Activities to be performed the project funds the redevelopment of a former power plant site into a new port terminal at the port of green BAY
Active Project Grant Awarded
- Award ID
- 693JF72344011
- Recipient
-
County Of Brown UEI DDNMD7YRLX58
- Awarding agency
-
Maritime Administration
Department of Transportation
- Obligated
- $54,669,765
Award facts
- Assistance listing
- 20.823 Port Infrastructure Development Program
- Completion date 26% complete
- Funding
-
- $9,862,367.00 Federal
- $44,807,398.00 Non-federal
- Place of performance
- Green Bay, WI 54301, USA
Award details come from USAspending.gov.
About this award
The Department of Transportation Maritime Administration awarded County of Brown $54,669,765 on February 3, 2026, through the Port Infrastructure Development Program (CFDA 20.823) to redevelop a 44-acre former power plant site into an active port terminal at the Port of Green Bay.
The project funds engineering services, design, and construction supervision alongside physical infrastructure delivery. Work includes installation of approximately 1,750 linear feet of pipe combi wall dock structures with north and south returns, cutoff cantilever wall segments, rear support systems including deadman waler and tieback provisions, and timber rub rail and egress ladder installation. The scope encompasses dredging and dredge disposal, site fill placement and grading behind dock walls, stormwater collection and treatment facilities, utilities installation, asphalt resurfacing of new roads, bollard placement, truck scales, and grading provisions for future rail access (rail easement alignment only; no track construction). Environmental monitoring and turbidity control planning, site preparation including clearing, demolition, temporary erosion control, and fencing, and full on-site construction supervision with quality assurance, quality control testing, and record-keeping are included. Deliverables include final design and construction documents, construction reports, testing submittals, and record drawings.
The site is located at 1530 Bylsby Avenue at the mouth of the Fox River in Green Bay, Wisconsin, in an exclusively industrial area adjacent to Interstate Highway 43 and Canadian National Rail Lines. Period of performance extends from February 3, 2026, through October 31, 2028. The award is assistance funding on a reimbursable basis.
Description
The project includes the following elements engineering services construction of new dock walls and bulkheads dredging and dredge disposal placement of fill behind dock wall and bulkheads construction of stormwater collection and treatment facilities installation of bollards asphalt resurfacing new roads and utilities and truck scales. Deliverables expected outcomes the project is the redevelopment of a roughly 44 acre former power plant site into an active port terminal. The site located at 1530 bylsby avenue at the mouth of the FOX river in the city of green BAY is in an exclusively industrial area of the community adjacent to interstate highway 43 and canadian national rail lines. The project will include the following component 1 engineering design construction supervision & quality assurance QA. Final design and construction documents dock wall installation dredging site fill grading stormwater control and storage asphalt surfacing truck scales and utilities. Rail easement alignment and grading provisions for future rail access no track construction. Prepare environmental monitoring and turbidity control plans and include crane pads as bid alternates. On site construction supervision construction management QA QC testing and recordkeeping. Construction reports testing submittals and record drawings. Component 2 dock wall installation and site development. Install approximately 1750 linear feet pipe combi wall includes north and south returns. Install cutoff cantilever wall segments. Install rear support system deadman waler system tiebacks. Backfill and drainage placement gravel and no 4 stone. Install timber RUB rail and egress ladders. Site preparation temporary erosion control clearing demolition fencing geotextile access road grading aggregate culverts and topsoil seeding. Fill old boat slip and cooling channel to design elevations. Shoreline fill and riprap placement. Mooring bollards and fendering. Stormwater control and storage. Excavate construct ponds. Install clay liners reused from dredging. Furnish place pond outlet structures. Site grading raise and resurface with coarse aggregate 24 inch thickness and asphalt surfacing 4 to 5 inch thickness. Truck scale installation. Required site electrical utility connections with an option for additional utilities. Component 3 dredging and turbidity control. Dredge berth areas to 24 foot navigation depth with 2 feet over dredge limits per permits. Complete post dredge bathymetric surveys. Air monitoring and dust control plan during dredging. Deploy turbidity controls EG silt curtains containment and conduct monitoring during dredging. In river quality monitoring during dredging. Manage dredged material per permits and disposal plans.intended beneficiary county of brown. Subrecipient activities none.
Quick answers
Who received award 693JF72344011?
693JF72344011 was awarded to County Of Brown by Maritime Administration (Department of Transportation) on February 3, 2026.
How much is award 693JF72344011 worth?
$54,669,765 has been obligated on 693JF72344011: $9,862,367 in federal funding and $44,807,398 in non-federal funding.