Project Grant 693JJ32640692
- The Federal Highway Administration awarded the City of Hot Springs $1.549 million on March 12, 2026, under the National Infrastructure Investments program (BUILD grants, CFDA 20.933) for multi-modal trail network planning. The recipient is the City of Hot Springs, Arkansas, operating through its City Treasurer office. Work performance occurs in Hot Springs, Arkansas, with an ultimate completion date of September 14, 2030. The BUILD program funds capital or planning investments in surface...
- This federal Formula Grant award of $235,000.00 was provided by the Federal Highway Administration (FHWA) under the Highway Planning and Construction Program (CFDA 20.205) to the Arkansas Department of Transportation (ArDOT). The funding will be used to construct 680 linear feet of a multi-use sidepath along Progress Avenue in Siloam Springs, Arkansas. This project, titled "Siloam Springs Progress Ave. Shared-Use Path (TAP-22) (S)", is intended to enhance pedestrian and bicycle...
- The Federal Highway Administration awarded the City of Springdale $1,434,740 on March 19, 2026, under the Safe Streets and Roads for All program (CFDA 20.939) to construct a shared-use path connection extending the Deans Trail Phase IIIB from the terminus of Deans Trail Phase IIIA at Don Tyson Parkway in Springdale, Arkansas to the existing shared-use path at Lake Fayetteville. Performance of the work takes place in Springdale, Arkansas, with an ultimate completion date of January 30, 2031....
- The Federal Highway Administration awarded the Arkansas Department of Transportation $6,954,432.57 under the Surface Transportation Block Grant Program (CFDA 20.287) on March 4, 2026, for a mill-and-overlay and resurfacing project on State Highway 7 in Eureka Springs and Berryville, Arkansas. The project encompasses mill-and-overlay work on the 0–3.12 mile segment and a two-inch overlay on the 3.12–12.17 mile segment. The period of performance runs through June 30, 2028. Work is performed in...
- <p>The Federal Highway Administration awarded the Arkansas Department of Transportation $310,000 on August 12, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to fund construction of a 10-foot-wide multi-use pathway along East Main Street in Cabot, Arkansas, extending from Lincoln Street to Adams Street. The project is scheduled for completion by September 30, 2028, and is performed in Arkansas.</p>
- The Federal Highway Administration awarded the Arkansas Department of Transportation $3,441,657.06 under the Surface Transportation Block Grant Program (CFDA 20.287) on December 19, 2025, for highway pavement and shoulder work on state routes in Benton County and Fayetteville, Arkansas. The project encompasses a 2-foot overlay and scrub seal treatment on linear miles 0.000 to 10.349, a 2-foot mill-and-overlay on linear miles 10.349 to 12.935, and 2-foot shoulder work on linear miles 0.0 to...
- <p>The Department of Transportation Federal Highway Administration awarded the Arkansas Department of Transportation $500,000 under the Surface Transportation Block Grant Program on March 3, 2026, to fund curb radius realignment, a 10-foot-wide multi-use trail, 6-foot and 8-foot sidewalks, and signal improvements along North Street in Fayetteville, Arkansas. The award obligates $500,000 and carries a period of performance through June 30, 2028. The work takes place in Arkansas.</p>
- <p>The Federal Highway Administration awarded the Arkansas Department of Transportation $172,449.10 on January 20, 2026, under the Surface Transportation Block Grant Program (CFDA 20.287) to construct 2,010 linear feet of 10-foot-wide concrete trail in Bentonville, Arkansas, with performance concluding June 30, 2028. The Bentonville McCollum Road Sidepath Phase 2 project delivers pedestrian and bicycle infrastructure through concrete trail construction. Work is performed in Arkansas.</p>
- The Federal Highway Administration awarded the City of Mena $2.747 million on April 7, 2026, under the National Infrastructure Investments (BUILD) program to develop comprehensive transportation planning and active transportation infrastructure in Mena, Arkansas. The award funds creation of an active transportation plan, a master street plan, an ADA transition plan, and a complete streets policy. The project will also produce design and construction documentation for a direct connection from...
- The Federal Highway Administration awarded the Arkansas Department of Transportation $393,750 on May 29, 2026, through the Surface Transportation Block Grant Program (CFDA 20.287) to design a trail connecting to the Central Arkansas Regional Greenway, specifically a segment along Maumelle Boulevard to White Oak Crossing in Maumelle. The award funds trail design work in Maumelle, Arkansas, with a period of performance through September 30, 2028. The $393,750 obligation supports the planning and...
The Federal Highway Administration awarded the City of Siloam Springs $470,990 on August 6, 2026, under the National Infrastructure Investments program (CFDA 20.933) to deliver complete streets improvements along E Main Street between Maxwell Street and Lincoln Street in Siloam Springs, Arkansas. The project will construct phased asphalt improvements, with individual sections receiving temporary binder course and reopening to traffic while work continues on adjacent segments, minimizing long-term business disruption. Following completion of all sections, a final asphalt surface course will be placed. Intersections will receive curbed bump-outs to shorten pedestrian crossing distances, with roll-over curbs accommodating larger vehicles. Bicycle side paths will provide multi-modal transportation connectivity along E Main Street and into the downtown area. Performance is scheduled through December 31, 2030. As a BUILD (formerly RAISE) grant for surface transportation capital investment with significant local or regional impact, this award is subject to reimbursement-basis accounting and audit under the Single Audit Act, with funds available for obligation through September 30, 2028, and expenditure through September 30, 2033 if properly obligated by that date.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $471.0k | 8/6/26 |