Through this project the new bedford harbor development commission will design and build a north south bulkhead at the north terminal in new bedfords upper harbor

Ended Project Grant Awarded Last action

Award ID
693JF71910007
Recipient
Awarding agency
Obligated
$68,654,962

Award facts

Assistance listing
20.933 National Infrastructure Investments
Completion date
Funding
  • $15,308,579.12 Federal
  • $53,346,383.00 Non-federal
Place of performance
New Bedford, MA 02740, USA

Award details come from USAspending.gov.

Description

The new bulkhead will be backfilled with geotechnically suitable clean sediment as obtained through the construction of a confined aquatic disposal CAD cell supporting navigational harbor dredging. The project includes one major procurement for a contractor that will a build the north terminal bulkhead, B backfill the bulkhead with clean material, and C purchase american-made steel to build thebulkhead. Activities to be performed the north terminal extension project consists of creating a new bulkhead and terminal, backfilling the bulkhead with geotechnically suitable material sourced from a new confined aquatic disposal CAD cell, the CAD cell construction and phase V dredging. North terminal bulkhead this project includes design and construction of an estimated additional 975 linear feet of bulkhead, comprised of cellular cofferdams. The bulkhead will extend from the existing environmental protection agency building site and continue north to adjoin an existing bulkhead that is located north of the area. Component 2 backfill and terminal backfill the newly constructed bulkhead will be backfilled with approximately 200 000 cubic yards of clean suitable material sourced from the CAD cell and an estimated 75000 cubic yards of imported structural fill will be used for the cellular cofferdams terminal approximately 350,000 square feet of upland terminal space will be created through the area backfilled landward of the bulkhead. The terminal area will be filled with a finish layer of dense graded aggregate. Component 3 CAD cell construction and phase V dredging CAD cell construction the project consists of creating a CAD cell within the harbor that will have thecapacity to hold approximately 450 000 to 500 000 cubic yards over an area of 620 000 square feet. The design for the CAD cell has been previously completed. The first layer of approximately 30000 cubic yards of dredged material will be disposed in an existing CAD cell located in the harbor the subsequent layer of approximately 300 000 to 320 000 cubic yards will be disposed at an offshore disposal site and the final layer of approximately 200 000 cubic yards will be used as backfill for the north terminal bulkhead. Phase V dredging the project consists of dredging approximately 70000 cubic yards of contaminated material located in front of the north terminal and approximately 380000 to 430000 cubic yards of contaminated sediment from the harbor. These materials will be placed into the CAD cell. Deliverables expected outcomes see from pages 21 and 22, attachment D of the grant agreement: intended beneficiary city of new bedford subrecipient activities none

Transactions

Action Federal Non-federal Date
Amendment To closeout grant agreement. Activities to be performed the modification will activities close the purchase order LOA. Close the grant agreement. Deliverables… $0 $0
Amendment To RE-obligate 97823.88 to the port due to funds being taken off by error for funds that will expire on 9 30 2025. Activities to be performed RE-OB of expired… $97,824 $0
Amendment -$97,824 $0
Amendment To DE obligate 97823.88 from the port due to funds will expire on 9 30 2025. Activities to be performed DE OB of expired funds. Deliverables none. Intended… -$97,824 $0
Amendment The purpose for this amendment is to amends articles 2.3, summary of projects estimated budget, 2.8, recipient contact and attachment C, estimated project… $0 $53,346,383
Amendment The purpose for this modification is to revise the ports article 2 project, recipient information, sections 2.2, 2.3, 2.4, 2.6, 2.8, article 8, section 8.1,… $0 $0
Original award $15,406,403 $0

Quick answers

Who received award 693JF71910007?

693JF71910007 was awarded to New Bedford Harbor Development Commission by Maritime Administration (Department of Transportation) on January 28, 2020.

How much is award 693JF71910007 worth?

$68,654,962 has been obligated on 693JF71910007: $15,308,579 in federal funding and $53,346,383 in non-federal funding.