Indefinite Delivery Contract FA812224D0001

Award Date 2/1/24
Last Date to Order 1/31/29
Ultimate Awardee
Not listed
Federal Contract Vehicle
Pricing Type
Firm Fixed Price
Legislative Mandate
Not listed
National Interest Action
None
Award Type
Single
Primary Consortia Member
Not listed
Similar IDVs
The federal contract IDV (FA812224D0004) was awarded by the Air Force Sustainment Center (AFSC), a defense agency, to the prime contractor BAE Systems Controls Inc., which operates as Commercial Aircraft. This single-award indefinite delivery contract has a ceiling value of $4,078,888 and a period of performance through May 19, 2029. The contract's primary purpose is to provide for the repair of the F108 Power Management Control (PMC) system, which is a critical component used in various Air...
This Indefinite Delivery Contract (IDC) was awarded by the U.S. Air Force Sustainment Center, a Defense agency, to R.S.L. Electronics LIMITED, an international manufacturing company based in Israel. The contract, valued at $5,990,820.00, is for the repair and upgrade of J85 Digital Temperature Control Amplifiers (DTCA) used on the T-38 Talon aircraft. The contract was awarded as a single-award IDC without any set-aside designation, indicating R.S.L. Electronics' competitive capabilities in...
The U.S. Department of the Air Force Materiel Command Air Force Sustainment Center has awarded an Indefinite Delivery Contract (IDC) to R.S.L. Electronics Limited, an international manufacturer based in Israel, for the repair and upgrade of digital temperature control amplifiers used on J85 turbojet engines installed in T-38 Talon training aircraft. The IDC has a ceiling value of $3,024,425 and a period of performance through August 2025. Under this contract, R.S.L. Electronics Limited serves as...
This is a single-award indefinite delivery contract (IDC) awarded by the U.S. Air Force Sustainment Center, a subcomponent of the Air Force Materiel Command, to Teledyne Defense Electronics, LLC, operating through its Teledyne MEC division as Teledyne Microwave Solutions. The $37.6 million IDC, valid through September 2028, is for the repair and provisioning of spare parts for the AN/ALQ-131, AN/ALQ-161, and AN/ALQ-172 electronic warfare systems used on various U.S. Air Force aircraft. Under...
This indefinite delivery contract (IDC) was awarded by the Air Force Sustainment Center, a unit of the Air Force Materiel Command, to BAE Systems Controls Inc., a subsidiary of the global defense contractor BAE Systems PLC. The contract has a ceiling value of $5,534,486 and an ultimate completion date of September 29, 2018. Under this IDC, BAE Systems Controls Inc. is providing repair and sustainment services for various electronic components and systems used on the B-52 bomber and KC-135 aerial...
The federal contract IDV award FA851915D0004 was issued by the U.S. Air Force Materiel Command, a defense agency, to BAE Systems Information & Electronic Systems Integration Inc., a subsidiary of the global defense contractor BAE Systems PLC. The contract is for the repair of the ALM-288 Countermeasure Tester, an electronic warfare system used on various military aircraft. Under this single-award IDV, the Air Force Materiel Command has issued multiple firm-fixed-price delivery orders to...
The U.S. Department of the Air Force Materiel Command Air Force Sustainment Center awarded an Indefinite Delivery Contract (IDC) to Aero Turbine, Inc., a small business manufacturer, to provide overhaul, repair, and maintenance services for the J85 turbojet engine used across various Air Force, Navy, and Marine Corps aircraft. The contract, valued at up to $128,757,513.55, has a period of performance from January 2017 to January 2022. Aero Turbine, the prime contractor, specializes in...
This Indefinite Delivery Contract was awarded by the Department of the Air Force Materiel Command Air Force Sustainment Center to Firstmark Aerospace Corporation, a subsidiary of Ontic Engineering And Manufacturing, Inc., for the repair of electronic control amplifiers. The contract is a single award with a potential value of $228,464 and period of performance from August 12, 2020 to September 15, 2023. Under the contract, Firstmark Aerospace has received multiple delivery orders for the...
The federal contract IDV award is held by BAE Systems Controls Inc., a subsidiary of the global defense, aerospace, and security company BAE Systems PLC. The primary purpose of the contract is for the repair of F108 Power Management Control (PMC) systems for the U.S. Air Force Sustainment Center, a defense agency. The contract is structured as a single-award Indefinite Delivery Contract (IDC) valued at $4,078,888 and runs through May 2029. Under this IDC, BAE Systems Controls Inc. has been...
The U.S. Air Force Sustainment Center awarded a $7.6 million Indefinite Delivery Contract (IDC) to BAE Systems Controls Inc., a subsidiary of the global defense contractor BAE Systems PLC, for the repair of KC-135 Stratotanker fuel management components. This single-award IDC, which has an ultimate completion date of March 2026, enables the Air Force to efficiently procure specialized aviation electronics repairs and maintenance services over a multi-year period. Under this IDC, the Air Force...
  • FA812224D0001
    Indefinite Delivery Contract
  • 2
    Federal Contract Awards

This indefinite delivery contract (FA812224D0001) was awarded by the Air Force Sustainment Center (AFSC), a defense agency, to BAE Systems Controls Inc., doing business as Commercial Aircraft. The $391,350 single-award contract is for the repair of the J85-21 T5 amplifier, a critical component used in the F-5 E/F aircraft engine. The contract has a performance period through January 2029.

The original solicitation was a pre-solicitation notice (ID 2ded8a75a50144b78740fd324abc92ac) for a firm fixed-price, one-year basic contract with four one-year option periods to procure repair services for the Digital Temperature Control Amplifier (DTCA) supporting the J85-21 engine. This sole-source acquisition was necessary due to the DTCA being a non-commercial item with only one approved source. The contract includes CLINs for teardown, testing, minor repairs (40%), and major repairs (60%) of the DTCA, with required delivery timeframes. This contract supports the maintenance and operational readiness of the U.S. Air Force's F-5 E/F aircraft fleet.

Generated 1/27/25, 1:12 PM