The LA posta band of mission indians (RECIPIENT) has, in consultation with the U.S. Bureau ofreclamation (RECLAMATION), developed initial design plans to address sediment and erosion impacting…

Active Grant Awarded

Award ID
R26AP00337
Recipient
Awarding agency
Obligated
$381,644

Award facts

Assistance listing
15.585 Emergency Drought Relief for Tribes
Completion date 9% complete
Place of performance
Boulevard, CA, USA

Award details come from USAspending.gov.

About this award

The Department of the Interior Bureau of Reclamation awarded Grant R26AP00337 to the La Posta Band of Mission Indians on September 14, 2026, with $381,644 obligated under the Emergency Drought Relief for Tribes program (Assistance Listing 15.585). The award funds the planning and design phase of a larger project to address sediment and erosion from Interstate-8 stormwater runoff affecting tribal surface waters, including riparian, wetland, and stream areas. Proposed activities are prioritized as source control for sediment mobilization and erosion, followed by reconstruction and hardening of the emergency access road, then restoration of the impacted wetlands, riparian area, pond, and streambed. Under Task 1, the environmental director will attend meetings and conduct outreach to appropriate agencies during final design and initial construction, and the tribe will contract environmental technical consultants, environmental engineers, and professional hydrologists. Under Task 2, the tribal technical consultant will assist in preparing the environmental planning document, including a habitat restoration assessment, and will work with Reclamation and other agency staff to identify and prepare environmental planning and permitting documents before construction begins. Place of performance is Boulevard, California. The ultimate completion date is September 30, 2028.

Description

The LA posta band of mission indians (RECIPIENT) has, in consultation with the U.S. Bureau ofreclamation (RECLAMATION), developed initial design plans to address sediment and erosion impacting tribalsurface waters including riparian, wetland, and stream restoration. The RECIPIENT is actively workingon efforts to restore environmental, cultural, and recreational resources damaged by stormwaterrunoff from the interstate-8 highway system. Proposed activities have been prioritized to addresssediment mobilization and erosion through source control actions followed by reconstruction andhardening of the emergency access road. Finally, the RECIPIENT proposes to address restoration of theimpacted wetlands and riparian area, pond, and streambed. The goal of the overall larger projectis to restore the riparian and wetland area for wildlife, cultural, and recreational use and harden theemergency access road. The objectives of this program in supporting this overall program goal aredescribed below. This phase of the program includes planning and design to address habitat and surface waterrestoration. To accomplish these goals, the following tasks are required:2.1.1 task 1. Project managementproject management will require the environmental director to attend meetings and conductoutreach to appropriate agencies during the final design and initial construction process. To assistin project management and regulatory compliance capacity, the tribe will contract environmentaltechnical consultants, environmental engineers and professional hydrologists.2.1.2 task 2. Environmental planningenvironmental planning for restoration activities will include habitat restoration assessment thetribal technical consultant will assist in preparing the planning document and will work closelywith RECLAMATION and other appropriate agency staff to ensure all appropriate environmental planning andpermitting documents are identified and prepared prior to construction activities. IT is important tonote that restoration activities may be timeline limited due to wildlife protection mitigation to bedetermined in consultation with the U.S. Fish and wildlife services.2.1.3 task 3. Restoration design and implementationupon completion of the environmental planning document for restoration activities, engineereddesigns will be identified and a professional engineer or hydrologist may be required to completedesign plans for identified restoration activities. Upon completion of design and if permits areapproved by regulatory authorities, restoration construction may be reasonable however, approval will be needed from RECLAMATION to initiate these activities, as they have yet to be identified.

Quick answers

Who received award R26AP00337?

R26AP00337 was awarded to La Posta Band Of Diegueno Mission Indians Of The La Posta Indian Res by Bureau of Reclamation (Department of the Interior) on September 14, 2026.

How much is award R26AP00337 worth?

$381,644 has been obligated on R26AP00337.

On GovTribe

See this award's full record

  • Every transaction and subaward
  • The recipient's other awards and teaming partners
  • Similar grant awards