Fairchild AFB Construction MACC 2012-2018
Ended Master IDIQ Awarded
- Federal agency
-
Air Mobility Command
- Awardees
- 5
- Task orders
- 82
- Obligated
- $98,836,561
Vehicle facts
- Opportunity
-
- FA462012RB001 Solicitation number
- Agency
-
- Air Mobility Command Air Force, Department of Defense
- Combined task order value
- $98,836,561 Current and potential, with all options
- Last date to order 100% complete
- Shared ceiling
- $95,000,000.00 Less than its task orders have obligated
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
Ordering under this Air Mobility Command construction IDIQ is closed and has been since January 11, 2018. The vehicle was established July 12, 2012, to support maintenance, repair, minor construction, and new construction across general construction disciplines at Fairchild Air Force Base, Washington, with a shared ceiling of $95 million. All 82 task orders awarded under the contract have been fully obligated against the combined potential value of $98.8 million.
The vehicle saw peak activity in 2014 and 2015, averaging roughly 24 orders per year during those two years, then declined sharply to 16 orders in 2016, with the final award made September 30, 2016. The work spans typical airfield and facility maintenance—taxiway and apron repairs, fire suppression and HVAC system upgrades, roof repairs, electrical distribution work, asphalt and concrete slab restoration, and building interior finishes. Several orders required equitable adjustments and modifications to address differing site conditions, particularly on flightline pavement work and fire-suppression installations.
Northcon Inc. and M.j. Cleansvendornametrait.phptakisaki, Inc. together captured roughly 78% of awarded orders by count and 80% of combined potential value, with Northcon holding 37 orders valued at $44.1 million and M.j. Cleansvendornametrait.phptakisaki holding 23 orders valued at $35 million. Ahtna Engineering Services, LLC took 10 orders for $12.3 million. The remaining three firms split the long tail. About 91% of orders carried a total small-business set-aside, with the remaining 9% unrestricted. Roughly 96% of the dollar value was obligated to Air Mobility Command; the balance funded other Air Force entities. Task orders ranged from $414 on the low end (orientation seminars) to $7.96 million, with most substantive construction awards falling between $500,000 and $2.5 million. All awards carried firm fixed pricing.
Description
Multiple Award Construction Contract (MACC) at Fairchild AFB, WA that consists of multiple disciplines in general construction categories and executing a broad range of maintenance, repair, minor and/or new construction.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 82 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Northcon Inc. | $44,110,096 | 45% |
| 2 | M.j. Takisaki, Inc. | $35,044,235 | 35% |
| 3 | Ahtna Engineering Services, LLC | $12,337,089 | 12% |
| 4 | Tss-Garco Joint Venture | $5,685,049 | 6% |
| 5 | E Corp | $1,660,092 | 2% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Air Force | $98,836,561 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2020 | $84,908 |
| FY2019 | $61,347 |
| FY2018 | $628,800 |
| FY2017 | $1,541,217 |
| FY2016 | $28,711,315 |
| FY2015 | $27,573,194 |
| FY2014 | $20,659,393 |
| FY2013 | $9,081,658 |
| FY2012 | $10,494,730 |
Quick answers
What is the Fairchild AFB Construction MACC 2012-2018 contract vehicle?
Fairchild AFB Construction MACC 2012-2018 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Mobility Command (Air Force), awarded on July 12, 2012.
Which companies hold Fairchild AFB Construction MACC 2012-2018?
5 companies hold Fairchild AFB Construction MACC 2012-2018's IDV awards, one each. The latest went to Tss-Garco Joint Venture on July 18, 2012. The awardees whose task orders obligated the most are Northcon Inc., M.j. Takisaki, Inc. and Ahtna Engineering Services, LLC.
How much has been spent through Fairchild AFB Construction MACC 2012-2018?
82 task orders have been placed under Fairchild AFB Construction MACC 2012-2018, obligating $98,836,561.
What is the shared ceiling of Fairchild AFB Construction MACC 2012-2018?
The shared ceiling listed for Fairchild AFB Construction MACC 2012-2018, $95,000,000, is less than its task orders have obligated.
Which agencies use Fairchild AFB Construction MACC 2012-2018 the most?
The departments whose task orders under Fairchild AFB Construction MACC 2012-2018 obligated the most are Air Force ($98,836,561).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle