Air Force Regional Engineering and Construction - Central 2016-2021
Ended Master IDIQ Awarded
- Federal agency
-
Air Force Civil Engineer Center
- Awardees
- 11
- Task orders
- 148
- Obligated
- $893,936,428
Vehicle facts
- Agency
-
- Air Force Civil Engineer Center Air Force Installation and Mission Support Center, Department of Defense
- Combined task order value
-
- $1,002,548,919 Current, with exercised options
- $1,007,634,880 Potential, with all options
- Last date to order 100% complete
- Shared ceiling
- $300,000,000.00 Less than its task orders have obligated
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Air Force Materiel Command Installation and Mission Support Center Civil Engineer Center established the Air Force Regional Engineering and Construction - Central 2016-2021 Master IDIQ on December 7, 2016, with ordering authority that closed on December 21, 2021. The vehicle is no longer accepting new task orders; 148 orders have been placed under it since award, with the most recent issued on December 6, 2024. Combined potential value across all task orders stands at $903.6 million, with $836.1 million already obligated (93% of potential value).
The vehicle funds design-build, design-bid-build, and repair-renovation work across Air Force installations and Air National Guard bases in the central region, encompassing building systems (HVAC, fire protection, electrical, roofing, interior finishes), runway and taxiway repair, fuel facility construction and maintenance, and dormitory renovation. Recent orders reflect a mix of sustained maintenance (rubber removal and runway markings, fire suppression repairs, tank API 653 certifications) and capital projects (dormitory renovations at JBSA Lackland and Goodfellow AFB, runway reconstruction at Sheppard AFB valued at $45.5 million, building renovations at Offutt AFB).
Mowa-Barlovento Joint Venture A leads by order count (33 orders, $211.2 million combined potential value) and potential value share. CMS Corporation ranks second by potential value ($189.7 million across 19 orders), while Bhate Environmental Associates, Inc. holds the second-most orders (31) but third-largest combined value ($102.4 million). The top five primes capture 76% of task orders and 78% of combined potential value. Ordering concentration on the customer side is stronger: the Air Force Civil Engineer Center (the awarding body) places 38 orders valued at $374.9 million (the largest single customer), followed by Air Education and Training Command with 43 orders at $217.7 million, and Air Combat Command with 39 orders at $100.9 million. These three Air Force components account for roughly 71% of all orders.
Set-asides are split roughly even: 55% of orders carry no set-aside designation, while 45% are reserved for small business, predominantly total small-business set-asides. Task orders are firm fixed price, ranging from under $200,000 for minor repairs to over $31 million for design-build dormitory and building renovations. Obligated values typically align with ceiling values, indicating tight estimation. Place of performance spans Air Force and Air National Guard installations across the central United States, with heavy concentration at JBSA (Randolph, Lackland, Fort Sam Houston), Offutt AFB, Tinker AFB, Cannon AFB, Dyess AFB, and other major operational and training bases.
IDV awards
Show all 11
Latest task orders
Show 15 more
Latest 25 of 148 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Mowa-Barlovento Joint Venture A | $210,213,680 | 24% |
| 2 | CMS Corporation | $192,827,234 | 22% |
| 3 | HHI Corporation | $101,711,978 | 11% |
| 4 | Bhate Environmental Associates, Inc. | $101,291,109 | 11% |
| 5 | Bristol General Contractors, LLC | $96,247,142 | 11% |
| 6 | Tepa Construction Solutions, LLC | $63,661,530 | 7% |
| 7 | Jsr-Ecc, LLC | $53,459,637 | 6% |
| 8 | Ahtna-Cdm Smith JV | $49,517,551 | 6% |
| 9 | HJD Capital Electric, Inc. | $25,000,568 | 3% |
| 10 | Portico Services LLC | $3,000 | <1% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Air Force | $745,206,977 | 83% |
| 2 | Defense Logistics Agency | $148,729,450 | 17% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $25,291,808 |
| FY2025 | $49,290,213 |
| FY2024 | $187,720,325 |
| FY2023 | $132,535,479 |
| FY2022 | $240,289,949 |
| FY2021 | $56,704,754 |
| FY2020 | $82,842,662 |
| FY2019 | $78,378,418 |
| FY2018 | $40,849,821 |
| FY2017 | $33,000 |
Quick answers
What is the Air Force Regional Engineering and Construction - Central 2016-2021 contract vehicle?
Air Force Regional Engineering and Construction - Central 2016-2021 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Force Civil Engineer Center (Air Force Installation and Mission Support Center), awarded on December 7, 2016.
Which companies hold Air Force Regional Engineering and Construction - Central 2016-2021?
11 companies hold Air Force Regional Engineering and Construction - Central 2016-2021's IDV awards, one each. The latest went to CMS Corporation on December 7, 2016. The awardees whose task orders obligated the most are Mowa-Barlovento Joint Venture A, CMS Corporation and HHI Corporation.
How much has been spent through Air Force Regional Engineering and Construction - Central 2016-2021?
148 task orders have been placed under Air Force Regional Engineering and Construction - Central 2016-2021, obligating $893,936,428. Their combined current value, with exercised options, is $1,002,548,919.
What is the shared ceiling of Air Force Regional Engineering and Construction - Central 2016-2021?
The shared ceiling listed for Air Force Regional Engineering and Construction - Central 2016-2021, $300,000,000, is less than its task orders have obligated.
Which agencies use Air Force Regional Engineering and Construction - Central 2016-2021 the most?
The departments whose task orders under Air Force Regional Engineering and Construction - Central 2016-2021 obligated the most are Air Force ($745,206,977) and Defense Logistics Agency ($148,729,450).
How much was obligated through Air Force Regional Engineering and Construction - Central 2016-2021 in fiscal year 2025?
Task orders under Air Force Regional Engineering and Construction - Central 2016-2021 obligated $49,290,213 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle