THE ALBRIGHT POWER STATION DAM REMOVAL PROJECT ON THE CHEAT RIVER WILL IMPROVE WATERSHED CONNECTIVITY, WATER QUALITY, SENSITIVE SPECIES POPULATION HEALTH, AND FLOOD AND CLIMATE RESILIENCY FOR THE CHEAT RIVER AND ITS COMMUNITIES THROUGH THE REMOVAL OF AN OBSOLETE LOWHEAD DAM THE PROJECT WILL RECONNECT 75 MILES OF MAINSTEM HABITAT AND HUNDREDS OF MILES OF TRIBUTARY RIVERS AND STREAMS FOR SENSITIVE SPECIES, SUCH AS EASTERN HELLBENDER, FRESHWATER MUSSELS, WALLEYE, AND BROOK TROUT CURRENTLY, THE ALBRIGHT POWER STATION DAM BLOCKS NATIVE WALLEYE FROM RECOLONIZING THE CHEAT RIVER AFTER DECADES LONG POLLUTION CLEANUP EFFORTS HAVE RESULTED IN THE RESTORATION OF THEIR POPULATION IN CHEAT LAKE THE DAM ALSO BLOCKS MAINSTEM CONNECTION BETWEEN LOCAL BROOK TROUT STREAMS UPSTREAM AND DOWNSTREAM OF THE DAM EASTERN HELLBENDER HAVE BEEN DETECTED UPSTREAM AND DOWNSTREAM OF THE DAM, ISOLATING POPULATIONS FROM ONE ANOTHER FRIENDS OF THE CHEAT IS PURSUING REINTRODUCTION EFFORTS FOR NATIVE FRESHWATER MUSSELS IN THE CHEAT RIVER, OF WHICH THE DAM WOULD IMPEDE THEIR SUCCESS ADDITIONALLY, THE PROJECT WILL OPEN 6 MILES OF RIVER TO FLATWATER PADDLING OPPORTUNITIES, PREVIOUSLY INACCESSIBLE TO THE PUBLIC, AND WILL ESTABLISH A NEW PUBLIC RIVER ACCESS POINT THE PROJECT WILL BENEFIT THE LOCAL COMMUNITIES IN PRESTON AND TUCKER COUNTIES, OF WHICH THE CHEAT RIVER FLOWS THROUGH NEW OPPORTUNITIES FOR THESE COMMUNITIES INCLUDE INCREASED FISHING OPPORTUNITIES, ONE DAY OR MULTI DAY PADDLING TRIPS, AND NEW OPPORTUNITIES FOR SMALL BUSINESSES TO OFFER RECREATION BASED TOURISM SERVICES FOOD, LODGING, FISHING AND BOATING SUPPLIES, ETC ADDITIONALLY, REMOVING THE ALBRIGHT POWER STATION DAM WILL REDUCE THE RISK OF INFRASTRUCTURE FAILURE IN ALBRIGHT, WV, AS THE STRUCTURE IS OVER 70 YEARS OLD AND NO LONGER SERVES A PURPOSE SPECIFICALLY, THE GOALS OF THE PROJECT ARE TO COMPLETE DESIGN AND PERMITTING FOR THE REMOVAL OF THE ALBRIGHT POWER STATION DAM AND REMOVE THE DAM AND RESTORE THE ADJACENT RIVER REACH THE DELIVERABLES AND EXPECTED OUTCOMES CAN BE DESCRIBED AS THE FOLLOWING 1 AQUATIC ORGANISM PASSAGE BARRIER RECTIFIED, 75 MILES OF RIVER RECONNECTED, 1 25 MILES OF IN STREAM HABITAT RESTORED, AND 7 MILES OF RIVER OPENED FOR PUBLIC ACCESS FUNDS FOR THIS PROJECT 75,000 OF 585,700 TOTAL NEEDED TO COMPLETE ENGINEERING AND PROVIDE CONSTRUCTION OVERSIGHT WILL BE USED TO ADVANCE FINAL DESIGN OF THE PROJECT
Mod # | Description | Reason For Modification | Federal Obligation (Click to sort descending) | Date (Click to sort ascending) |
|---|---|---|---|---|
| Not listed | $75.0k | 8/12/22 |