This project is designed to increase water management flexibilitymaking our water supply more resilient. This helps to prepare for and address the impacts of drought and water supply shortages
Active Project Grant Awarded
- Award ID
- R25AP00135
- Recipient
-
Fresno Irrigation District UEI KCMZJ7VGCUM3
- Awarding agency
-
Bureau of Reclamation
Department of the Interior
- Obligated
- $10,000,000
Award facts
- Assistance listing
- 15.514 Reclamation States Emergency Drought Relief
- Completion date 52% complete
- Funding
-
- $5,000,000.00 Federal
- $5,000,000.00 Non-federal
- Place of performance
- California, USA
Award details come from USAspending.gov.
About this award
The U.S. Department of the Interior Bureau of Reclamation awarded $10 million to Fresno Irrigation District on September 12, 2025, under the Reclamation States Emergency Drought Relief Program (CFDA 15.514) to construct water infrastructure that enhances drought resilience and water supply flexibility in California's Central Valley. The project deliverables include the construction of two recharge basins with up to two recharge cells at each site, levees less than 6 feet in height, two monitoring wells per site, inlet and outlet structures connecting to adjacent canals, flowmeters, and staff gauges to measure water levels and flow rates. These facilities are designed to enable controlled water delivery and drainage while allowing for groundwater recharge and improved water management operations.
The project is scheduled for completion by October 31, 2027, and will directly benefit the public by increasing water supply reliability and providing operational flexibility to address drought and water scarcity challenges. As a non-profit water management organization serving the Central Valley, Fresno Irrigation District brings specialized expertise in groundwater recharge and water infrastructure development to this merit-based, cost-shared funding initiative, which reflects the Drought Response Program's focus on building long-term resilience to drought through on-the-ground infrastructure improvements.
Description
- Activities
- The major components of the project include but are not limited to: 2 recharge basins including 2 recharge cells at each site and levees two monitor wells at each site an inlet structure and outlet structure on the adjacent canals flowmeters and staff gauge in each celldeliverable(s) expected outcome(s):the recipient shall construct 2 recharge basins, monitoring wells, inlet structures and outlet structures to the adjacent canals to allow water delivery and drainage from the basins, and flowmeters and staff gauges. Recharge basins will include up to two recharge cells at each site, and levees less than 6 feet tall.beneficiary: the public
Quick answers
Who received award R25AP00135?
R25AP00135 was awarded to Fresno Irrigation District by Bureau of Reclamation (Department of the Interior) on September 12, 2025.
How much is award R25AP00135 worth?
$10,000,000 has been obligated on R25AP00135: $5,000,000 in federal funding and $5,000,000 in non-federal funding.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award