Not listed DESCRIPTION:THIS COOPERATIVE AGREEMENT FUNDS THE CITY OF MIDVALE TO EMPLOY A PROJECT SITE COORDINATOR TO HELP ENSURE THE IMPLEMENTATION OF THE INSTITUTIONAL CONTROLS TO PROTECT THE INTEGRITY OF THE FINAL REMEDY FOR THE SHARON STEEL OU1 SUPERFUND SITE.ACTIVITIES:1) PRE-CONSTRUCTION: ASSIST DEVELOPERS IN PREPARATION AND SUBMITTAL OF ALL APPLICABLE DOCUMENTS (DSPS, MMPS) NEEDED PRIOR TO CONSTRUCTION. FACILITATE DOCUMENT REVIEW PROCESS BETWEEN EPA, UDEQ, MIDVALE, AND DEVELOPERS (ENSURE ALL PROPOSED CONSTRUCTION COMPLIES WITH SMP, ROD, MIDVALE CITY ICS). 2) CONSTRUCTION: SITE COORDINATOR WILL BE ON SITE ROUTINELY TO ENSURE THAT WORK IS BEING CONDUCTED ACCORDING TO APPROVED PLANS. OBSERVE AND ASSURE THAT THE CAP SYSTEM INSTALLATION, CONNECTION, AND REPAIR ACTIVITIES ARE CONDUCTED IN ACCORDANCE WITH INDUSTRY STANDARDS AND SMP REQUIREMENTS FOR SUBGRADE PREPARATION, LINER MATERIAL QUALITY CONTROL (QC), MATERIAL HANDLING; GEOSYNTHETICS DEPLOYMENT BY QUALIFIED INSTALLERS, OVERLAPS, AND FIELD TESTING INCLUDING BOTH NON-DESTRUCTIVE SEAM MONITORING AND DESTRUCTIVE SEAM TESTING. ASSURE THAT PROPER MATERIAL MANAGEMENT PRACTICES ARE BEING FOLLOWED WHEN DEALING WITH CONTAMINATED SOIL EXCAVATED FROM BENEATH THE CAP SYSTEM INCLUDING DUST AND EROSION CONTROL, TRANSPORT, AND TEMPORARY AND PERMANENT STORAGE. 3) POST-CONSTRUCTION: COORDINATE THE SUBMITTAL OF ALL REQUIRED DELIVERABLES AND REPORTS FROM THE DEVELOPER. COORDINATE AND ENSURE ALL SITE OANDM REQUIRED POST-CONSTRUCTION IS OCCURRING AND BEING DOCUMENTED. 4) PREPARE AND SUBMIT QUARTERLY PROGRESS REPORTS ON ALL TASKS COMPLETED. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE GOAL OF THE SMP IS TO IDENTIFY MINIMUM REQUIREMENTS, ACCEPTABLE TO UDEQ AND EPA, FOR PROPOSED DEVELOPMENT ACTIVITIES TO MAINTAIN THE PROTECTIVENESS OF THE REMEDY AND TO PROVIDE A FRAMEWORK FOR INCORPORATING THE ENGINEERING CONTROLS FOR THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT. DIRECT BENEFICIARIES OF THIS PROGRAM INCLUDE THE MIDVALE CITY AND THE RESIDENTS OF UTAH. A. ZIONS BANCORPORATION COMPLETION - JULY 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B B. 1ST PHASE OF CITY PARK (5 ACRES) - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B C. VACUUM SEWER STATION - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B D. GARDNER 250 UNIT MULTI-FAMILY HOUSING PROJECT - 2022 THROUGH 2024 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B B. GARDNER CONTINUATION OF 2000 ENTITLED MULTI-FAMILY UNITS, PARKS AND COMMERCIAL OFFICE - 2024 THROUGH 2030 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B E. WASATCH JORDAN BLUFFS PHASE III - FEBRUARY 2023 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B F. HOLMES HOMES PHASE I - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B G. HOLMES HOMES PHASE II - 2023 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B H. HOLMES HOMES PHASE III - 2024 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B $0 9/5/24 Not listed DESCRIPTION:THIS COOPERATIVE AGREEMENT FUNDS THE CITY OF MIDVALE TO EMPLOY A PROJECT SITE COORDINATOR TO HELP ENSURE THE IMPLEMENTATION OF THE INSTITUTIONAL CONTROLS TO PROTECT THE INTEGRITY OF THE FINAL REMEDY FOR THE SHARON STEEL OU1 SUPERFUND SITE.ACTIVITIES:1) PRE-CONSTRUCTION: ASSIST DEVELOPERS IN PREPARATION AND SUBMITTAL OF ALL APPLICABLE DOCUMENTS (DSPS, MMPS) NEEDED PRIOR TO CONSTRUCTION. FACILITATE DOCUMENT REVIEW PROCESS BETWEEN EPA, UDEQ, MIDVALE, AND DEVELOPERS (ENSURE ALL PROPOSED CONSTRUCTION COMPLIES WITH SMP, ROD, MIDVALE CITY ICS). 2) CONSTRUCTION: SITE COORDINATOR WILL BE ON SITE ROUTINELY TO ENSURE THAT WORK IS BEING CONDUCTED ACCORDING TO APPROVED PLANS. OBSERVE AND ASSURE THAT THE CAP SYSTEM INSTALLATION, CONNECTION, AND REPAIR ACTIVITIES ARE CONDUCTED IN ACCORDANCE WITH INDUSTRY STANDARDS AND SMP REQUIREMENTS FOR SUBGRADE PREPARATION, LINER MATERIAL QUALITY CONTROL (QC), MATERIAL HANDLING; GEOSYNTHETICS DEPLOYMENT BY QUALIFIED INSTALLERS, OVERLAPS, AND FIELD TESTING INCLUDING BOTH NON-DESTRUCTIVE SEAM MONITORING AND DESTRUCTIVE SEAM TESTING. ASSURE THAT PROPER MATERIAL MANAGEMENT PRACTICES ARE BEING FOLLOWED WHEN DEALING WITH CONTAMINATED SOIL EXCAVATED FROM BENEATH THE CAP SYSTEM INCLUDING DUST AND EROSION CONTROL, TRANSPORT, AND TEMPORARY AND PERMANENT STORAGE. 3) POST-CONSTRUCTION: COORDINATE THE SUBMITTAL OF ALL REQUIRED DELIVERABLES AND REPORTS FROM THE DEVELOPER. COORDINATE AND ENSURE ALL SITE OANDM REQUIRED POST-CONSTRUCTION IS OCCURRING AND BEING DOCUMENTED. 4) PREPARE AND SUBMIT QUARTERLY PROGRESS REPORTS ON ALL TASKS COMPLETED. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE GOAL OF THE SMP IS TO IDENTIFY MINIMUM REQUIREMENTS, ACCEPTABLE TO UDEQ AND EPA, FOR PROPOSED DEVELOPMENT ACTIVITIES TO MAINTAIN THE PROTECTIVENESS OF THE REMEDY AND TO PROVIDE A FRAMEWORK FOR INCORPORATING THE ENGINEERING CONTROLS FOR THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT. DIRECT BENEFICIARIES OF THIS PROGRAM INCLUDE THE MIDVALE CITY AND THE RESIDENTS OF UTAH. A. ZIONS BANCORPORATION COMPLETION - JULY 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B B. 1ST PHASE OF CITY PARK (5 ACRES) - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B C. VACUUM SEWER STATION - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B D. GARDNER 250 UNIT MULTI-FAMILY HOUSING PROJECT - 2022 THROUGH 2024 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B B. GARDNER CONTINUATION OF 2000 ENTITLED MULTI-FAMILY UNITS, PARKS AND COMMERCIAL OFFICE - 2024 THROUGH 2030 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B E. WASATCH JORDAN BLUFFS PHASE III - FEBRUARY 2023 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B F. HOLMES HOMES PHASE I - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B G. HOLMES HOMES PHASE II - 2023 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B H. HOLMES HOMES PHASE III - 2024 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B $0 1/24/24 Not listed DESCRIPTION:THIS COOPERATIVE AGREEMENT FUNDS THE CITY OF MIDVALE $851,425 TO EMPLOY A PROJECT SITE COORDINATOR TO HELP ENSURE THE IMPLEMENTATION OF THE INSTITUTIONAL CONTROLS TO PROTECT THE INTEGRITY OF THE FINAL REMEDY FOR THE SHARON STEEL OU1 SUPERFUND SITE.ACTIVITIES:1) PRE-CONSTRUCTION: ASSIST DEVELOPERS IN PREPARATION AND SUBMITTAL OF ALL APPLICABLE DOCUMENTS (DSPS, MMPS) NEEDED PRIOR TO CONSTRUCTION. FACILITATE DOCUMENT REVIEW PROCESS BETWEEN EPA, UDEQ, MIDVALE, AND DEVELOPERS (ENSURE ALL PROPOSED CONSTRUCTION COMPLIES WITH SMP, ROD, MIDVALE CITY ICS). 2) CONSTRUCTION: SITE COORDINATOR WILL BE ON SITE ROUTINELY TO ENSURE THAT WORK IS BEING CONDUCTED ACCORDING TO APPROVED PLANS. OBSERVE AND ASSURE THAT THE CAP SYSTEM INSTALLATION, CONNECTION, AND REPAIR ACTIVITIES ARE CONDUCTED IN ACCORDANCE WITH INDUSTRY STANDARDS AND SMP REQUIREMENTS FOR SUBGRADE PREPARATION, LINER MATERIAL QUALITY CONTROL (QC), MATERIAL HANDLING; GEOSYNTHETICS DEPLOYMENT BY QUALIFIED INSTALLERS, OVERLAPS, AND FIELD TESTING INCLUDING BOTH NON-DESTRUCTIVE SEAM MONITORING AND DESTRUCTIVE SEAM TESTING. ASSURE THAT PROPER MATERIAL MANAGEMENT PRACTICES ARE BEING FOLLOWED WHEN DEALING WITH CONTAMINATED SOIL EXCAVATED FROM BENEATH THE CAP SYSTEM INCLUDING DUST AND EROSION CONTROL, TRANSPORT, AND TEMPORARY AND PERMANENT STORAGE. 3) POST-CONSTRUCTION: COORDINATE THE SUBMITTAL OF ALL REQUIRED DELIVERABLES AND REPORTS FROM THE DEVELOPER. COORDINATE AND ENSURE ALL SITE OANDM REQUIRED POST-CONSTRUCTION IS OCCURRING AND BEING DOCUMENTED. 4) PREPARE AND SUBMIT QUARTERLY PROGRESS REPORTS ON ALL TASKS COMPLETED. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE GOAL OF THE SMP IS TO IDENTIFY MINIMUM REQUIREMENTS, ACCEPTABLE TO UDEQ AND EPA, FOR PROPOSED DEVELOPMENT ACTIVITIES TO MAINTAIN THE PROTECTIVENESS OF THE REMEDY AND TO PROVIDE A FRAMEWORK FOR INCORPORATING THE ENGINEERING CONTROLS FOR THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT. DIRECT BENEFICIARIES OF THIS PROGRAM INCLUDE THE MIDVALE CITY AND THE RESIDENTS OF UTAH. A. ZIONS BANCORPORATION COMPLETION - JULY 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B B. 1ST PHASE OF CITY PARK (5 ACRES) - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B C. VACUUM SEWER STATION - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B D. GARDNER 250 UNIT MULTI-FAMILY HOUSING PROJECT - 2022 THROUGH 2024 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B B. GARDNER CONTINUATION OF 2000 ENTITLED MULTI-FAMILY UNITS, PARKS AND COMMERCIAL OFFICE - 2024 THROUGH 2030 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B E. WASATCH JORDAN BLUFFS PHASE III - FEBRUARY 2023 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B F. HOLMES HOMES PHASE I - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B G. HOLMES HOMES PHASE II - 2023 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B H. HOLMES HOMES PHASE III - 2024 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B $145.8k 7/12/23 Not listed DESCRIPTION:THIS COOPERATIVE AGREEMENT FUNDS THE CITY OF MIDVALE $851,425 TO EMPLOY A PROJECT SITE COORDINATOR TO HELP ENSURE THE IMPLEMENTATION OF THE INSTITUTIONAL CONTROLS TO PROTECT THE INTEGRITY OF THE FINAL REMEDY FOR THE SHARON STEEL OU1 SUPERFUND SITE.ACTIVITIES:1) PRE-CONSTRUCTION: ASSIST DEVELOPERS IN PREPARATION AND SUBMITTAL OF ALL APPLICABLE DOCUMENTS (DSPS, MMPS) NEEDED PRIOR TO CONSTRUCTION. FACILITATE DOCUMENT REVIEW PROCESS BETWEEN EPA, UDEQ, MIDVALE, AND DEVELOPERS (ENSURE ALL PROPOSED CONSTRUCTION COMPLIES WITH SMP, ROD, MIDVALE CITY ICS). 2) CONSTRUCTION: SITE COORDINATOR WILL BE ON SITE ROUTINELY TO ENSURE THAT WORK IS BEING CONDUCTED ACCORDING TO APPROVED PLANS. OBSERVE AND ASSURE THAT THE CAP SYSTEM INSTALLATION, CONNECTION, AND REPAIR ACTIVITIES ARE CONDUCTED IN ACCORDANCE WITH INDUSTRY STANDARDS AND SMP REQUIREMENTS FOR SUBGRADE PREPARATION, LINER MATERIAL QUALITY CONTROL (QC), MATERIAL HANDLING; GEOSYNTHETICS DEPLOYMENT BY QUALIFIED INSTALLERS, OVERLAPS, AND FIELD TESTING INCLUDING BOTH NON-DESTRUCTIVE SEAM MONITORING AND DESTRUCTIVE SEAM TESTING. ASSURE THAT PROPER MATERIAL MANAGEMENT PRACTICES ARE BEING FOLLOWED WHEN DEALING WITH CONTAMINATED SOIL EXCAVATED FROM BENEATH THE CAP SYSTEM INCLUDING DUST AND EROSION CONTROL, TRANSPORT, AND TEMPORARY AND PERMANENT STORAGE. 3) POST-CONSTRUCTION: COORDINATE THE SUBMITTAL OF ALL REQUIRED DELIVERABLES AND REPORTS FROM THE DEVELOPER. COORDINATE AND ENSURE ALL SITE OANDM REQUIRED POST-CONSTRUCTION IS OCCURRING AND BEING DOCUMENTED. 4) PREPARE AND SUBMIT QUARTERLY PROGRESS REPORTS ON ALL TASKS COMPLETED. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE GOAL OF THE SMP IS TO IDENTIFY MINIMUM REQUIREMENTS, ACCEPTABLE TO UDEQ AND EPA, FOR PROPOSED DEVELOPMENT ACTIVITIES TO MAINTAIN THE PROTECTIVENESS OF THE REMEDY AND TO PROVIDE A FRAMEWORK FOR INCORPORATING THE ENGINEERING CONTROLS FOR THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT. DIRECT BENEFICIARIES OF THIS PROGRAM INCLUDE THE MIDVALE CITY AND THE RESIDENTS OF UTAH. A. ZIONS BANCORPORATION COMPLETION - JULY 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B B. 1ST PHASE OF CITY PARK (5 ACRES) - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B C. VACUUM SEWER STATION - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 2A, 2B, 2C, 3A, 3B D. GARDNER 250 UNIT MULTI-FAMILY HOUSING PROJECT - 2022 THROUGH 2024 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B B. GARDNER CONTINUATION OF 2000 ENTITLED MULTI-FAMILY UNITS, PARKS AND COMMERCIAL OFFICE - 2024 THROUGH 2030 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B E. WASATCH JORDAN BLUFFS PHASE III - FEBRUARY 2023 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B F. HOLMES HOMES PHASE I - AUGUST 2022 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B G. HOLMES HOMES PHASE II - 2023 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B H. HOLMES HOMES PHASE III - 2024 -REMAINING TASKS FOR PROJECT SITE COORDINATOR - 1A, 1B, 2A, 2B, 2C, 3A, 3B $232.5k 7/26/22 Not listed THIS COOPERATIVE AGREEMENT ALLOWS MIDVALE CITY TO EMPLOY A PROJECT SITE COORDINATOR TO HELP ENSURE THE IMPLEMENTATION OF THE INSTITUTIONAL CONTROLS TO PROTECT THE INTEGRITY OF THE FINAL REMEDY FOR THE SHARON STEEL OU1 SUPERFUND SITE. $200.0k 8/18/21