Project Grant 693JJ32640428
- The County of Douglas in Nevada was awarded a $125,000 Project Grant by the U.S. Department of Transportation Federal Highway Administration (CFDA 20.939 - Safe Streets and Roads for All) to create a Comprehensive Safety Action Plan. The plan will address safety concerns throughout the county, especially along U.S. Route 395, improve equity by addressing the needs of underserved communities, and enhance the overall quality of life for county residents. The award date is January 10, 2025, and the...
- Federal Project Grant Award Summary The Federal Highway Administration (FHWA) awarded $1,142,583.34 to the Nevada Department of Transportation (NDOT) on May 8, 2025, under the Highway Planning and Construction program (CFDA 20.205) to address emergency repairs on US Route 395 in Douglas County, Nevada. The project scope encompasses roadside infrastructure restoration and erosion control measures, including berming, repair and reconstruction of roadside slopes and ditches, box culvert...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded Nevada's Department of Transportation (NDOT) $2,105,263 under the Highway Planning and Construction program (CFDA 20.205) on September 2, 2025, for the construction phase of the SR28 Spooner Mobility Hub project in Douglas County. The project involves constructing a transit mobility hub on State Route 28 between the intersection of US Route 50 and the Douglas County/Carson City county line, encompassing the development...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded $17.3 million to the Nevada Department of Transportation on September 2, 2025, under the Highway Planning and Construction program (CFDA 20.205) for the construction of the SR28 Spooner Mobility Hub in Douglas County. This formula grant supports the development of a transit mobility hub facility that will include 250 parking spaces, an Agricultural Inspection Station (AIS) inspection facility, and pedestrian crossing...
- The Federal Highway Administration (FHWA) awarded $2,691,684.00 to the Nevada Department of Transportation (NDOT) on September 2, 2025, under the Highway Planning and Construction program (CFDA 20.205) to construct a transit mobility hub in Douglas County along State Route 28. The project will deliver a comprehensive multimodal transportation facility featuring 250 parking spaces, an Agricultural Inspection Station (AIS) inspection facility, and pedestrian crossing infrastructure. The...
- Federal Grant Award Summary The Federal Highway Administration awarded a Project Grant of $611,920 to the Nevada Department of Transportation (NDOT) on May 8, 2025, under the Highway Planning and Construction program (CFDA 20.205) to address infrastructure damage in Lincoln County. The project, designated SR322 (State Route 322) from Linear Mile 15.000 to 18.000, was initiated as an emergency repair response to an atmospheric river event in 2023. NDOT will deliver comprehensive roadway...
- Federal Project Grant Award Summary The Federal Highway Administration (FHWA) awarded $1.578 million to the Nevada Department of Transportation (NDOT) on July 7, 2025, under the Highway Planning and Construction program (CFDA 20.205) to address infrastructure damage in Washoe County resulting from a 2023 atmospheric river event. The project encompasses emergency repairs and reconstruction activities on US Route 395 between mileposts 32.000 and 38.400, including culvert cleaning, repair and...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded the Department of Transportation Nevada $177.8 million under the Highway Planning and Construction program (CFDA 20.205) on August 15, 2025, for highway capacity and rehabilitation improvements on US Route 395 in Washoe County. The project, with an ultimate completion date of December 31, 2030, encompasses approximately 2.8 miles of roadway from Golden Valley Road Interchange to Stead Boulevard Interchange....
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded the Nevada Department of Transportation (NDOT) $11.58 million under the Highway Planning and Construction program (CFDA 20.205) for construction of the SR28 Spooner Mobility Hub in Douglas County, Nevada. The award was obligated on September 2, 2025, with a project completion date of December 31, 2030. This formula grant funds the construction phase of a multimodal transit facility designed to support regional...
- Federal Grant Award Summary The Federal Highway Administration (FHWA) awarded a Project Grant totaling $216,034.91 to the Nevada Department of Transportation (NDOT) on July 7, 2025, under the Highway Planning and Construction program (CFDA 20.205). This award funds emergency repairs to State Route 342 in Storey County, Nevada, addressing damage from a 2023 atmospheric river event. The project encompasses roadside ditch and slope repair/reconstruction, repair of paved roadside ditches,...
Federal Grant Award Summary County of Douglas received $850,000 in project grant funding from the Federal Highway Administration (FHWA) under the National Infrastructure Investments program (CFDA 20.933) on April 7, 2026, for planning, design, engineering, community engagement, and environmental analysis activities. The project encompasses planning and design services for approximately 3,000 feet of new collector road within existing county right-of-way to realign Waterloo Lane and establish a new connection to US 395 at Stodick Parkway in Minden, Nevada. Deliverables include comprehensive design plans for a new roundabout at State Route 756, a new intersection at US 395, and a feasibility study evaluating traffic control measures such as a cul-de-sac on the current Waterloo Lane near Lampe Park. The award supports pre-construction activities with an anticipated completion date of October 31, 2030. As a competitive BUILD (formerly RAISE) grant, this funding prioritizes surface transportation infrastructure investments with significant local or regional impact, emphasizing safety, mobility, and community connectivity improvements through multimodal corridor planning and design activities.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $850.0k | 4/7/26 |