Design Build Northeast Multiple Award Task Order Contract 2021 - 2031
Active Master IDIQ Awarded
- Federal agency
-
ENDIST Louisville
- Awardees
- 7
- Task orders
- 28
- Obligated
- $120,813,070
Vehicle facts
- Opportunity
-
- D/B Northeast MATOC Pre-Solicitation · W912QR19R0009 · Posted Mar 3, 2020
- Agency
-
- ENDIST Louisville US Army Corps of Engineers, Department of Defense
- Combined task order value
-
- $122,940,289 Current, with exercised options
- $125,417,482 Potential, with all options
- Last date to order 53% complete
- Shared ceiling 48% used
- $250,000,005.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Corps of Engineers Engineering District Louisville awarded a multiple-award Master IDIQ on May 21, 2021, for design-build and design-bid-build construction and renovation projects across nineteen Northeastern states (Connecticut, Delaware, District of Columbia, Illinois, Indiana, Kentucky, Maine, Maryland, Massachusetts, Michigan, New Hampshire, New Jersey, New York, Ohio, Pennsylvania, Rhode Island, Vermont, Virginia, West Virginia, and Wisconsin), with a combined ceiling of $250 million and ordering authority through July 25, 2031. The vehicle is a 100% small-business set-aside at the vehicle level, though actual task-order distribution shows mixed set-aside usage. Ordering remains open with approximately five years of authority remaining.
Twenty-seven task orders have been awarded since July 2021, generating $122.1 million in combined potential value, of which $117.6 million (96 percent) is obligated. Ordering momentum has moderated; the portfolio averaged 4.8 orders per year over the first five years (2022–2026) but fell to one order in 2027 to date. Competition is concentrated among small-business primes: Butt Construction Company, Incorporated leads with nine orders worth $45.4 million combined potential value, followed by Howard W. Pence, Inc. with seven orders valued at $40 million. These two firms account for roughly 70 percent of the vehicle's potential value. HDD JV, SES Construction And Fuel Services LLC, and A & H-Ambica JV LLC represent the remaining awarded small-business capacity. Nearly all orders (24 of 27) fund Louisville District-managed projects; only three orders ($105 thousand combined potential value) have funded work outside the district.
Task orders funded under the vehicle range from $10 thousand minimum guarantees to ceiling values exceeding $19 million, with typical construction scopes including facility renovation, new construction, emergency repairs, and infrastructure maintenance. Recent awards span military installation work (Fort Campbell child development center renovation, Air Force Reserve Center design-build at Langley-Eustis), emergency response (Covington emergency levee repair), and specialized facilities (NSWC Crane test track, DSCC Columbus HVAC replacement). Performance locations concentrate in the Northeast region but extend across military installations and federal facilities throughout the vehicle's geographic scope. The vehicle's effective remaining life and high obligation rate suggest limited additional capacity remains for new entrants.
Description
Design-build and design-bid-build construction and renovation projects within the Northeast Region of the Louisville District's Area of Responsibility. The Northeast region will cover the following states: Connecticut, Delaware, District of Columbia, Illinois, Indiana, Kentucky, Maine, Maryland, Massachusetts, Michigan, New Hampshire, New Jersey, New York, Ohio, Pennsylvania, Rhode Island, Vermont, Virginia, West Virginia, and Wisconsin.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 28 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Butt Construction Company, Incorporated | $45,450,994 | 38% |
| 2 | Howard W. Pence, Inc. | $38,444,922 | 32% |
| 3 | HDD JV | $19,754,381 | 16% |
| 4 | SES Construction And Fuel Services LLC | $14,218,966 | 12% |
| 5 | A & H-Ambica JV LLC | $2,923,807 | 2% |
| 6 | Futron, Inc. | $10,000 | <1% |
| 7 | Kunj Construction Corporation | $10,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $120,813,070 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $5,452,614 |
| FY2025 | $18,353,793 |
| FY2024 | $6,057,243 |
| FY2023 | $64,038,450 |
| FY2022 | $26,840,969 |
| FY2021 | $70,000 |
Quick answers
What is the Design Build Northeast Multiple Award Task Order Contract 2021 - 2031 contract vehicle?
Design Build Northeast Multiple Award Task Order Contract 2021 - 2031 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Louisville (US Army Corps of Engineers), awarded on May 21, 2021.
Which companies hold Design Build Northeast Multiple Award Task Order Contract 2021 - 2031?
7 companies hold Design Build Northeast Multiple Award Task Order Contract 2021 - 2031's IDV awards, one each. The latest went to HDD JV on July 26, 2021. The awardees whose task orders obligated the most are Butt Construction Company, Incorporated, Howard W. Pence, Inc. and HDD JV.
How much has been spent through Design Build Northeast Multiple Award Task Order Contract 2021 - 2031?
28 task orders have been placed under Design Build Northeast Multiple Award Task Order Contract 2021 - 2031, obligating $120,813,070. Their combined current value, with exercised options, is $122,940,289.
What is the shared ceiling of Design Build Northeast Multiple Award Task Order Contract 2021 - 2031?
Design Build Northeast Multiple Award Task Order Contract 2021 - 2031's shared ceiling is $250,000,005; its task orders have used 48% of it.
Which agencies use Design Build Northeast Multiple Award Task Order Contract 2021 - 2031 the most?
The departments whose task orders under Design Build Northeast Multiple Award Task Order Contract 2021 - 2031 obligated the most are Department of the Army ($120,813,070).
How much was obligated through Design Build Northeast Multiple Award Task Order Contract 2021 - 2031 in fiscal year 2025?
Task orders under Design Build Northeast Multiple Award Task Order Contract 2021 - 2031 obligated $18,353,793 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle