI JV MICC Fort Drum $1,859,551
Replace MVH hydrants W911S223F8519 Armitage SAI JV MICC Fort Drum $524,228
Repair, rehabilitation and construction W911S224F8506 Addon Services LLC MICC Fort Drum $111,599
Show 15 more

Latest 25 of 39 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Armitage SAI JV $59,964,966 82%
2 Sgtr RJO JV, LLC $4,580,574 6%
3 Black Horse Group LLC $3,971,851 5%
4 MNS KJE JV Inc. $3,217,049 4%
5 Clean Water Mechanical & Construction - Call Associates JV, LLC $1,212,502 2%
6 New Dominion Construction LLC $129,504 <1%
7 Addon Services LLC $111,599 <1%
8 Doyon Technical Services, LLC Minimum guarantee only $97,786 <1%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $73,285,830 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $89,392
FY2025 -$11,032,503
FY2024 $54,294,761
FY2023 $29,839,050

Quick answers

What is the Fort Drum MATOC contract vehicle?

Fort Drum MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Northeast Region (Installation Management Command), awarded on June 7, 2023.

Which companies hold Fort Drum MATOC?

9 companies hold Fort Drum MATOC's IDV awards, one each. The latest went to Kunj Construction Corporation on July 12, 2023. The awardees whose task orders obligated the most are Armitage SAI JV, Sgtr RJO JV, LLC and Black Horse Group LLC.

How much has been spent through Fort Drum MATOC?

39 task orders have been placed under Fort Drum MATOC, obligating $73,285,830. Their combined current value, with exercised options, is $79,839,710.

What is the shared ceiling of Fort Drum MATOC?

Fort Drum MATOC's shared ceiling is $150,000,000; its task orders have used 49% of it.

Which agencies use Fort Drum MATOC the most?

The departments whose task orders under Fort Drum MATOC obligated the most are Department of the Army ($73,285,830).

How much was obligated through Fort Drum MATOC in fiscal year 2025?

Task orders under Fort Drum MATOC obligated -$11,032,503 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle