Project Grant 693JF72344007
- This $108,410,120 federal Project Grant award, issued on August 15, 2024 by the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823), will fund infrastructure improvements at the Port of Alaska in Anchorage. The key activities include demolishing an existing sheet pile wall, removing approximately 1.465 million cubic yards of material, and constructing a new shoreline revetment using armor rock. This project is part...
- This $9,490,000 federal Project Grant, awarded by the U.S. Department of Transportation's Maritime Administration (CFDA 20.823 - Port Infrastructure Development Program), will fund the installation of over 1,000 feet of new floating dock and supporting access, utility, and safety infrastructure within the existing harbor in Aleutians East Borough, Alaska. The project will double the harbor's capacity, increasing moorage space from 254 to approximately 1,308 linear feet to accommodate vessels...
- Federal Project Grant Award Summary The Maritime Administration awarded Alaska Railroad Corporation a $25.424 million Project Grant on September 17, 2025, under the Port Infrastructure Development Program (CFDA 20.823) to expand and improve port infrastructure at the Port of Anchorage. The project encompasses two primary components: (1) comprehensive project administration, environmental compliance, engineering design, and construction management services spanning from preliminary planning...
- Federal Grant Award Summary The U.S. Department of Transportation Maritime Administration awarded the Municipality of Anchorage, Inc. a $312.67 million Project Grant on February 2, 2026, under the Port Infrastructure Development Program (CFDA 20.823) to construct a new general-purpose cargo terminal (T1) at the Don Young Port of Alaska. The project, scheduled for completion by September 30, 2030, encompasses demolition of existing petroleum, oil, and lubricants (POL) and general cargo terminals;...
- This $2,672,985 Project Grant award from the U.S. Department of Transportation's Maritime Administration (CFDA 20.823 - Port Infrastructure Development Program) will fund a feasibility analysis, benefit-cost analysis, site surveys, and geotechnical investigations for the potential development of the first deep water port north of the Arctic Circle in Cape Blossom, Alaska. The City of Kotzebue, the grant recipient, will utilize the funding to conduct studies on vessel navigation, geotechnical and...
- Federal Grant Award Summary The City of Seldovia, Alaska received a $2,998,646 Project Grant from the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823), awarded on April 20, 2026, with an ultimate completion date of July 31, 2028. This project will replace a critical floating pier infrastructure serving the remote and rural community of Seldovia by delivering three primary components: (1) planning, design, and...
- The Economic Development Administration awarded a $9.5 million Project Grant to the Matanuska-Susitna Borough under the Economic Adjustment Assistance program (CFDA 11.307) on July 29, 2021. The funding will support infrastructure improvements at Port MacKenzie in Palmer, Alaska to increase its useful life and efficiency. Specifically, the grant will install 64 steel pile sleeves on an existing deep draft dock and construct a roll-on/roll-off cargo dock. These enhancements are expected to...
- Federal Project Grant Award Summary The Maritime Administration awarded $4.23 million to the Metlakatla Indian Community under the Port Infrastructure Development Program (CFDA 20.823) on November 6, 2025, for comprehensive maritime infrastructure improvements in Metlakatla, Alaska. The project consists of three primary components: (1) design, fabrication, and installation of a replacement fender system for the Metlakatla barge ramp, including removal of existing infrastructure and...
- Federal Grant Award Summary The City & Borough of Wrangell received a $421,000 Project Grant from the U.S. Department of Transportation's Maritime Administration under the Port Infrastructure Development Program (CFDA 20.823), awarded December 30, 2025, with an ultimate completion date of March 31, 2028. The grant funds planning activities for the development of a 40-acre deep water port site in Wrangell, Alaska, designed to support future barge ramp and freight movement operations. The...
- The U.S. Department of Transportation's Maritime Administration awarded the City of Hoonah a $15.51 million Project Grant under the Port Infrastructure Development Program (CFDA 20.823) on December 18, 2025, with completion scheduled for February 29, 2028. The grant funds comprehensive enhancements to the Hoonah Marine Industrial Center cargo dock facility, including the construction of approximately 330 linear feet of open cell sheet pile bulkhead, placement of 23,220 cubic yards of engineering...
The Port of Adak in the Aleutian Islands, Alaska received a $12.78 million Project Grant from the U.S. Department of Transportation's Maritime Administration under the Port Infrastructure Development Program (CFDA 20.823) awarded on May 19, 2026. The Aleut Corporation, as the awardee, will oversee comprehensive improvements to Pier Five, the remote village's primary supply pier. Deliverables include final design and engineering planning with environmental review and permitting; removal of the deteriorated timber pile fender system; installation of a modern high-energy absorbing rubber cylindrical fender system sized for the 58-foot commercial fishing vessel fleet; repair and replacement of damaged prestressed concrete piles and pile caps; installation of catwalks and egress ladders; and placement of anodes on support piles. The project will also add critical infrastructure including firefighting water and general water service lines to the pier. Performance will be measured through quarterly reporting on cargo volume (disaggregated by freight type) and vessel calls at the facility. The project is scheduled for completion by October 30, 2028, with The Aleut Corporation identified as the intended beneficiary. As an Alaska Native Corporation established under the Alaska Native Claims Settlement Act of 1971, The Aleut Corporation leverages its diverse portfolio of subsidiaries specializing in construction, facilities maintenance, and infrastructure development to deliver port improvement projects across federal agencies.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $10.2m | 5/19/26 |