Vehicle facts

Opportunity
  • W9128F11R0011 Solicitation number
Agency
  • ENDIST Omaha US Army Corps of Engineers, Department of Defense
Combined task order value
  • $23,503,793 Current, with exercised options
  • $23,949,777 Potential, with all options
Last date to order 100% complete

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Army Corps of Engineers Engineering District Omaha established this architect-engineer Master IDIQ for petroleum oils and lubricants (POL) infrastructure design services on March 1, 2012, with a final ordering date of February 28, 2017—now closed for more than nine years. The vehicle awarded 76 delivery orders totaling $23.9 million in combined potential value, of which $23.5 million (98%) has been obligated. All task orders are unrestricted (no set-aside).

Ordering momentum accelerated near the vehicle's close: the portfolio awarded only 5 orders in 2013 but ramped to 22 orders in 2017, reflecting a strong final push before cutoff. The most recent task orders, all awarded on or before February 28, 2017, ranged in value from $37 thousand to $2 million, with individual ceilings typically between $50 thousand and $800 thousand, though several larger design and construction-phase orders exceeded $1 million (including W9128F12D0002-0028 at $1.92 million ceiling and W9128F12D0005-0004 at $2.01 million ceiling).

Three firms dominate the award count and value: Burns & Mcdonnell Engineering Company, Inc. (30 orders, $8.7 million), Pond & Company (21 orders, $8.6 million), and Robert And Company (25 orders, $6.7 million). These three captured all 76 orders.

Customer concentration is high. Defense Logistics Agency Energy placed 44 orders (58% of the portfolio) valued at $10.8 million, primarily for tank inspections and fuels infrastructure at domestic military installations and overseas bases. Department of the Army Corps of Engineers Engineering District Omaha followed with 21 orders ($5.9 million), while the Corps' Japan district placed 3 orders ($3.5 million). Nine distinct customer agencies placed orders overall.

Awarded work spans site inspections (above-ground storage tanks, API tank inspections), requirements documents, design phases (35%, 65%, 100% design), construction-phase services, and planning studies across domestic and overseas locations. Notable projects include hydrant fuel systems and tank replacement at Nellis AFB, Iwakuni Japan, and Kadena AB. Place of performance includes continental U.S. military installations and significant overseas work in Japan, Honduras, and other OCONUS locations.

This vehicle is expired and closed to new task orders. It represents a completed acquisition family with no successor vehicle noted in the source.

Description

Architect engineering design services for worldwide locations, petroleum, oils, and lubricants (POL) center of expertise (COE), Omaha district, U.S. Army Corps of Engineers.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Savannah ANG fueling facility requirements documents. 0023 Robert And Company ENDIST Omaha (USACE) $90,662
M - FY16 AST inspections for tanks at various locations (AST group 21) 0024 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $159,231
M - AST inspections, USAF academy, CO 0019 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $6,542
M milcon design for truck offload facility at kadena AB, japan 0028 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $1,690,540
PPS - phase 2, for knox, KY 0023 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $179,873
Tank inspection dyess AFB, TX 0025 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $114,297
M - AE phase II study, letterkenny army depot, PA 0022 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $122,066
Construction phase service FY14 DLA milcon DESC1401 construct type III fuel… 2R01 Pond & Company ENDIST Japan (USACE) $133,612
M: FT. Campbell, KY, atlantic city ANG, arnold ANG AST inspections 0027 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $156,542
M - API inspections at homestead ARB, FL and cape canaveral AFS, FL 0021 Robert And Company ENDIST Omaha (USACE) $247,805
A-e services to design F35A truck fillstand addition located at nellis. 0013 Robert And Company ENDIST Omaha (USACE) $777,931
M - AE PPS PH II, mcas beaufort SC 0015 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $153,742
Langley fuels, virginia, P2-397023 0011 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $1,624,447
M - AST inspections, kwajalein, marshall islands 0029 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $316,935
M- AE PPS PH II, mcrd parris island, SC 0014 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $136,459
Tank inspections - fenty 0018 Robert And Company ENDIST Omaha (USACE) $111,741
Tank inspections - shaw AFB/pope 0025 Robert And Company ENDIST Omaha (USACE) $63,226
Robert grey army airfield- fort hood, TX 0012 Pond & Company ENDIST Omaha (USACE) $56,149
Tank 2115 AST inspection mcguire AFB 0016 Robert And Company ENDIST Omaha (USACE) $218,139
Pittsburgh PA tank 105 inspection 0015 Robert And Company ENDIST Omaha (USACE) $87,781
Fuel storage tanks, iwakuni japan 0014 Pond & Company ENDIST Omaha (USACE) $1,446,883
Milcon design services for t-5 fuel pier, iwakuni, japan 0016 Pond & Company ENDIST Omaha (USACE) $576,567
Wright patterson and beckley tank inspections 0026 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $184,622
Camp grayling and columbus tank inspections 0021 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $98,759
Camp grissom tank inspections 0020 Burns & Mcdonnell Engineering Company, Inc. ENDIST Omaha (USACE) $37,362
Show 15 more

Latest 25 of 76 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Burns & Mcdonnell Engineering Company, Inc. $8,475,676 36%
2 Pond & Company $8,430,465 36%
3 Robert And Company $6,597,652 28%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Defense Logistics Agency $13,690,291 58%
2 Department of the Army $9,758,789 42%
3 Air Force $54,713 <1%

Obligations by fiscal year

Fiscal year Obligated
FY2021 -$42,047
FY2020 $118,800
FY2019 -$25,969
FY2018 $1,020,137
FY2017 $6,094,136
FY2016 $3,991,309
FY2015 $5,605,231
FY2014 $2,911,061
FY2013 $2,638,416
FY2012 $1,192,719

Quick answers

What is the Army A-E for Petroleum Oils and Lubricants 2012-2017 contract vehicle?

Army A-E for Petroleum Oils and Lubricants 2012-2017 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Omaha (US Army Corps of Engineers), awarded on March 1, 2012.

Which companies hold Army A-E for Petroleum Oils and Lubricants 2012-2017?

3 companies hold Army A-E for Petroleum Oils and Lubricants 2012-2017's IDV awards, one each. The latest went to Pond & Company on March 1, 2012. The awardees whose task orders obligated the most are Burns & Mcdonnell Engineering Company, Inc., Pond & Company and Robert And Company.

How much has been spent through Army A-E for Petroleum Oils and Lubricants 2012-2017?

76 task orders have been placed under Army A-E for Petroleum Oils and Lubricants 2012-2017, obligating $23,503,793.

Which agencies use Army A-E for Petroleum Oils and Lubricants 2012-2017 the most?

The departments whose task orders under Army A-E for Petroleum Oils and Lubricants 2012-2017 obligated the most are Defense Logistics Agency ($13,690,291), Department of the Army ($9,758,789) and Air Force ($54,713).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle