Phase 1 improvements will expand the KAY bailey hutchison desalination plant (KBH) capacity by 6,721 acre feet per year
Active Project Grant Awarded
- Award ID
- R24AP00471
- Recipient
-
El Paso Water Utilities Public Service Board UEI Z738SDJQDVH4
- Awarding agency
-
Bureau of Reclamation
Department of the Interior
- Obligated
- $10,500,000
Award facts
- Assistance listing
- 15.504 WaterSMART Water Recycling
- Completion date 86% complete
- Funding
-
- $2,625,000.00 Federal
- $7,875,000.00 Non-federal
- Place of performance
- Texas, USA
Award details come from USAspending.gov.
Description
The KBH plant expansion project will provide a new drought-proof water supply, enabling the recipient to conserve water from the regions aquifers. The new capacity will prevent heavy pumping that is sometimes required when the RIO grande project allocations are below normal and over time when population increases cause water demand to rise. Strategic well positioning for desalination serves as a buffer and help protect the fresh water supply in the hueco bolson aquifer, which is an essential source for both EL paso and fort bliss. This award enables the EL pasot to be more resilient and more easily tolerate lower allocations of RIO grande water during drought years.phase 1 part B of the KBH plant expansion includes several elements to support the addition of the sixth reverse osmosis treatment unit. These elements include:sand strainers the increased capacity of 6 MGD will cause existing sand strainers to reach their maximum flow capacity. An additional sand strainer of the same capacity as the existing ones will provide redundancy and alleviate the increase in particle loading.cartridge filter housings to meet increased feed flow, one additional cartridge filter housing will be required.chemical system evaluation the increased capacity resulting from the sixth RO treatment unit will require chemical systems to be evaluated and adjusted to continue to meet all necessary regulations and specifications.instrumentation and controls original installed equipment may require upgrades for compatibility with current market software necessary to support the addition of the six RO treatment unit.
Quick answers
Who received award R24AP00471?
R24AP00471 was awarded to El Paso Water Utilities Public Service Board by Bureau of Reclamation (Department of the Interior) on September 11, 2024.
How much is award R24AP00471 worth?
$10,500,000 has been obligated on R24AP00471: $2,625,000 in federal funding and $7,875,000 in non-federal funding.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award