Master blanket purchase agreement (BPA) for general construction projects & repair services at niehs, RTP north carolina

Active Blanket Purchase Agreement Awarded Last action

Contract number
75N99023A00012
Awardee
Awarding agency
Task orders
16 $2,322,146 obligated

Award facts

Combined order value
$2,322,146 Current and potential, with all options
Last date to order 85% complete
IDV ceiling 15% used
$15,000,000.00
Maximum order
$350,000.00
Award type
Single award
Who can order
Only the awarding agency
Funding agency
Office of Logisitics and Acquisition Operations National Institutes of Health, Department of Health and Human Services
Set-aside
No set-aside
Pricing
Firm Fixed Price
Legislative mandates

Award details come from SAM.gov/FPDS.

About this IDV

The National Institutes of Health established a Blanket Purchase Agreement with Achuti LLC on May 18, 2023, with a $15 million ceiling for general construction projects and repair services at the NIEHS Research Triangle Park facility in North Carolina. Achuti is an SBA-certified 8(a) Program Participant and HUBZone firm, a minority-owned, Native American-owned small business headquartered in Raleigh, North Carolina.

Place of performance is Durham, North Carolina. The BPA extends through May 31, 2027.

Recent BPA calls reflect ongoing facility maintenance and infrastructure work. A $63,935 call issued September 3, 2025, covered concrete resurfacing of the Lakeview Drive Activity Area to address trip hazards at a frequently used outdoor recreation area, with completion by May 30, 2026. An $183,076 call issued August 22, 2025, addressed isolation valve replacement in Building 101 hydronic water systems to mitigate catastrophic flooding risk, due October 11, 2026. Earlier calls included a $185,000 cooling tower decking replacement for Building 105 (May 31, 2024), a $212,834 steam generator valve replacement in Building 101 Module B (March 4, 2024), a $152,500 heating and ventilation valve replacement in Building 101 basement (August 7, 2023), a $74,000 steam condensate line repair in Building 101 D Module (February 5, 2024), an $80,826 sewer drain repair at Building 102 (December 12, 2023), and a $47,800 ceiling grid repair at Building 105 (September 11, 2023). BPA calls have included both small-business set-asides and non-set-aside awards.

Task orders

Task order Ordering agency Obligated Awarded
Project C202243 RTP renovate F179 75N99026F00005 NIH Construction $17,033
Project C201287: RTP, bldg 101, e module repair to dewar storage and elevator lobby flooring 75N99026F00004 NIH Construction $268,256
Project C201772: RTP, building 101, d module repair to dewar storage and elevator lobby flooring 75N99026F00003 NIH Construction $287,246
Project C201773: building 110, exhaust fans 3, 4, and 5 replacement 75N99026F00002 NIH Construction $151,150
Project C201765 & C201770: bldg. 101 b module basement 200 degree HW and hthw valves replacement 75N99026F00001 NIH Construction $168,946
M33674803 - bldg. 101 f-MOD & bldg. Bldg.108 replace lab cold water backflow preventers 75N98026F00002 Office of Logisitics and Acquisition Operations (NIH) $37,000
C201411 - bldg 101, module f, chilled water pump replacement (p-f-CH-1A) 75N98026F00001 Office of Logisitics and Acquisition Operations (NIH) $325,545
C201110 award is essential to provide resurfacing of lakeview DR activity area to provide a safe area for outdoor… 75N99025F00002 NIH Construction $63,935
C201106 award is essential to avoid high risk of not being able to isolate building hydronic water systems via original… 75N99025F00001 NIH Construction $183,076
C116551- building 105 cooling tower 1 decking replacement project, devlin sawyer [24-003023] 75N99024F00005 NIH Construction $185,000
C116545 - project to replace deteriorated main chilled water isolation valves in building 101 f module basement… 75N99024F00004 NIH Construction $67,000
C116556-project to replace stop-check valves, associated spool pieces and piping above three steam generators in… 75N99024F00003 NIH Construction $212,834
C116548 - building 101 d module basement interstitial repair steam condensate line, RTP, marcos flores [24-001206] 75N99024F00002 NIH Construction $74,000
Location: RTP, north carolina bldg 102 RM S152 - sewer drain repair- sewer drain damaged requiring excavation and… 75N99024F00001 NIH Construction $80,826
C116190 - building 105 admin ceiling grid failure-repairs RTP campus 75N99023F00002 NIH Construction $47,800
C115712 - 101, b bsmnt, 200 HX valve replacement [23-004053] 75N99023F00001 NIH Construction $152,500
Show all 16

Transactions

Action Obligated Date
Other Administrative Action P00001 $0
Original award $0

Quick answers

Who was awarded contract 75N99023A00012?

75N99023A00012 was awarded to Achuti LLC by NIH Construction (National Institutes of Health) on May 18, 2023.

How much is contract 75N99023A00012 worth?

Orders under 75N99023A00012 have obligated $2,322,146. 75N99023A00012's own ceiling is $15,000,000. A single order can be worth up to $350,000.

How many orders have been placed under contract 75N99023A00012?

16 orders have been placed under 75N99023A00012, the latest on September 29, 2026.

Which agency awarded contract 75N99023A00012?

NIH Construction (National Institutes of Health) awarded 75N99023A00012, with funding from Office of Logisitics and Acquisition Operations (National Institutes of Health).

Who can order from contract 75N99023A00012?

75N99023A00012 is a single award blanket purchase agreement. Only the awarding agency can place orders on it.

On GovTribe

See this IDV's full record

  • Every order and transaction
  • The awardee's other awards and teaming partners
  • Similar IDVs and recompete opportunities
  • Ask GovTribe AI about this IDV