The project consists of four construction elements at the port of muskogee on the mcclellan kerr arkansas river navigation system 1 reconstruction of the main dock at oakley terminal 2 construction of…
Active Project Grant Awarded
- Award ID
- 693JF72344035
- Recipient
-
Muskogee City-County Port Authority UEI J499GQK5CDY5
- Awarding agency
-
Maritime Administration
Department of Transportation
- Obligated
- $29,948,222
Award facts
- Assistance listing
- 20.823 Port Infrastructure Development Program
- Completion date 22% complete
- Funding
-
- $23,955,557.00 Federal
- $5,992,665.00 Non-federal
- Place of performance
- Fort Gibson, OK 74434, USA
Award details come from USAspending.gov.
About this award
The Department of Transportation Maritime Administration awarded Muskogee City-County Port Authority, doing business as Port of Muskogee, a $29.948222 million Project Grant on March 12, 2026, under the Port Infrastructure Development Program (CFDA 20.823). Dollars obligated match the total, and the ultimate completion date is June 30, 2029. Place of performance is Fort Gibson, OK 74434.
The award funds four construction elements at the Port of Muskogee on the McClellan-Kerr Arkansas River Navigation System: reconstruction of the main dock at Oakley Terminal, construction of a new heavy lift dock, reconstruction of on-dock rail, and construction of a new flexible use warehouse. Stated quantities include approximately 1,300 linear feet of rail and ties, approximately 7,800 square feet of heavy duty concrete pavement, approximately 360 linear feet of new bulkhead wall, approximately 200 linear feet of safety rail, and approximately 2,000 square yards of concrete deck. Wharf work also includes bank stabilization with riprap and geotextile fabric, a fender system, and bollards, ladders, gangway, and stairs.
Supporting components include preliminary engineering to the 60 percent design level, final design through PS&E for the dock component, construction management and inspection, and environmental analysis. Grant administration covers independent contractor support for MARAD compliance, reporting, and reimbursements. Ancillary services cover single audit, accounting, and legal support for contract review.
Description
The project consists of four construction elements at the port of muskogee on the mcclellan kerr arkansas river navigation system 1 reconstruction of the main dock at oakley terminal 2 construction of a new heavy lift dock 3 reconstruction of on dock rail and 4 construction of a new flexible use warehouse. Activities to be performed the scope of work of the project consists of the following components component 1 engineering and construction management services element 1 preliminary engineering to the 60 percent design level element 2 final design through PS and E for component 4 element 3 construction management and inspection element 4 environmental analysis component 2 grant program administration independent contractor administration support services for grant management oversight including marad compliance and communication project reporting and reimbursements. Component 3 legal accounting and audit services ancillary contracted services for single audit and legal services as needed for contract review etc component 4 construction element 1 dockside rail main cargo wharf replacement demolition of existing railroad existing railroad ballast pavement existing 24 steel stormwater pipe existing bulkhead support and pile grain conveyor PIT and equipment existing stairs and gangway existing concrete associated with the existing dock existing riprap embankment associated with the existing rail site improvements installation of approximately 1300 linear feet LF of rail and ties with corresponding railroad ballast approximately 7800 square feet SF of 8 5 heavy duty concrete pavement approximately 70 LF of 24 steel stormwater pipe wharf improvements approximately 360 LF of new bulkhead wall bank stabilization utilizing riprap and geotextile fabric approximately 200 LF of safety rail fender system approximately 2000 square yards SY of concrete deck bollards ladders gangway and stairs 12 curb utilities 24 steel stormwater pipe and electrical erosion and sediment control approximately 2100 LF of silt fence seeded sodded areas disturbed approximately 400 LF of turbidity curtain element 2 new heavy lift dock demolition of approximately 22500 SF of existing concrete pavement approximately 2000 SF of existing building structure port equipment grain PIT and conveyor approximately 650 LF of overhead electrical lines and six overhead electric poles approximately 130 LF of existing water line cut cap approximately 50 LF of existing 12 corrugate plastic pipe existing storm structure approximately 700 cubic yards CY of existing embankment approximately 90 LF of existing gas line cut cap site improvements approximately 3550 SY of heavy lift dock approximately 14225 SF of 8 5 heavy duty concrete pavement approximately 80 LF of safety rail fender system bollards 12 curb utilities route approximately 650 LF of electrical line underground relocate one electrical transformer erosion and sediment control approximately 550 LF turbidity curtain approximately 2100 tons of RIP RAP for bank stabilization seeded sodded area element 3 new warehouse demolition of approximately 92900 SF of existing gravel approximately 33900 SF of clear and grub approximately 2700 SF of existing building and foundation approximately 20000 SF of existing transit warehouse and foundation site improvements construction of a new 36000 SF warehouse approximately 86800 SF of 8 5 heavy duty concrete pavement approximately 2800 SF of 5 5 light duty concrete pavement approximately 265 LF of concrete curb and gutter approximately 70 SY of concrete sidewalk utilities approximately 200 LF of sanitary sewer pipe and appurtenances approximately 210 LF of water pipe and appurtenances approximately 225 LF of gas pipe and appurtenances approximately 75 LF of underground electric line and appurtenances approximately 50 LF of underground telecom line and appurtenances. Erosion and sediment control approximately 830 LF of silt fence seeded sodded area element 4 project quality assurance quality control and safety program QA QC engineer will follow strict 6 step quality process for all elements of project written and qualified safety and emergency action contact plans and placarding posting will be a contract requirement of all contractors and subcontractors performing project work. Periodic compliance checks will be made during the construction process. Deliverables expected outcomes from schedule G of the grant agreement page 13 measure gross tons. Category and description economic competitiveness the movement of gross tonnage of freight in the area defined by the project study area. Secondary variable types of freight types of intermodal transport. Measurement frequency quarterly. Measure vessel calls. Category and description economic competitiveness vessel type and or freight capacity of the vessel calling to the area defined in the project study area. Measurement frequency quarterly. Intended beneficiary muskogee city county port authority. Subrecipient activities none.
Quick answers
Who received award 693JF72344035?
693JF72344035 was awarded to Muskogee City-County Port Authority by Maritime Administration (Department of Transportation) on March 12, 2026.
How much is award 693JF72344035 worth?
$29,948,222 has been obligated on 693JF72344035: $23,955,557 in federal funding and $5,992,665 in non-federal funding.