BSNP River Structure Maintenance
Active Master IDIQ Awarded
- Federal agency
-
ENDIST Omaha
- Awardees
- 5
- Task orders
- 4
- Obligated
- $2,628,720
Vehicle facts
- Opportunity
-
- Bank Stabilization and Navigation Project (BSNP) River Structure Maintenance Multiple Award Task Order Contract (MATOC) Pre-Solicitation · W9128F25R0043 · Posted May 19, 2025
- Agency
-
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Combined task order value
- $2,628,720 Current and potential, with all options
- Last date to order 23% complete
- Shared ceiling 5% used
- $49,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Corps of Engineers Engineering District Omaha established a Master IDIQ for Bank Stabilization and Navigation Project (BSNP) river structure maintenance on August 27, 2025, with ordering authority extending through August 26, 2030. The vehicle carries a $49 million shared ceiling and is restricted to small businesses only under NAICS 237990 (Other Heavy and Civil Engineering Construction), with a $45 million size standard.
Work encompasses maintenance of navigation channels on the Missouri River from River Mile 498.2 to River Mile 750.0, including incidental excavation, stone placement, and construction of navigation features such as revetments, roots, reverse sills, chevrons, dikes, L-heads, and kickers. Placement locations are generally accessible via floating plant, though some land access and landward placement is required. The vehicle is structured as a multiple-award MATOC designed to establish a small business contractor pool.
Four task orders totaling $2.6 million in combined potential value have been awarded since establishment, with all four issued within the first week of the vehicle's launch (August 27–September 2, 2025). Western Contracting Corp holds one order valued at $2.6 million; Midwest Construction Co, Dubuque Barge and Fleeting Service Co, and W A Ellis Construction CO each hold one order at $3 thousand. All task orders carry firm fixed pricing. One Western Contracting Corp delivery order completes on January 25, 2027; the three smaller orders and one additional Western Contracting Corp award extend through August 26, 2030. The vehicle has obligated its entire $2.6 million combined potential value to date. All ordering activity funds the Omaha District directly, with no distribution across other customer agencies. No set-aside designations have been applied to awarded task orders despite the vehicle's small-business-only status at the vehicle level, indicating task orders are being issued competitively within the small business pool.
IDV awards
Latest task orders
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Western Contracting Corp | $2,619,720 | 100% |
| 2 | Midwest Construction Co | $3,000 | <1% |
| 3 | Dubuque Barge And Fleeting Service Co | $3,000 | <1% |
| 4 | W A Ellis Construction CO. | $3,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $2,628,720 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2025 | $2,628,720 |
Quick answers
What is the BSNP River Structure Maintenance contract vehicle?
BSNP River Structure Maintenance is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Omaha (US Army Corps of Engineers), awarded on August 27, 2025.
Which companies hold BSNP River Structure Maintenance?
5 companies hold BSNP River Structure Maintenance's IDV awards, one each. The latest went to W A Ellis Construction CO. on August 28, 2025. The awardees whose task orders obligated the most are Western Contracting Corp, Midwest Construction Co and Dubuque Barge And Fleeting Service Co.
How much has been spent through BSNP River Structure Maintenance?
4 task orders have been placed under BSNP River Structure Maintenance, obligating $2,628,720.
What is the shared ceiling of BSNP River Structure Maintenance?
BSNP River Structure Maintenance's shared ceiling is $49,000,000; its task orders have used 5% of it.
Which agencies use BSNP River Structure Maintenance the most?
The departments whose task orders under BSNP River Structure Maintenance obligated the most are Department of the Army ($2,628,720).
How much was obligated through BSNP River Structure Maintenance in fiscal year 2025?
Task orders under BSNP River Structure Maintenance obligated $2,628,720 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle