Weber basin water conservancy district (wbwcd), located in box elder county, utah, will construct a new outlet delivery conduit through the earthen DAM, install a new delivery conduit, and establish a…

Ended Project Grant Awarded

Award ID
R23AP00186
Recipient
Awarding agency
Obligated
$7,601,286

Award facts

Completion date
Funding
  • $3,800,643.00 Federal
  • $3,800,643.00 Non-federal
Place of performance
Utah, USA

Award details come from USAspending.gov.

About this award

The Weber Basin Water Conservancy District (WBWCD) in Utah received a $7,601,286 project grant from the U.S. Department of the Interior, Bureau of Reclamation under the Reclamation States Emergency Drought Relief program (CFDA 15.514). Through this funding, WBWCD will construct a new outlet delivery conduit through an earthen dam, install a new water delivery conduit, and establish a 33.3 kW solar array at their Weber South Water Treatment Plant. These infrastructure upgrades will provide WBWCD access to an additional 50,000 acre-feet of water and generate 64,000 kWh of renewable power annually to offset the district's energy needs. The project was identified as a high priority in WBWCD's drought contingency plan, which was previously developed with assistance from a WaterSMART drought planning grant. The three-year project is scheduled for completion by June 30, 2026.

Description

Weber basin water conservancy district (wbwcd), located in box elder county, utah, will construct a new outlet delivery conduit through the earthen DAM, install a new delivery conduit, and establish a 33.3 KW solar array on their weber south water treatment plant. Extreme drought has affected wbwcd s ability to deliver water out of willard BAY through a 45-year-old siphon system to industrial and environmental water users. Through implementation of this project, wbwcd will provide access to an additional 50,000 acre-feet of water not previously available with the current system and will generate 64,000 KWH of power annually to offset wbwcd energy needs. The project was identified as a high priority in the district s drought contingency plan that was developed by wbwcd with assistance from a watersmart drought contingency planning grant.

Quick answers

Who received award R23AP00186?

R23AP00186 was awarded to Weber Basin Water Conservancy by Bureau of Reclamation (Department of the Interior) on June 22, 2023.

How much is award R23AP00186 worth?

$7,601,286 has been obligated on R23AP00186: $3,800,643 in federal funding and $3,800,643 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award