This project will fund the final design and construction of improvements that will reinstate on dock and near dock rail connections to the port of bellinghams shipping terminal
Active Project Grant Awarded
- Award ID
- 693JF72440063
- Recipient
-
Port Of Bellingham UEI NRYGMRVUBJA6
- Awarding agency
-
Maritime Administration
Department of Transportation
- Obligated
- $17,931,000
Award facts
- Assistance listing
- 20.819 Ballast Water Treatment Technologies
- Completion date 34% complete
- Place of performance
- Bellingham, WA 98225, USA
Award details come from USAspending.gov.
Description
The project will also connect the terminal to the bnsf mainline to provide direct rail service in and out of the port. Activities to be performed the project consists of the following three components. Component 1 engineering design and permitting. Engineering and design from preliminary through final field studies surveys and investigations alternatives analysis including site layout evaluation local permits city state. Property agreements IE washington department of natural resources. Contract bid document advertisement evaluation and award. Component 2 construction project management. Purchase rail construction materials aggregates ties rails spikes etc used or new under the advice of consultants and contractors. Mobilization demolition site preparation subgrade structural improvement utility relocation and/or installation install subballast bottom ballast and top ballast. Unload and stockpile rail and ties. Weld rail LTD continuous welded rail CWR to grade. Grading materials management distribute ties bed crossties set CWR on ties and clip surface line dress track. Stress and reclip track. Furnish and install bumpers. Asphalt pavement and or concrete. Drivable rail crossing surfaces fencing relocation of shipping terminal access guard shack replacement gate relocation. Develop record drawings component 3 construction management project management engineering support during construction. Inspection testing resolve punch list items project closeout. Deliverables expected outcomes from schedule G page 11 of the grant agreement. Performance measure cargo. Unit reported economic competitiveness and opportunity. Total gross tons of freight moved per year. Gross tons are defined as freight cargo minus tare weight of the rail cars. When applicable report the gross tonnage disaggregated by type of intermodal transport transload to truck or maritime facility. Performance measure reportable events. Unit reported total number of reportable events per year. A reportable event is defined as a safety or security event occurring in the project study area such as railyard facility that results in one or more of the following conditions. A fatality confirmed within 30 days of the event. An injury requiring immediate medical attention away from the scene for one or more person. Property damage equal to or exceeding 25000. Collisions involving vehicles or derailments of locomotives. An evacuation for the life safety reasons. Intended beneficiary port of bellingham subrecipient activities none.
Quick answers
Who received award 693JF72440063?
693JF72440063 was awarded to Port Of Bellingham by Maritime Administration (Department of Transportation) on September 25, 2025.
How much is award 693JF72440063 worth?
$17,931,000 has been obligated on 693JF72440063.