1 award purpose the port of tacoma off dock container support facility project will develop three contiguous parcels totaling 24 5 acres located west of thorne road and north of maxwell way to support…

Active Project Grant Awarded Last action

Award ID
693JF72245009
Recipient
Awarding agency
Obligated
$49,157,970

Award facts

Assistance listing
20.823 Port Infrastructure Development Program
Completion date 82% complete
Funding
  • $15,730,000.00 Federal
  • $33,427,969.83 Non-federal
Place of performance
Tacoma, WA 98421, USA

Award details come from USAspending.gov.

Description

1 award purpose the port of tacoma off dock container support facility project will develop three contiguous parcels totaling 24 5 acres located west of thorne road and north of maxwell way to support off dock container terminal operations that are currently conducted in limited on dock areas. The utilization of waterfront space will be maximized by consolidating storage and non waterfront dependent activities such as empty container and chassis storage administrative functions and the preparation of refrigerated containers outside of the main terminal. 2 activities to be performed component 1 engineering and design complete final design of project elements activities necessary for completing nepa and obtaining final permits. Component 2 off dock container facility construction single high reefer pre trip wash facility empty refrigerated containers reefers will be washed inspected and tested prior to being sent to a customer for use. The system will recycle wash water collected from the washed containers. Wheeled reefer valet drop off the wheeled reefer valet drop off provides an option for truckers to drop reefers at a designated stall without entering the marine terminal. Roadability lanes four roadability lanes are provided for truck and chassis inspection prior to exiting the site. Power will be provided for an air compressor. Other light work will be conducted with small rechargeable handheld tools for minor repairs. Empty container and chassis storage and repair yard a quonset HUT style structure will support significant chassis repairs. At grade rail crossing the at grade rail crossing provides access between parcels 85 and 87 at the project site allowing truckers to avoid using thorne road maintaining roadway capacity for other users. Asphalt pavement will be used for the crossing. Sliding gates will be located at the parcels boundary. Construct truck entry and exit gates on thorne road and maxwell way with a guard shelter at the maxwell way location. Off site improvements including sidewalks curb streetlights street trees and stormwater infrastructure. 3 deliverables expected outcomes cargo lifts and average daily truck traffic within economic competitiveness and greenhouse gas emissions within environmental sustainability protection 4 intended beneficiary the port of tacoma 5 subrecipient activities none.

Transactions

Action Federal Non-federal Date
Amendment The project will fund construction of an off dock container support facility. Activities to be performed the project will develop three contiguous parcels… $0 $0
Amendment The purpose of this modification is to provide a schedule modification to the original grant agreement executed on may 25 2023. The project schedule has shifted… $0 $0
Original award $15,730,000 $33,427,970

Quick answers

Who received award 693JF72245009?

693JF72245009 was awarded to Port Of Tacoma USA by Maritime Administration (Department of Transportation) on May 25, 2023.

How much is award 693JF72245009 worth?

$49,157,970 has been obligated on 693JF72245009: $15,730,000 in federal funding and $33,427,970 in non-federal funding.