Not listed THE PROJECT PROPOSES THE FOLLOWING ACTIVITIES DESIGNED TO IMPROVE ACCESS TO, AND USE OF, BROADBAND SERVICES AMONG TRIBAL MEMBERS: ENGAGE IN OUTSIDE PLANT DESIGN, ENGINEERING, UNDERGROUND AND AERIAL CONSTRUCTION, SHELTER INSTALLATION, TOWER CONSTRUCTION, AND EQUIPMENT CONFIGURATION; THE PROJECT PROPOSES THE FOLLOWING ACTIVITIES DESIGNED TO IMPROVE ACCESS TO, AND USE OF, BROADBAND SERVICES AMONG TRIBAL MEMBERS: ENGAGE IN OUTSIDE PLANT DESIGN, ENGINEERING, UNDERGROUND AND AERIAL CONSTRUCTION, SHELTER INSTALLATION, TOWER CONSTRUCTION, AND EQUIPMENT CONFIGURATION; CONSTRUCT NEW MIDDLE MILE FIBER OPTIC TRANSPORT TO POINTS OF PRESENCE (POP) AT EL PASO, TX TO ENABLE CONNECTION TO THE TEXAS LONE STAR NETWORK; INSTALL FIXED WIRELESS FOR MOBILE APPLICATIONS TO BE USED; ADD 14 TOWERS TO THE 7 EXISTING TOWERS TO DEPLOY 2.5 GHZ SPECTRUM SERVICE, PROVIDE ACCESS TO CELLULAR SERVICES, AND INCREASE ACCESS TO FIRSTNET - A DEDICATED PUBLIC SAFETY NETWORK; BUILD A NEW DATA CENTER THAT IS FAULT-TOLERANT WITH REDUNDANT AND BACK-UP SYSTEMS. (CURRENTLY USING A TIER 2 UNFORTIFIED STRUCTURE. WILL CONSTRUCT A TIER 4 STRUCTURE TO WITHSTAND UNPREDICTABLE WEATHER (E.G., SEVERE THUNDERSTORMS)); INSTALL A NEW NETWORK OPERATIONS CENTER (NOC) WITHIN THE NEW DATA CENTER CONTAINING FUTURE-PROOFED TECHNOLOGIES; ESTABLISH A 400 MHZ RADIO SYSTEM. $0 8/4/26 Not listed THE PROJECT PROPOSES THE FOLLOWING ACTIVITIES DESIGNED TO IMPROVE ACCESS TO, AND USE OF, BROADBAND SERVICES AMONG TRIBAL MEMBERS: ENGAGE IN OUTSIDE PLANT DESIGN, ENGINEERING, UNDERGROUND AND AERIAL CONSTRUCTION, SHELTER INSTALLATION, TOWER CONSTRUCTION, AND EQUIPMENT CONFIGURATION; THE PROJECT PROPOSES THE FOLLOWING ACTIVITIES DESIGNED TO IMPROVE ACCESS TO, AND USE OF, BROADBAND SERVICES AMONG TRIBAL MEMBERS: ENGAGE IN OUTSIDE PLANT DESIGN, ENGINEERING, UNDERGROUND AND AERIAL CONSTRUCTION, SHELTER INSTALLATION, TOWER CONSTRUCTION, AND EQUIPMENT CONFIGURATION; CONSTRUCT NEW MIDDLE MILE FIBER OPTIC TRANSPORT TO POINTS OF PRESENCE (POP) AT EL PASO, TX TO ENABLE CONNECTION TO THE TEXAS LONE STAR NETWORK; INSTALL FIXED WIRELESS FOR MOBILE APPLICATIONS TO BE USED; ADD 14 TOWERS TO THE 7 EXISTING TOWERS TO DEPLOY 2.5 GHZ SPECTRUM SERVICE, PROVIDE ACCESS TO CELLULAR SERVICES, AND INCREASE ACCESS TO FIRSTNET - A DEDICATED PUBLIC SAFETY NETWORK; BUILD A NEW DATA CENTER THAT IS FAULT-TOLERANT WITH REDUNDANT AND BACK-UP SYSTEMS. (CURRENTLY USING A TIER 2 UNFORTIFIED STRUCTURE. WILL CONSTRUCT A TIER 4 STRUCTURE TO WITHSTAND UNPREDICTABLE WEATHER (E.G., SEVERE THUNDERSTORMS)); INSTALL A NEW NETWORK OPERATIONS CENTER (NOC) WITHIN THE NEW DATA CENTER CONTAINING FUTURE-PROOFED TECHNOLOGIES; ESTABLISH A 400 MHZ RADIO SYSTEM. $0 4/20/26 Not listed THE PROJECT PROPOSES THE FOLLOWING ACTIVITIES DESIGNED TO IMPROVE ACCESS TO, AND USE OF, BROADBAND SERVICES AMONG TRIBAL MEMBERS: ENGAGE IN OUTSIDE PLANT DESIGN, ENGINEERING, UNDERGROUND AND AERIAL CONSTRUCTION, SHELTER INSTALLATION, TOWER CONSTRUCTION, AND EQUIPMENT CONFIGURATION; THE PROJECT PROPOSES THE FOLLOWING ACTIVITIES DESIGNED TO IMPROVE ACCESS TO, AND USE OF, BROADBAND SERVICES AMONG TRIBAL MEMBERS: ENGAGE IN OUTSIDE PLANT DESIGN, ENGINEERING, UNDERGROUND AND AERIAL CONSTRUCTION, SHELTER INSTALLATION, TOWER CONSTRUCTION, AND EQUIPMENT CONFIGURATION; CONSTRUCT NEW MIDDLE MILE FIBER OPTIC TRANSPORT TO POINTS OF PRESENCE (POP) AT EL PASO, TX TO ENABLE CONNECTION TO THE TEXAS LONE STAR NETWORK; INSTALL FIXED WIRELESS FOR MOBILE APPLICATIONS TO BE USED; ADD 14 TOWERS TO THE 7 EXISTING TOWERS TO DEPLOY 2.5 GHZ SPECTRUM SERVICE, PROVIDE ACCESS TO CELLULAR SERVICES, AND INCREASE ACCESS TO FIRSTNET - A DEDICATED PUBLIC SAFETY NETWORK; BUILD A NEW DATA CENTER THAT IS FAULT-TOLERANT WITH REDUNDANT AND BACK-UP SYSTEMS. (CURRENTLY USING A TIER 2 UNFORTIFIED STRUCTURE. WILL CONSTRUCT A TIER 4 STRUCTURE TO WITHSTAND UNPREDICTABLE WEATHER (E.G., SEVERE THUNDERSTORMS)); INSTALL A NEW NETWORK OPERATIONS CENTER (NOC) WITHIN THE NEW DATA CENTER CONTAINING FUTURE-PROOFED TECHNOLOGIES; ESTABLISH A 400 MHZ RADIO SYSTEM. $0 4/20/26 Not listed THE PROJECT PROPOSES THE FOLLOWING ACTIVITIES DESIGNED TO IMPROVE ACCESS TO, AND USE OF, BROADBAND SERVICES AMONG TRIBAL MEMBERS: ENGAGE IN OUTSIDE PLANT DESIGN, ENGINEERING, UNDERGROUND AND AERIAL CONSTRUCTION, SHELTER INSTALLATION, TOWER CONSTRUCTION, AND EQUIPMENT CONFIGURATION; THE PROJECT PROPOSES THE FOLLOWING ACTIVITIES DESIGNED TO IMPROVE ACCESS TO, AND USE OF, BROADBAND SERVICES AMONG TRIBAL MEMBERS: ENGAGE IN OUTSIDE PLANT DESIGN, ENGINEERING, UNDERGROUND AND AERIAL CONSTRUCTION, SHELTER INSTALLATION, TOWER CONSTRUCTION, AND EQUIPMENT CONFIGURATION; CONSTRUCT NEW MIDDLE MILE FIBER OPTIC TRANSPORT TO POINTS OF PRESENCE (POP) AT EL PASO, TX TO ENABLE CONNECTION TO THE TEXAS LONE STAR NETWORK; INSTALL FIXED WIRELESS FOR MOBILE APPLICATIONS TO BE USED; ADD 14 TOWERS TO THE 7 EXISTING TOWERS TO DEPLOY 2.5 GHZ SPECTRUM SERVICE, PROVIDE ACCESS TO CELLULAR SERVICES, AND INCREASE ACCESS TO FIRSTNET - A DEDICATED PUBLIC SAFETY NETWORK; BUILD A NEW DATA CENTER THAT IS FAULT-TOLERANT WITH REDUNDANT AND BACK-UP SYSTEMS. (CURRENTLY USING A TIER 2 UNFORTIFIED STRUCTURE. WILL CONSTRUCT A TIER 4 STRUCTURE TO WITHSTAND UNPREDICTABLE WEATHER (E.G., SEVERE THUNDERSTORMS)); INSTALL A NEW NETWORK OPERATIONS CENTER (NOC) WITHIN THE NEW DATA CENTER CONTAINING FUTURE-PROOFED TECHNOLOGIES; ESTABLISH A 400 MHZ RADIO SYSTEM. $0 9/9/25 Not listed THE PROJECT PROPOSES THE FOLLOWING ACTIVITIES DESIGNED TO IMPROVE ACCESS TO, AND USE OF, BROADBAND SERVICES AMONG TRIBAL MEMBERS: ENGAGE IN OUTSIDE PLANT DESIGN, ENGINEERING, UNDERGROUND AND AERIAL CONSTRUCTION, SHELTER INSTALLATION, TOWER CONSTRUCTION, AND EQUIPMENT CONFIGURATION; THE PROJECT PROPOSES THE FOLLOWING ACTIVITIES DESIGNED TO IMPROVE ACCESS TO, AND USE OF, BROADBAND SERVICES AMONG TRIBAL MEMBERS: ENGAGE IN OUTSIDE PLANT DESIGN, ENGINEERING, UNDERGROUND AND AERIAL CONSTRUCTION, SHELTER INSTALLATION, TOWER CONSTRUCTION, AND EQUIPMENT CONFIGURATION; CONSTRUCT NEW MIDDLE MILE FIBER OPTIC TRANSPORT TO POINTS OF PRESENCE (POP) AT EL PASO, TX TO ENABLE CONNECTION TO THE TEXAS LONE STAR NETWORK; INSTALL FIXED WIRELESS FOR MOBILE APPLICATIONS TO BE USED; ADD 14 TOWERS TO THE 7 EXISTING TOWERS TO DEPLOY 2.5 GHZ SPECTRUM SERVICE, PROVIDE ACCESS TO CELLULAR SERVICES, AND INCREASE ACCESS TO FIRSTNET - A DEDICATED PUBLIC SAFETY NETWORK; BUILD A NEW DATA CENTER THAT IS FAULT-TOLERANT WITH REDUNDANT AND BACK-UP SYSTEMS. (CURRENTLY USING A TIER 2 UNFORTIFIED STRUCTURE. WILL CONSTRUCT A TIER 4 STRUCTURE TO WITHSTAND UNPREDICTABLE WEATHER (E.G., SEVERE THUNDERSTORMS)); INSTALL A NEW NETWORK OPERATIONS CENTER (NOC) WITHIN THE NEW DATA CENTER CONTAINING FUTURE-PROOFED TECHNOLOGIES; ESTABLISH A 400 MHZ RADIO SYSTEM. $0 9/9/25