Project Grant 69A36525421210FSPDC
- Federal Grant Award Summary The Federal Railroad Administration (FRA) awarded the National Railroad Passenger Corporation (Amtrak) a Project Grant totaling $1.486 billion under the Federal-State Partnership for Intercity Passenger Rail program (CFDA 20.326) on April 1, 2025, with an anticipated completion date of October 31, 2031. The project deliverable is the replacement of an existing deteriorated bridge spanning the Connecticut River while maintaining the two-track configuration and existing...
- Federal Grant Award Summary The Federal Railroad Administration (FRA) awarded National Railroad Passenger Corporation (Amtrak) $324.5 million under the Federal-State Partnership for Intercity Passenger Rail Program (CFDA 20.326) on July 1, 2025, for the Sawtooth Replacement Project and Sawtooth Bridges Replacement Project. This award funds final design services and pre-construction support activities for railroad infrastructure improvements located in Kearny, New Jersey, with an ultimate...
- Federal Grant Award Summary The Federal Railroad Administration (FRA) awarded Amtrak (National Railroad Passenger Corporation) a $21.4 million Project Grant on April 1, 2025, under the Federal-State Partnership for Intercity Passenger Rail Program (CFDA 20.326) to support critical infrastructure rehabilitation of the East River Tunnels in New York. The grant, with a completion date of April 30, 2027, funds two primary components: (1) the design and construction of traction power cable relocation...
- This $1,577,314,971 federal Project Grant award, provided by the Federal Railroad Administration (FRA) through the Federal-State Partnership for Intercity Passenger Rail (CFDA 20.326) program, funds the East River Tunnel Rehabilitation (ERT) project for the National Railroad Passenger Corporation (Amtrak). The project aims to remediate damage from Superstorm Sandy and return lines 1 and 2 of the ERT to a state of good repair, ensuring the safe and efficient operation of passenger trains...
- This Project Grant award from the Federal Railroad Administration (FRA), under the Fiscal Year 2013 Hurricane Sandy Disaster Relief Grants to the National Railroad Passenger Corporation (CFDA 20.323) program, provides $21,000,000 to the National Railroad Passenger Corporation (Amtrak) to advance the Substation 41 reconstruction project. The funding will be used for preliminary design, engineering, and force account labor to support the final design of the project. Additionally, the grant will...
- This federal Project Grant award of $23,500,000.00, provided by the Federal Railroad Administration (FRA) under the Federal-State Partnership for Intercity Passenger Rail Program (CFDA 20.326), will fund planning, preliminary engineering, and environmental review activities to support the future final design and construction of a bridge replacement project. The key products and services to be delivered include replacing the current bridge structure, expanding capacity from two to four tracks,...
- This $11,000,000 Consolidated Rail Infrastructure and Safety Improvements (CRISI) program grant, awarded by the Federal Railroad Administration (CFDA 20.325), will fund the National Railroad Passenger Corporation (Amtrak) to conduct a programmatic National Environmental Policy Act (NEPA) corridor study and a Northeast Corridor (NEC) corridor-wide survey. The goal is to generate information needed to inform future fence installation at sites vulnerable to and at elevated risk for trespassing...
- Federal Grant Award Summary The Federal Railroad Administration (FRA) awarded National Railroad Passenger Corporation (Amtrak) a $4.7 million Project Grant under the Railroad Safety program (CFDA 20.301) on July 1, 2025, to enhance fire-life-safety infrastructure at Washington Union Station in Washington, DC. Amtrak will construct an emergency egress stairway and install a new fire sprinkler system within the North Hangar area of the Claytor Concourse, the primary boarding facility for all...
- Federal Cooperative Agreement Summary The Federal Railroad Administration (FRA) awarded the National Railroad Passenger Corporation (Amtrak) a Cooperative Agreement valued at $427.7 million under the National Railroad Passenger Corporation Grants program (CFDA 20.315), effective October 1, 2025, through January 31, 2029. This agreement provides federal funding to support Amtrak's continued safe and efficient national passenger rail operations across the National Network, encompassing both...
- Federal Grant Award Summary The Federal Railroad Administration (FRA) awarded $62 million to the National Railroad Passenger Corporation (Amtrak) under the Federal-State Partnership for Intercity Passenger Rail Program (CFDA 20.326) on June 1, 2025, for capital improvements at Chicago Union Station. The project, scheduled for completion by January 31, 2029, involves repurposing a mail platform for passenger use through construction activities that include installation of emergency egress routes,...
The National Railroad Passenger Corporation (Amtrak) received a $27 million Project Grant from the Federal Railroad Administration (FRA) under the Federal-State Partnership for Intercity Passenger Rail Program (CFDA 20.326) awarded on June 1, 2025, with a completion date of March 31, 2028. This grant funds capital projects and planning activities to identify and develop performance improvements on the Northeast Corridor (NEC) between Washington, DC and New Jersey in conjunction with infrastructure renewal and asset vulnerability mitigation efforts. The project delivers comprehensive planning and engineering services focused on increasing Amtrak train speeds and reducing trip times along the NEC corridor. Specifically, Amtrak will develop concepts and plans to address slow zones, design new high-speed zones on select segments, and analyze potential new track alignments in Maryland and Delaware to identify opportunities for further speed increases and trip time reductions. These deliverables support the FRA's objective to improve intercity passenger rail performance while addressing the state of good repair backlog through coordinated capital renewal initiatives.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $21.6m | 9/15/25 |