Project Grant R22AP00339

Award Date 5/12/22
Completion Date 12/31/24
Dollars Obligated $6.1M
Federal Grant Program
15.514
Assistance Type
Project Grant
Place of Performance
California, USA
Similar Awards
The Southern San Joaquin Municipal Utility District received a $4,598,053 Project Grant award from the U.S. Department of the Interior's Bureau of Reclamation under the Reclamation States Emergency Drought Relief program (CFDA 15.514). The funding will support the construction of the Caratan Groundwater Recharge Facility, which will convert 160 acres located in Delano, CA into recharge ponds to provide an additional average annual volume of approximately 5,560 acre-feet of water. The project's...
The Bureau of Reclamation awarded a $4,344,936 Project Grant under the Reclamation States Emergency Drought Relief program (CFDA 15.514) to the Southern San Joaquin Municipal Utility District (SSJMUD) on June 25, 2025. The grant will fund the construction of the Driver Road Pipeline project in California. Key components include installing PVC pipeline, connecting it to three existing turnouts, and restoring the site. This project will add conveyance capacity to deliver wet year surface water...
The Bureau of Reclamation awarded a $8,487,181 Project Grant under the Reclamation States Emergency Drought Relief program (CFDA 15.514) to the Shafter-Wasco Irrigation District (SWID) in Kern County, California. The grant will fund the construction of a 112-acre groundwater recharge facility that will store uncontrolled flood water from the Kern River and Central Valley Project for later beneficial use to offset water shortages during dry years. This project is expected to directly increase...
The Merced Irrigation District in Merced County, California will receive $3,289,755 under a Project Grant from the Department of the Interior Bureau of Reclamation's Reclamation States Emergency Drought Relief program (CFDA 15.514) to improve drought monitoring and water management models and equipment. Specifically, the District will enhance real-time operational modeling to track water supply conditions, install water measurement monitoring equipment to accurately track supply and snow/snow...
The San Bernardino Valley Municipal Water District received a $2,707,038 Project Grant from the U.S. Department of the Interior's Bureau of Reclamation under the Reclamation States Emergency Drought Relief program (CFDA 15.514) to implement the Cactus Basins Connector Pipeline Project. This project will connect the Cactus Basins to the State Water Project, allowing for up to an additional 6,904 acre-feet per year of groundwater recharge in the severely depleted groundwater basin. The project...
The San Bernardino Valley Municipal Water District was awarded a $2,007,600 Project Grant from the U.S. Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) Federal Grant Program (CFDA 15.507). The grant funds will be used to design improvements to convey local stormwater and imported water from the California Department of Water Resources State Water Project to a series of recharge basins in the City of San Bernardino,...
The Metropolitan Water District of Southern California (MWD) received a $32,942,618 Project Grant award from the U.S. Department of the Interior's Bureau of Reclamation under the Reclamation States Emergency Drought Relief program (CFDA 15.514). The grant will fund the construction of an intertie at the existing Foothill Pump Station along the Rialto Pipeline in East Highland, California. This project will enable MWD to provide water from the Colorado River Aqueduct and Diamond Valley Lake to...
The Bureau of Reclamation awarded Semitropic Water Storage District Irrigation Water System Financing Corporation a $3 million Project Grant under the Reclamation States Emergency Drought Relief program. The grant will fund construction of a subsurface recharge facility including an earthen reservoir, filtration system, metered connection to record water deliveries, buried infiltration gallery of perforated and solid pipelines, and a dedicated monitoring system. The project aims to increase...
The Stockton East Water District in California received a $2,046,465 federal Project Grant award from the U.S. Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) to construct a flow measurement flume and pipe 777 feet of an earthen canal. This project is expected to result in annual water savings of 10,865 acre-feet, which will be stored in the New Melones Reservoir to address water shortages...
This Project Grant award from the U.S. Department of the Interior's Bureau of Reclamation, under the Reclamation States Emergency Drought Relief program (CFDA 15.514), will provide $2,684,222 to the Cawelo Water District in Bakersfield, CA to enhance the district's drought resiliency and increase access to groundwater supplies. The key project components include the construction of a 33-acre-foot capacity reservoir, a 24-acre recharge facility, and a pipeline connecting the two facilities....

The Southern San Joaquin Municipal Utility District (SSJMUD) will receive $6,107,566 under a Project Grant from the Department of the Interior Bureau of Reclamation's Reclamation States Emergency Drought Relief program (CFDA 15.514) to improve water supply resilience. SSJMUD will enhance existing conveyance facilities, construct 75 acres of recharge ponds to increase groundwater recharge capacity by an average of 6,120 acre-feet annually, and connect a recovery well to its conveyance system. The project aims to bolster operational flexibility in Kern County, California by capturing excess surface water supplies in wet years for subsequent return in dry years, like the exceptional drought conditions currently being experienced. Supporting the regional drought contingency planning assisted by a prior Watersmart grant, this award funds infrastructure improvements to build long-term drought resiliency for SSJMUD and its service area. Performance is expected to conclude by December 31, 2024.

Generated 1/7/24, 11:28 AM