This project will fund the planning design and environmental permitting for on terminal rail track replacement realignment and load capacity improvements

Active Project Grant Awarded

Award ID
693JF72440069
Recipient
Awarding agency
Obligated
$10,000,000

Award facts

Assistance listing
20.933 National Infrastructure Investments
Completion date 30% complete
Funding
  • $5,000,000.00 Federal
  • $5,000,000.00 Non-federal
Place of performance
San Diego, CA 92101, USA

Award details come from USAspending.gov.

Description

The project will also advance the planning of seismic upgrades concreate resurfacing water and utility reconfiguration and upgrades as well as front gate perimeter fence and operations center reconfiguration. Activities to be performed the project includes one component with the following elements. Preliminary site investigation. Topographic survey. Conduct a detailed topographic survey of the entire project area including all relevant surface features. Utilize global positioning system GPS total station and light detection and ranging lidar technology to gather precise horizontal and vertical measurements. Map existing structures rail lines utilities above and below ground pavements fencing drainage features and other pertinent site elements. Establish horizontal and vertical control points tied to local and state coordinate systems. Verify and map underground utility locations. Prepare a comprehensive topographic map with contour intervals suitable for design purposes E G 1 foot intervals. Deliver survey data in digital formats compatible with computer aided design CAD and geographic information system GIS software for integration into design models. Deliverables. Comprehensive topographic maps and digital files compatible with CAD and GIS software. Survey reports documenting methodologies findings and control network. Rail track realignment design. Site evaluation and survey. Utilize data from the topographic survey to assess existing rail track conditions and site constraints. Evaluate the curvature and alignment of existing tracks identifying operational limitations and potential improvements. Load testing on rail. Perform load tests on existing rail infrastructure to determine current load-bearing capacities and identify weaknesses. Analyze lateral and vertical displacements under simulated operational loads. Incorporate load testing results into the design of the new track alignment and structural enhancements. Design for track realignment. Develop design alternatives that adjust track geometry to meet modern industry standards. Select the optimal design based on operational efficiency safety and cost considerations. Prepare detailed engineering drawings specifications, and construction documents. Deliverables. Reports detailing rail load testing procedures, results, calculations and recommendations. Plans specifications and estimates PS and E at construction documents CD 30 percent 60 percent and 90 percent engineering designs for rail realignment. Geotechnical exploration and utility assessment. Geotechnical borings and soil sampling. Perform subsurface explorations, including drilling borings and collecting soil samples at strategic locations. Prepare detailed boring logs documenting soil strata classifications and groundwater conditions. Conduct laboratory testing to determine soil properties such as shear strength compressibility and permeability. Potholing for utility identification. Execute potholing at key locations to expose and verify underground utilities positions and depths. Document and map all findings updating utility records as necessary. Coordinate with utility owners to minimize service disruptions during exploration. Groundwater investigation. Monitor groundwater levels during drilling operations. Sample groundwater for potential contaminants if required. Provide recommendations for groundwater management during construction activities. Deliverables.boring logs, soil analysis results, groundwater data, and geotechnical recommendations. Hazardous material hazmat and environmental soil testing. Task 4 1 hazardous material soil testing. Collect soil samples from various depths and locations for environmental analysis. Test for contaminants such as heavy metals petroleum hydrocarbons volatile organic compounds vocs and other hazardous substances. Identify any areas requiring remediation or special handling during construction. Soil management plan. Develop a soil management plan outlining procedures for handling storing, transporting and disposing of contaminated soils. Include strategies for minimizing dust erosion and runoff to protect nearby communities and environments. Coordinate with regulatory agencies to ensure compliance with all environmental regulations. Deliverables. Hazardous material testing reports and a soil management plan. Seismic upgrades and infrastructure improvements. Seismic risk analysis. Analyze seismic hazards specific to the project site including fault lines and liquefaction potential. Assess the structural integrity of existing seawalls wharves and support piles under seismic loading. Seismic design solutions. Design seismic reinforcements such as upgraded support piles and integrated seawall enhancements. Incorporate deep soil mixing DSM techniques where feasible to mitigate liquefaction risks. Ensure designs comply with current seismic codes and standards. Utility and deck reconfiguration. Design upgrades for utility lines including water electrical, and communication systems. Plan for the resurfacing of concrete decks to support increased load capacities and future infrastructure needs. Deliverables. PS and E construction documents CD 30 percent 60 percent and 90 percent design for infrastructure improvements. Front gate perimeter fence and operations center reconfiguration. Traffic and security assessment. Analyze current traffic patterns for vehicles entering and exiting the terminal. Evaluate existing security measures and identify vulnerabilities. Design solutions for main gate and operations center. Design expanded gate facilities with additional lanes to improve traffic flow and accommodate oversized cargo. Incorporate advanced security technologies such as automated access controls surveillance systems and license plate recognition. Design an integrated operations center to centralize security traffic management and compliance monitoring. Deliverables. PS and E at construction documents CD 30 percent 60 percent and 90 percent engineering designs for improvements. Environmental compliance and permitting ceqa nepa. Environmental impact analysis. Prepare environmental documents in compliance with california environmental quality act ceqa and national environmental policy act nepa nepa agency not identified. Assess potential impacts on air quality water resources biological habitats noise levels and cultural resources. Develop mitigation measures to address identified impacts. Permitting support. Identify all required permits from local state and federal agencies. Prepare and submit permit applications coordinating with agencies throughout the review process. Deliverables. Ceqa and nepa environmental impact statement EIS reports. Permit applications for all applicable state local and federal agencies. Deliverables expected outcomes there are no performance measure to raise grants. Intended beneficiary SAN diego unified port district. Subrecipient activities none.

Quick answers

Who received award 693JF72440069?

693JF72440069 was awarded to San Diego Unified Port District by Maritime Administration (Department of Transportation) on January 16, 2025.

How much is award 693JF72440069 worth?

$10,000,000 has been obligated on 693JF72440069: $5,000,000 in federal funding and $5,000,000 in non-federal funding.