Air Force Regional Engineering and Construction - Central 2016-2021

Ended Master IDIQ Awarded

Federal agency
Awardees
11
Task orders
148
Obligated
$893,936,428

Vehicle facts

Agency
Combined task order value
  • $1,002,548,919 Current, with exercised options
  • $1,007,634,880 Potential, with all options
Last date to order 100% complete
Shared ceiling
$300,000,000.00 Less than its task orders have obligated

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Air Force Materiel Command Installation and Mission Support Center Civil Engineer Center established the Air Force Regional Engineering and Construction - Central 2016-2021 Master IDIQ on December 7, 2016, with ordering authority that closed on December 21, 2021. The vehicle is no longer accepting new task orders; 148 orders have been placed under it since award, with the most recent issued on December 6, 2024. Combined potential value across all task orders stands at $903.6 million, with $836.1 million already obligated (93% of potential value).

The vehicle funds design-build, design-bid-build, and repair-renovation work across Air Force installations and Air National Guard bases in the central region, encompassing building systems (HVAC, fire protection, electrical, roofing, interior finishes), runway and taxiway repair, fuel facility construction and maintenance, and dormitory renovation. Recent orders reflect a mix of sustained maintenance (rubber removal and runway markings, fire suppression repairs, tank API 653 certifications) and capital projects (dormitory renovations at JBSA Lackland and Goodfellow AFB, runway reconstruction at Sheppard AFB valued at $45.5 million, building renovations at Offutt AFB).

Mowa-Barlovento Joint Venture A leads by order count (33 orders, $211.2 million combined potential value) and potential value share. CMS Corporation ranks second by potential value ($189.7 million across 19 orders), while Bhate Environmental Associates, Inc. holds the second-most orders (31) but third-largest combined value ($102.4 million). The top five primes capture 76% of task orders and 78% of combined potential value. Ordering concentration on the customer side is stronger: the Air Force Civil Engineer Center (the awarding body) places 38 orders valued at $374.9 million (the largest single customer), followed by Air Education and Training Command with 43 orders at $217.7 million, and Air Combat Command with 39 orders at $100.9 million. These three Air Force components account for roughly 71% of all orders.

Set-asides are split roughly even: 55% of orders carry no set-aside designation, while 45% are reserved for small business, predominantly total small-business set-asides. Task orders are firm fixed price, ranging from under $200,000 for minor repairs to over $31 million for design-build dormitory and building renovations. Obligated values typically align with ceiling values, indicating tight estimation. Place of performance spans Air Force and Air National Guard installations across the central United States, with heavy concentration at JBSA (Randolph, Lackland, Fort Sam Houston), Offutt AFB, Tinker AFB, Cannon AFB, Dyess AFB, and other major operational and training bases.

IDV awards

Show all 11

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Design and construction services for renovation B115 armament facility… FA890323F0143 Bristol General Contractors, LLC AFICA $7,690,491
Repair of heating, ventilation and air conditioning (HVAC) at building 3453. FA303024F0040 CMS Corporation AETC $11,620,778
Interior repair and remodeling of 188 dormitory rooms, common spaces, and… FA462124F0017 Ahtna-Cdm Smith JV AMC $26,040,861
Repair fuel tanks at mcconnell and grand forks FA890323F0133 Bristol General Contractors, LLC AFICA $6,640,317
Construct missile deck - B1000 at offutt AFB, NE FA460024F0214 Bhate Environmental Associates, Inc. ACC $2,546,569
Design-build construction services to repair/refurbish main ramp, aircraft… FA890323F0146 Ahtna-Cdm Smith JV AFICA $16,198,715
Repair electrical substation B565 at offutt AFB, NE FA460023F0073 Mowa-Barlovento Joint Venture A ACC $6,880,622
Repair fuel tanks 273, 331, 965, 998, 3710 & 21090, API 653 repairs of… FA890322F0158 CMS Corporation AFICA $10,505,633
API 653 repair fuels tanks at laughlin AFB, TX whiteman AFB, MO and rosecrans… FA890322F0098 Bhate Environmental Associates, Inc. AFICA $24,254,055
Barksdale AFB amrs project FA805124F0044 Mowa-Barlovento Joint Venture A AFICA $3,246,149
Repair_B401_cyber_network_processing_center FA303024F0004 CMS Corporation AETC $10,321,925
Tank repairs at altus and malmstrom air force bases and at minneapolis/ ST. Paul FA890323F0109 Tepa Construction Solutions, LLC AFICA $16,361,707
Renovation of B147 swtw FA301622F0316 HHI Corporation AETC $32,327,784
Design build renovate B862 JBSA randolph TX FA890322F0140 HHI Corporation AFICA $32,161,891
Design build construction services for repair airborne warning and control… FA890319F0153 Mowa-Barlovento Joint Venture A AFICA $49,181,236
Repair fuel tanks at multiple locations cannon AFB, NM ellsworth AFB, SD FA890322F0156 CMS Corporation AFICA $15,685,114
Project includes renovating existing office areas into upgrades controlled… FA460024F0119 Bhate Environmental Associates, Inc. ACC $2,527,775
Repair by replace power plant controls FA254321F0003 CMS Corporation AFSPC $7,628,722
Renovate C2F cafeteria, B1000 - a design-build project to renovate C2F… FA460024F0120 Bhate Environmental Associates, Inc. ACC $1,344,988
Repair and upgrade of fuels facilities at FE warren AFB, WY. FA890325F0022 Bhate Environmental Associates, Inc. AFICA $8,987,310
Repair/renovate student dorm building 10656 at JBSA lackland, TX project no… FA890323F0127 CMS Corporation AFICA $15,246,237
Upgrade dual power, B1022, offutt air force base, nebraska. FA460023F0134 Bhate Environmental Associates, Inc. ACC $1,128,646
Replace fire protection systems - B507 at offutt AFB, NE FA460024F0212 Mowa-Barlovento Joint Venture A ACC $703,464
Repair erosion at dmset B6866 FA301621F0354 HJD Capital Electric, Inc. AETC $1,558,309
Design-build construction services under the regional engineering and… FA890324F0068 Mowa-Barlovento Joint Venture A AFICA $14,700,618
Show 15 more

Latest 25 of 148 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Mowa-Barlovento Joint Venture A $210,213,680 24%
2 CMS Corporation $192,827,234 22%
3 HHI Corporation $101,711,978 11%
4 Bhate Environmental Associates, Inc. $101,291,109 11%
5 Bristol General Contractors, LLC $96,247,142 11%
6 Tepa Construction Solutions, LLC $63,661,530 7%
7 Jsr-Ecc, LLC $53,459,637 6%
8 Ahtna-Cdm Smith JV $49,517,551 6%
9 HJD Capital Electric, Inc. $25,000,568 3%
10 Portico Services LLC $3,000 <1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $745,206,977 83%
2 Defense Logistics Agency $148,729,450 17%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $25,291,808
FY2025 $49,290,213
FY2024 $187,720,325
FY2023 $132,535,479
FY2022 $240,289,949
FY2021 $56,704,754
FY2020 $82,842,662
FY2019 $78,378,418
FY2018 $40,849,821
FY2017 $33,000

Quick answers

What is the Air Force Regional Engineering and Construction - Central 2016-2021 contract vehicle?

Air Force Regional Engineering and Construction - Central 2016-2021 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Force Civil Engineer Center (Air Force Installation and Mission Support Center), awarded on December 7, 2016.

Which companies hold Air Force Regional Engineering and Construction - Central 2016-2021?

11 companies hold Air Force Regional Engineering and Construction - Central 2016-2021's IDV awards, one each. The latest went to CMS Corporation on December 7, 2016. The awardees whose task orders obligated the most are Mowa-Barlovento Joint Venture A, CMS Corporation and HHI Corporation.

How much has been spent through Air Force Regional Engineering and Construction - Central 2016-2021?

148 task orders have been placed under Air Force Regional Engineering and Construction - Central 2016-2021, obligating $893,936,428. Their combined current value, with exercised options, is $1,002,548,919.

What is the shared ceiling of Air Force Regional Engineering and Construction - Central 2016-2021?

The shared ceiling listed for Air Force Regional Engineering and Construction - Central 2016-2021, $300,000,000, is less than its task orders have obligated.

Which agencies use Air Force Regional Engineering and Construction - Central 2016-2021 the most?

The departments whose task orders under Air Force Regional Engineering and Construction - Central 2016-2021 obligated the most are Air Force ($745,206,977) and Defense Logistics Agency ($148,729,450).

How much was obligated through Air Force Regional Engineering and Construction - Central 2016-2021 in fiscal year 2025?

Task orders under Air Force Regional Engineering and Construction - Central 2016-2021 obligated $49,290,213 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle