The project will fund two components at helena harbor 1 the addition of a water tower to support industrial uses and firefighting systems in the port which will be built to withstand the seismic…

Active Project Grant Awarded

Award ID
693JF72344025
Recipient
Awarding agency
Obligated
$7,125,169

Award facts

Assistance listing
20.823 Port Infrastructure Development Program
Completion date 13% complete
Funding
  • $6,412,652.00 Federal
  • $712,517.00 Non-federal
Place of performance
West Helena, Helena-West Helena, AR, USA

Award details come from USAspending.gov.

About this award

The Department of Transportation Maritime Administration awarded Helena-West Helena-Philips County Port Authority, doing business as Helena Harbor, $7.125169 million in obligated funding under Project Grant 693JF72344025 on May 4, 2026. The award falls under the Port Infrastructure Development Program (CFDA 20.823), which makes discretionary grants to improve port facilities at coastal seaports, inland river ports, and Great Lakes ports.

The award funds two components at Helena Harbor. The first is a water tower of approximately 500,000 gallons, a painted steel multi-column elevated tank with a tank foundation, mixing and control systems, and a chlorinator, built to withstand seismic impacts in the New Madrid Fault area. It supports industrial uses and firefighting systems in the port. The second is an approximately 1.1 mile rail spur with new M10 steel ties and base fill, extending to the Helm Fertilizer Terminal and connecting parcels on the east side of the port's industrial park to the North American rail network. Project activities include design and engineering, testing, construction management, and project grant management.

Expected outcomes are measured quarterly and include total vessel calls per year, container volume in TEUs moved by vessel, and gross tonnage of rail freight within the project study area. Assistance is provided on a reimbursable basis. Place of performance is West Helena, Helena-West Helena, Arkansas, and the ultimate completion date is August 30, 2030. The source identifies no sub-recipients.

Description

The project will fund two components at helena harbor 1 the addition of a water tower to support industrial uses and firefighting systems in the port which will be built to withstand the seismic impacts of an earthquake in the new madrid fault area and 2 the construction of a rail spur connecting parcels on the east side of the ports industrial park to the north american rail network. Activities to be performed the project includes engineering and construction management installation of a new water tower and the construction of a rail spur. The project will include the following components component 1 design and engineering testing construction management and project grant management component 2 water tower construction construction of a new approximately 500000 gallon painted steel multi column elevated water tank with a tank foundation mixing and control systems and a chlorinator. Component 3 rail extension construction construction of an approximately 1 1 mile 115 rail spur including new M10 steel ties and base fill extending to the helm fertilizer terminal which will connect the port to the north american rail network. Deliverables expected outcomes from schedule G page 9 of the grant agreement measure vessel calls. Category and description economic competitiveness total vessel calls per year. Measures the number of vessels calling to the project study area. Must be reported in total and disaggregated by any of the following where applicable vessel type EG container bulk RO RO LNG freight capacity vessel length or other. Measurement frequency quarterly. Measure cargo volume teus. Category and description economic competitiveness and opportunity the movement of containers in teus moved by vessel per year in the area defined by the project study area. Measurement frequency quarterly. Measure cargo volume rail. Category and description economic competitiveness the movement of gross tonnage of freight in the area defined by the project study area. Gross tons are defined as freight cargo minus tare weight of the rail cars. Measurement frequency quarterly. Intended beneficiary helena west helena phillips county port authority. Subrecipient activities none.

Quick answers

Who received award 693JF72344025?

693JF72344025 was awarded to Helena-West Helena-Philips County Port Authorty by Maritime Administration (Department of Transportation) on May 4, 2026.

How much is award 693JF72344025 worth?

$7,125,169 has been obligated on 693JF72344025: $6,412,652 in federal funding and $712,517 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award