The trabuco canyon water DISTRICT (DISTRICT) provides portable water, recycled water, and wastewater services to a total population of approximately 14,000
Active Project Grant Awarded
- Award ID
- R24AP00626
- Recipient
-
Trabuco Canyon Water District UEI J48MHV6ZL4V1
- Awarding agency
-
Bureau of Reclamation
Department of the Interior
- Obligated
- $1,155,168
Award facts
- Assistance listing
- 15.514 Reclamation States Emergency Drought Relief
- Completion date 65% complete
- Funding
-
- $577,584.00 Federal
- $577,584.00 Non-federal
- Place of performance
- California, USA
Award details come from USAspending.gov.
About this award
The Trabuco Canyon Water District was awarded a $1,155,168 project grant from the Bureau of Reclamation's Reclamation States Emergency Drought Relief program (CFDA 15.514) on December 4, 2024. The funding will support the Dove and Tick Creek Pump Station Improvements Drought Resiliency Project, which aims to upgrade the district's pump stations to increase capture of dry weather runoff and stormwater. The project will produce 200 acre-feet per year of new non-potable water, deliver water from alternative sources, reduce localized flooding, and improve ecosystem benefits to downstream native habitat. Key project components include modifying bypass structures, improving debris capture systems, installing new pumps and wet well components, and making electrical and programming upgrades at the pump stations. The project is expected to be completed by October 31, 2027.
Description
The DISTRICT manages a 66-mile water distribution system with approximately 4,118 service connections. The dove and tick creek pump station improvements drought resiliency project will upgrade the dove and tick creek pump stations to increase capture of both dry weather runoff and stormwater (wet weather flows) to produce 200 acre-feet per year of new non-potable water, delivering water from alternative sources, reducing localized flooding, and improving ecosystem benefits to downstream native habitat through reduced impacts of dry weather flows. The major components of the project include but are not limited to: modifying existing bypass structure to minimize debris buildupdebris capture system improvements installation of precast wet well top and lid at the tick creek pump stationinstallation of precast wet well top and lid at the tick creek pump stationinstallation of two pumps at the tick creek pump stationmodify discharge piping to facilitate new pumps and replace flowmeterelectrical upgrades, including a local disconnect at tick creek pump stationprogramming and system integration at the tick creek pump station new desilting basin at tick creek pump stationchannel, inlet, approach entry, and piping improvements at dove pump station
Quick answers
Who received award R24AP00626?
R24AP00626 was awarded to Trabuco Canyon Water District by Bureau of Reclamation (Department of the Interior) on December 4, 2024.
How much is award R24AP00626 worth?
$1,155,168 has been obligated on R24AP00626: $577,584 in federal funding and $577,584 in non-federal funding.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award