Air Force Construction MACC 2016-2021

Ended Master IDIQ Awarded

Federal agency
Awardees
4
Task orders
136
Obligated
$83,323,899

Vehicle facts

Opportunity
  • FA460015R0027 Solicitation number
Agency
Combined task order value
  • $86,201,433 Current, with exercised options
  • $86,916,149 Potential, with all options
Last date to order 100% complete
Shared ceiling 93% used
$90,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

Air Force ACC awarded this Master IDIQ for military construction services at Offutt Air Force Base in fiscal 2016, with ordering authority that closed on May 31, 2021. The vehicle is no longer active; no new orders may be placed.

A single small firm, Pro-Mark Services Inc., captured 62% of all awarded task-order potential value, with $54.5 million across 61 orders. Weldin Construction LLC holds 23% ($19.6 million, 36 orders). Sp-Jv, LLC and Gideon Contracting, LIMITED Liability Company account for the remaining 15% combined. Of 136 total task orders awarded through May 2021, small-business designations apply to 95 orders (70%), with the remainder either unrestricted or partially set-aside. Activity peaked in 2017 and 2018, declining to a single order by 2021.

The vehicle's combined potential value of $86.9 million has been largely obligated; $83.3 million (96%) is currently committed. Air Combat Command originated 130 of the 136 task orders, representing $85.1 million in potential value. A handful of other Air Force commands and the Defense Logistics Agency placed the remaining six orders valued under $1 million combined.

Task-order scope spans routine base-maintenance and repair across mechanical, electrical, structural, and infrastructure systems. Recent awards address chiller repairs, flight-simulator renovation, water-tank protection, fire-suppression systems, pavement repair, parking-lot and fence rehabilitation, HVAC installation, roof replacement, and facilities modernization. Orders range from $7 thousand to $8.4 million in ceiling value. Work is performed at Offutt Air Force Base in Nebraska. Most task orders employ firm fixed-price contracts with durations from several months to two years; some include extension options and modifications for scope adjustments and schedule relief.

This vehicle is closed to new business and substantially obligated, making it useful primarily as a reference for understanding how ACC structures construction requirements and awards small-business participation on military construction MACCs.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Repair golf apron area B673 FA460020F0023 Weldin Construction LLC ACC $5,989,003
Renovate OFT-5 flight simulator, B493 FA460020F0192 Pro-Mark Services Inc. ACC $8,050,051
Repair pmel FA460020F0162 Sp-Jv, LLC ACC $1,600,130
Repair pavement butler blvd FA460020F0060 Sp-Jv, LLC ACC $2,049,692
Repair dfac north and south parking lots FA460020F0055 Weldin Construction LLC ACC $945,706
Repair chiller #1 and #2, B500 FA460021F0055 Pro-Mark Services Inc. ACC $596,844
Repair basement g wing saccs B500 FA460019FA207 Pro-Mark Services Inc. ACC $2,525,850
Remove and replace existing twin screw chiller B457 FA460020F0081 Pro-Mark Services Inc. ACC $341,934
Repair 38RS mission planning room B49 FA460020F0109 Sp-Jv, LLC ACC $390,404
Flood plain cable RE-route and saccs relocate FA460020F0156 Sp-Jv, LLC ACC $328,390
Expand B40 vault/create open storage FA460020F0138 Pro-Mark Services Inc. ACC $536,487
Install gates valves butler blvd F627 FA460020F0079 Pro-Mark Services Inc. ACC $669,059
Repair metering sanitary sewer manhole, F624 FA460020F0087 Weldin Construction LLC ACC $804,318
Repair armory FA460020F0073 Pro-Mark Services Inc. ACC $405,937
NCC relocation runway reroute project FA460020F0056 Pro-Mark Services Inc. ACC $2,037,146
Upgrade east entrance monument B1000 FA460019FA205 Pro-Mark Services Inc. ACC $364,046
Water tank protection FA460020F0095 Sp-Jv, LLC ACC $98,840
Repair mass parking area transformers FA460019FA196 Pro-Mark Services Inc. ACC $1,370,961
Repair s boundary fence, F635 (sgbp 21-2050) FA460020F0058 Pro-Mark Services Inc. ACC $22,260
Repair parking B565 FA460018FAC31 Weldin Construction LLC ACC $1,113,911
Repair fire alarm panel, B327 FA460020F0012 Pro-Mark Services Inc. ACC $166,665
Repair inspector general office building 1000 on offutt AFB FA460019FA198 Sp-Jv, LLC ACC $73,122
Repair storage area building 73 FA460019FA197 Pro-Mark Services Inc. ACC $447,750
Install 55TH wing marquee sign FA460020F0112 Pro-Mark Services Inc. ACC $107,838
Repair petroleum OPS B431 FA460020F0040 Pro-Mark Services Inc. ACC $225,560
Show 15 more

Latest 25 of 136 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Pro-Mark Services Inc. $50,964,052 61%
2 Weldin Construction LLC $19,546,477 23%
3 Sp-Jv, LLC $7,789,661 9%
4 Gideon Contracting, LIMITED Liability Company $5,023,710 6%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $82,259,556 99%
2 Washington Headquarters Service $838,783 1%
3 Defense Logistics Agency $225,560 <1%

Obligations by fiscal year

Fiscal year Obligated
FY2025 -$101,461
FY2024 $374,705
FY2023 $1,352,093
FY2022 $1,455,651
FY2021 $1,629,312
FY2020 $25,139,912
FY2019 $16,938,789
FY2018 $17,742,298
FY2017 $17,252,779
FY2016 $1,546,395

Quick answers

What is the Air Force Construction MACC 2016-2021 contract vehicle?

Air Force Construction MACC 2016-2021 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Combat Command (Air Force), awarded on July 22, 2016.

Which companies hold Air Force Construction MACC 2016-2021?

4 companies hold Air Force Construction MACC 2016-2021's IDV awards, one each. The latest went to Weldin Construction LLC on July 22, 2016. The awardees whose task orders obligated the most are Pro-Mark Services Inc., Weldin Construction LLC and Sp-Jv, LLC.

How much has been spent through Air Force Construction MACC 2016-2021?

136 task orders have been placed under Air Force Construction MACC 2016-2021, obligating $83,323,899. Their combined current value, with exercised options, is $86,201,433.

What is the shared ceiling of Air Force Construction MACC 2016-2021?

Air Force Construction MACC 2016-2021's shared ceiling is $90,000,000; its task orders have used 93% of it.

Which agencies use Air Force Construction MACC 2016-2021 the most?

The departments whose task orders under Air Force Construction MACC 2016-2021 obligated the most are Air Force ($82,259,556), Washington Headquarters Service ($838,783) and Defense Logistics Agency ($225,560).

How much was obligated through Air Force Construction MACC 2016-2021 in fiscal year 2025?

Task orders under Air Force Construction MACC 2016-2021 obligated -$101,461 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle