This project supports the purpose of the authorizing legislation through planning and design improvements to the recipients eastside and westside water utility distribution systems to improve…
Active Grant Awarded
- Award ID
- R25AP00615
- Recipient
-
Pueblo Of Isleta UEI J6A9F1B91QF9
- Awarding agency
-
Bureau of Reclamation
Department of the Interior
- Obligated
- $1,109,539
Award facts
- Assistance listing
- 15.577 Domestic Water Supply Projects
- Completion date 38% complete
- Place of performance
- New Mexico, USA
Award details come from USAspending.gov.
About this award
The Bureau of Reclamation, within the Department of the Interior, awarded Pueblo of Isleta (doing business as Governer's Office) $1.109539 million on April 16, 2026, under the Domestic Water Supply Projects program (CFDA 15.577). The grant runs through an ultimate completion date of November 30, 2027, with work performed in New Mexico. It funds planning and design improvements to the recipient's Eastside and Westside water utility distribution systems to improve reliability, quality, and water-management operations.
Phase I covers the Eastside system. The recipient will conduct planning and preliminary evaluation of the service area, identifying dead-end lines and connectivity needs. It will perform topographic surveys, utility locates, and hydraulic modeling, then develop full design plans, construction drawings, specifications, and cost estimates for new loops connecting separated roads or household clusters not tied into a continuous system.
Phase II covers the Westside system. The recipient will evaluate existing 2-inch distribution lines for age, condition, capacity, and reliability, and identify segments requiring replacement with 6-inch C900 PVC to meet performance and fire flow needs. It will design new looping connections for unconnected or undersized-served areas and prepare surveys, hydraulic analyses, alignment sheets, and complete engineering plans, specifications, and estimates.
Phase III addresses a cross-system transmission connection. The recipient will conduct route selection and feasibility analysis for a new line linking the Eastside and Shea Whiff systems, evaluating hydraulic and operational considerations for a crossing at Hwy 147 near the Isleta Dam Bridge. It will produce full engineering design documents, including survey, environmental compliance support, construction drawings, and detailed cost estimates.
Description
This project supports the purpose of the authorizing legislation through planning and design improvements to the recipients eastside and westside water utility distribution systems to improve reliability, quality, and overall water-management operations throughout its community. Phase I eastside system distribution loopingthe recipient shall: conduct planning and preliminary evaluation of the eastside service area, identifying dead-end lines and connectivity needs. Perform topographic survey, utility locates, and hydraulic modeling to determine optimal line sizes and alignments. Develop full design plans for new distribution line loops connecting separated roads or clusters of households not currently tied into a continuous system. Produce construction drawings, specifications, and cost estimates for planned looping improvements.phase II westside system improvements and loopingthe recipient shall: evaluate existing 2-inch distribution lines on the westside for age, condition, capacity limitations, and service reliability issues. Identify segments requiring replacement with 6-inch C900 PVC to meet system performance and fire flow needs. Design new line looping connections between roads or households that are currently unconnected or served by undersized lines. Prepare surveys, hydraulic analyses, alignment sheets, and complete engineering plans, specifications, and estimates for line replacements and loops.phase III shea whiff to eastside transmission line connectionthe recipient shall: conduct route selection and feasibility analysis for a new transmission line connecting the eastside and shea whiff systems. Evaluate hydraulic requirements and operational considerations for a cross-system connection at HWY 147 near the isleta DAM bridge. Produce full engineering design documents including survey, environmental compliance support, construction drawings, and detailed cost estimates.
Quick answers
Who received award R25AP00615?
R25AP00615 was awarded to Pueblo Of Isleta by Bureau of Reclamation (Department of the Interior) on April 16, 2026.
How much is award R25AP00615 worth?
$1,109,539 has been obligated on R25AP00615.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award