The project funds a port development plan which will include infrastructure and facility assessments site planning preliminary engineering a market analysis a traffic study preliminary real estate and…

Ended Project Grant Awarded Last action

Award ID
693JF72344006
Recipient
Awarding agency
Obligated
$504,794

Award facts

Assistance listing
20.823 Port Infrastructure Development Program
Completion date
Funding
  • $353,293.60 Federal
  • $151,500.00 Non-federal
Place of performance
Palatka, FL 32177, USA

Award details come from USAspending.gov.

Description

The project funds a port development plan which will include infrastructure and facility assessments site planning preliminary engineering a market analysis a traffic study preliminary real estate and environmental assessments and development of a comprehensive capital improvement plan that will identify potential funding sources and project priorities. Activities to be performed the project consists of one component with the following elements examine inspect and test the existing barge berth and concrete apron to determine condition of the berth wall and tie back system remaining service life load bearing capacity lateral and vertical depth of wall embedment and condition and capacity of the concrete apron behind the berth wall that is used for cargo handling equipment loading and offloading typical cargoes. Provide the site planning preliminary engineering design and permitting for the replacement or retrofitting of the barge berth as determined in the previous step to accommodate fully loaded jumbo hopper barges 195 X 35 X 12 two at a time. Perform a market trade lane analysis to identify the ports probable market trade lanes reasonably projected cargoes by type and volume frequency of facility use and resulting port use revenues. Identify plan and preliminarily design required behind the dock cargo laydown areas relieving platforms and fixed cargo handling equipment. Identify requirements for plan and preliminarily design additional near dock warehousing or covered cargo storage based on projected cargoes. Identify plan and preliminarily design the development of near dock freight rail facilities for intermodal freight operations. Perform the traffic projection and flow analysis to plan layout new internal roadway infrastructure to enhance internal cargo movement safety and efficiency. Identify and prioritize the use of county owned properties and acquisition of available properties for port purposes in the vicinity of the berth. For future capital projects based on the port development plan funded by this project perform a preliminary environmental assessment to identify the appropriate nepa document and prepare the section 106 consultation with the state historic preservation office and interested tribes. Develop a comprehensive capital improvement plan in which the ports projects are identified prioritized and scheduled and funding sources at local state and federal levels for each capital project are identified. Deliverables expected outcomes none defined in grant agreement as this is a planning grant. Intended beneficiary county of putnam subrecipient activities none.

Transactions

Action Federal Non-federal Date
Amendment -$206 $0
Original award $353,500 $151,500

Quick answers

Who received award 693JF72344006?

693JF72344006 was awarded to County Of Putnam by Maritime Administration (Department of Transportation) on December 1, 2023.

How much is award 693JF72344006 worth?

$504,794 has been obligated on 693JF72344006: $353,294 in federal funding and $151,500 in non-federal funding.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards
  • Ask GovTribe AI about this award